Discuss about the term - end zone, Civil Engineering

Assignment Help:

Discuss about the term - End Zone

It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the cross- section of the concrete member. At the ends of post-tensioned concrete members, anchorages apply the prestressing force on only a part of the cross-section of concrete. As we move from an end towards the middle of the concrete member, the distribution of longitudinal prestresses occupies more and more cross-sectional area. The zone which lies between an end of the member and the section where full cross-sectional area of concrete is subjected to longitudinal prestress is known as end zone. 


Related Discussions:- Discuss about the term - end zone

Temperature requirements for bituminous material, Question In all-purpo...

Question In all-purpose Specification for Civil Engineering Works, it details temperature requirements for bituminous material all through and after mixing. What is cause beh

Construction of passenger terminal building, Construction of Passenger Term...

Construction of Passenger Terminal Building: There are various concepts in planning and constructing passenger terminal buildings. These are : (a)        The international

Batching of concrete, Introdaction , volume batching , weighat batchin...

Introdaction , volume batching , weighat batching , mesaring of water

Railway bridge, how to measure the waterways of railway bridges

how to measure the waterways of railway bridges

Determine the coefficient of compressibility, A saturated clay layer 4 m th...

A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o

What is the meaning of compressive stresses, What is the meaning of compres...

What is the meaning of compressive stresses These intentionally induced stresses are compressive in nature and these compressive stresses reduce or completely remove the undesi

EDTA, how to find total hardness by EDTA

how to find total hardness by EDTA

Calculate the initial height of the stockpile, On a 5-acre level terrain bu...

On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g

What depth is the intensity of pressure zero, A retaining wall with a smoot...

A retaining wall with a smooth vertical back retains a purely cohesive fill. Height of wall is 12 m. Unit weight of fill is 20 kN/m 3 . Cohesion is 1 N/cm 2 . What is the total act

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd