It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the cross- section of the concrete member. At the ends of post-tensioned concrete members, anchorages apply the prestressing force on only a part of the cross-section of concrete. As we move from an end towards the middle of the concrete member, the distribution of longitudinal prestresses occupies more and more cross-sectional area. The zone which lies between an end of the member and the section where full cross-sectional area of concrete is subjected to longitudinal prestress is known as end zone. 


Related Discussions:- Discuss about the term - end zone

Equipments required for under water inspection of bridge, Define Equipments...

Define Equipments and tools required for under water Inspection of Bridge? Since the underwater inspection of stone masonry substructures involve only a cursory inspection of t

Ocf, location of hydrolic jump

location of hydrolic jump

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Calculate the fuel consumed, A 160-HP Diesel engine (peak fuel consumption ...

A 160-HP Diesel engine (peak fuel consumption = 0.04-gal/HP-hr) hydraulic excavator operates on a cycle time of 20 seconds during a 50-min/hr.  During the filling of the bucket cyc

How to calculate the dry density and void ratio, A moist soil sample compac...

A moist soil sample compacted into a mould of 1000 cm 3 capacity and weight 35 N, weighs 53.5 N with the mould. A representative sample of soil taken from it has an initial weight

Determine the allowable pressue, The data profile as shown in Figure is obt...

The data profile as shown in Figure is obtained. A best average of N values gave N 10 = 21, column loads including dead and live loads ranged from 500 kN to 950 kN. Determine the

Mixed ground with soils and boulders, Ground settlement occurs when pipe-ja...

Ground settlement occurs when pipe-jacking machine enters mixed ground with soils and boulders? The rate of cutting through soils is faster than cutting through boulders for pi

Surveying, define surveying and where it is involved

define surveying and where it is involved

Water retaining structure, Question Why do BS8007 specify permissible c...

Question Why do BS8007 specify permissible crack width of water retaining structure as 0.2mm for severe, extremely severe exposure? Answer For break width less than

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd