What are the two ways of pile foundation
Pile foundations can be installed in two ways. Timber, steel and precast concrete piles, are driven from the ground using hammers till they reach the firm strata or required depth. Such a method will ensure that the quality of the pile is good as they are prepared under controlled conditions. These are called driven piles. Cast-in-situ driven RCC piles are also in vouge. These are formed by driving steel casing fitted with a dispensive pile shoe fitted to the bottom portion. When the steel casing has been driven to desired depth, steel cage is lowered and concrete is poured and gradually the casing is withdrawn as concreting proceeds. They are of special advantage in offshore and marine construction. When large loads are to be carried and the deplh to which they have to extend comprises of soil having boulders or exhibit refusal strata(N>100), it is necessary to adopt cast-in-situ bored RCC piles.
Figure aside shows a belt conveyors which consists of endless belt. It has a power driven pulley at one end which moves the belt or downward flow of materials. General
Motor shall operate successfully at rated load with a voltage variation of plus or minus ten percent and frequency variation of plus or minus five percent, or combined variation of
Short-Term Scheduling And Control The major objective at this stage is to make sure the efficient and smooth operation of the system in the event of unforeseen disturbances. Th
show that energy of an isolated system is conserved
In a steam jet refrigeration system, the ejector extracts 3.3 m3/s of saturated water vapor at a temperature of 7.2 °C from the flash chamber. The return water from the cooling coi
The Ordinate Dimension Command We can use The Ordinate command to annotate co-ordinate points with X or Y values. This might be useful for setting-out on site plans.
vibration via footpegs and handlebars.
a steel bar is 900 mm long
Q. Show the corrosion mechanisms? The following corrosion mechanisms are likely to happen in the Oil Treating Unit: Under Deposit Corrosion and MIC Since cooling e
assignment help needed
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd