Discuss about the term - end zone, Civil Engineering

Assignment Help:

Discuss about the term - End Zone

It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the cross- section of the concrete member. At the ends of post-tensioned concrete members, anchorages apply the prestressing force on only a part of the cross-section of concrete. As we move from an end towards the middle of the concrete member, the distribution of longitudinal prestresses occupies more and more cross-sectional area. The zone which lies between an end of the member and the section where full cross-sectional area of concrete is subjected to longitudinal prestress is known as end zone. 


Related Discussions:- Discuss about the term - end zone

Classification of bricks based on their quality, Classification of Bricks B...

Classification of Bricks Based on their Quality The bricks used in construction are classified as following: First class bricks Second class bricks Third class bric

Solubility - Soil compaction, Solubility: Bitumen is soluble in carbo...

Solubility: Bitumen is soluble in carbon disulphide (CS2). The Indian specifications require that the bitumen should have 99 per cent solubility. Lesser value indicates prese

Define the term- erection stresses, Define the term- erection stresses ...

Define the term- erection stresses The creep loss due to live load stress, erection stresses and other stresses of short duration may be ignored. The loss of prestress due to

What is rapid sand filter, Q. What is Rapid Sand Filter? A Rapid Sand F...

Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement

Explain interim inspection - underwater inspection of bridge, Explain the I...

Explain the Interim inspection - underwater inspection of bridge An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is us

Survey, Operation in chain surveying

Operation in chain surveying

Key role of drilling fluid in rotary drilling, Question What is key rol...

Question What is key role of drilling fluid in rotary drilling in site search? Answer Drill fluid in rotating serves two main reasons. (i) Facilitate rotation of

Compute the porosity of the initial soil sample, A completely saturated sam...

A completely saturated sample of clay has a volume of 31.25 cm 3 and a weight of 0.5866 N. The same sample after drying has a volume of 23.92 cm 3 and a weight of 0.4281 N. Compu

Third law of thermodynamics, Is there any application by using the third la...

Is there any application by using the third law of thermodynamics. A Actual application without explained the calculation

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd