Discuss about the term - end zone, Civil Engineering

Assignment Help:

Discuss about the term - End Zone

It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the cross- section of the concrete member. At the ends of post-tensioned concrete members, anchorages apply the prestressing force on only a part of the cross-section of concrete. As we move from an end towards the middle of the concrete member, the distribution of longitudinal prestresses occupies more and more cross-sectional area. The zone which lies between an end of the member and the section where full cross-sectional area of concrete is subjected to longitudinal prestress is known as end zone. 


Related Discussions:- Discuss about the term - end zone

Define the phreatic line and phreatic zone, Define the Phreatic Line and Ph...

Define the Phreatic Line and Phreatic Zone Phreatic Line: In an unconfined aquifer, it represents the water table.   Phreatic Zone: In an unconfined aquifer, it is located b

Assignment, The obstacles that the students of civil engineering face when ...

The obstacles that the students of civil engineering face when it comes to produce a good piece of writing in English

Design Mix M35/C35, What is the actual mix propotion for M35/ C35 design mi...

What is the actual mix propotion for M35/ C35 design mix concrete

Assignment, How to do assignment on the basis of azetropic mixture

How to do assignment on the basis of azetropic mixture

Deflection in concrete structures, Tension reinforcement leads to increasin...

Tension reinforcement leads to increasing deflection in concrete structures? In BS8110 a modification factor is applied to span/depth ratio to take into account effect of tens

Can you determine the quantity of apron stone, Q. Can you determine the Qua...

Q. Can you determine the Quantity of apron stone? Quantity should be sufficient to cover the scoured face down to maximum depth of scour obtained using scour factor c of 2.5 at

Surveying land, principle of working from whole to part

principle of working from whole to part

Calculate the volume of 896, Solve the following problems related to Wastew...

Solve the following problems related to Wastewater flow and densities (a) The volume of 896, 000 lb of wastewater is? (b)  The weight of 13,000 ft3 of wastewater is? (c) A

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd