Discuss about the term - end zone, Civil Engineering

Assignment Help:

Discuss about the term - End Zone

It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the cross- section of the concrete member. At the ends of post-tensioned concrete members, anchorages apply the prestressing force on only a part of the cross-section of concrete. As we move from an end towards the middle of the concrete member, the distribution of longitudinal prestresses occupies more and more cross-sectional area. The zone which lies between an end of the member and the section where full cross-sectional area of concrete is subjected to longitudinal prestress is known as end zone. 


Related Discussions:- Discuss about the term - end zone

Streams not wholly alluvial - alluvial streams, Streams Not Wholly Alluvial...

Streams Not Wholly Alluvial In streams which are not wholly alluvial, consisting of bed of pebbles, rock, etc. the liner waterway is kept equal to the actual surface width of

Full bore flow in drainage design, Q. Full bore flow in drainage design? ...

Q. Full bore flow in drainage design? In the design of gravity drainage pipes, full bore flow capacity is usually adopted to check against design runoff. Though one should note

What is function of mortar in brick walls, Q. What is Function of mortar in...

Q. What is Function of mortar in brick walls? A distinctive brick wall structure generally comprises the subsequent components:  (i)  Coping on top of the brick wall to prot

Explain the term - circular prestressing, Explain the term - Circular Prest...

Explain the term - Circular Prestressing This term refers to the case when tendon profile is provided in a round shape, such as in water tanks and pipes, etc.

Timber, defects in timber?

defects in timber?

Fillet welding, Strength of member when fillet welded

Strength of member when fillet welded

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

TIMBER PILE, ADVANTAGE AND DISADVANTAGE OF TIMBER PILE

ADVANTAGE AND DISADVANTAGE OF TIMBER PILE

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd