Develop a new product from the given product ingredient, Project Management

Assignment Help:

To develop a new product from the given product ingredient.

• explore new ideas for product development,

• understand the concept of development of a process,

• gain knowledge about a technique,

• determine the factors affecting the process of development,

• explain the concept of variations, and

• appreciate the packaging and labeling requirements of the product developed.

Methodology

The process of development of the product in laboratory would involve:

1) Study of the ingredient characteristics

2) Idea generation

3) Feasibility

4) Technique standardization

5) Variations

6) Product standardization

7) Product development

8) Sensory evaluation

9) Product modification

10) Final product

11) Label design and Packaging

Important considerations for the process of development

The process of development would involve exploration of various ideas for example, if the product ingredient provided is  Soya,  one need to study the product characteristics first like it being a rich source of proteins and fat. And also that as it is having low moisture content it can be ground, or made in powdered form.

Thus, the product ideas can be of types:

Soya powder, or paste used in the formation of: Soya flakes
                                                                            Soya papad
                                                                            Soya biscuits
Soya granules can be used for:                                  Namkeen preparation
                                                                           Or any other snack preparation (can be used as filling or in the base product)

Soya milk can be extracted and  products such as shrikhand, sweets, paneer, butter can be prepared.

However, it should be kept in mind that the given ingredient should be the basic or major ingredient in any product formulation.


Related Discussions:- Develop a new product from the given product ingredient

Calculate the net present value for each opportunity, Question: A brill...

Question: A brilliant UTM student at the end of his graduation is in presence of two opportunities and has to choose between them. One is a job offer with a salary of Rs15,000

Numerical problems, Hi, I need help in learning and solving 20 questions n...

Hi, I need help in learning and solving 20 questions numerical which involves PM techniques from selection, planning, execution and controlling techniques. I want to know how can

Management skills required for a successful manager, How are the management...

How are the management skills required for a successful manager? Management Skills: The skills needed of a successful manager, while he is working into a industry,

What do you mean by the term dependency, What do you mean by the term depen...

What do you mean by the term dependency? How can project dependencies be shown for planning reasons? Dependency arises when, for illustration, task or deliverable 'A' should be

Six sigma, doing research for six sigma

doing research for six sigma

Disadvantages of product layout - inflexibility, Disadvantages of Product L...

Disadvantages of Product Layout - Inflexibility Inflexibility is a drawback of this type of layout. The equipment laid out is designed to perform specific operations. No machi

Customer orientation - total quality management, IT is the ultimate goal...

IT is the ultimate goal in TQM and thus forms the focal element in TQM. The company should exceed the customer expectations and make him delighted. This means giving

Illustrate an example of a critical path given by activity, Illustrate an e...

Illustrate an example of demonstrating a network or critical path by given activity and duration. Activity                      Duration (Wks)                   Precede

What do you meant by change of scope in a project, Question: (a) (i) Wh...

Question: (a) (i) What do you meant by "a change of scope" in a project? (ii) Unplanned changes (for e.g, unplanned expenses) might occur during the implementation phase of

Techniques of project management tools, Over the years, E has had a number ...

Over the years, E has had a number of business successes in the building trade and property development. Her latest venture is to build a hotel in YX town. E has already gained the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd