Discuss about the term - end zone, Civil Engineering

Assignment Help:

Discuss about the term - End Zone

It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the cross- section of the concrete member. At the ends of post-tensioned concrete members, anchorages apply the prestressing force on only a part of the cross-section of concrete. As we move from an end towards the middle of the concrete member, the distribution of longitudinal prestresses occupies more and more cross-sectional area. The zone which lies between an end of the member and the section where full cross-sectional area of concrete is subjected to longitudinal prestress is known as end zone. 


Related Discussions:- Discuss about the term - end zone

Cement, Why we mixm pozzolona in cement

Why we mixm pozzolona in cement

Natural rubber and synthetic rubber, Q. Natural rubber and Synthetic rubber...

Q. Natural rubber and Synthetic rubber? There is often a confusion between the words elastomer and neoprene. While elastomer refers to the generic name of the rubber, neoprene

Pycnometer., To determine the specific gravity of fine aggregate (sand) by ...

To determine the specific gravity of fine aggregate (sand) by Pycnometer.

Trigonometry, #question a pilot entering a bay on course 60.3 degrees at sp...

#question a pilot entering a bay on course 60.3 degrees at speed 12 miles per hour sees a light bearing 37.3 true and 20 minutes later he sees it bearing 20.0 degrees true. if he k

Distomat, Ask quetypes of stion #Minimum 100 words accepted#

Ask quetypes of stion #Minimum 100 words accepted#

Surveying, working from whole to part

working from whole to part

School building, from surveying to school building finish

from surveying to school building finish

Retaining walls, Retaining Walls: Needed to retain the fill portion, a...

Retaining Walls: Needed to retain the fill portion, and generally constructed in dry stone masonry with pucca bunds (Figure). Figure: Typical Design for a Retaining

Timber, seasoning of timber

seasoning of timber

Preparation for underwater inspection - tool and equipment, Preparation for...

Preparation for Underwater Inspection - Availability of Tools and Equipment The engineer-in-charge, before taking up the inspection, should list out the complete equipment req

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd