Develop a new product from the given product ingredient, Project Management

Assignment Help:

To develop a new product from the given product ingredient.

• explore new ideas for product development,

• understand the concept of development of a process,

• gain knowledge about a technique,

• determine the factors affecting the process of development,

• explain the concept of variations, and

• appreciate the packaging and labeling requirements of the product developed.

Methodology

The process of development of the product in laboratory would involve:

1) Study of the ingredient characteristics

2) Idea generation

3) Feasibility

4) Technique standardization

5) Variations

6) Product standardization

7) Product development

8) Sensory evaluation

9) Product modification

10) Final product

11) Label design and Packaging

Important considerations for the process of development

The process of development would involve exploration of various ideas for example, if the product ingredient provided is  Soya,  one need to study the product characteristics first like it being a rich source of proteins and fat. And also that as it is having low moisture content it can be ground, or made in powdered form.

Thus, the product ideas can be of types:

Soya powder, or paste used in the formation of: Soya flakes
                                                                            Soya papad
                                                                            Soya biscuits
Soya granules can be used for:                                  Namkeen preparation
                                                                           Or any other snack preparation (can be used as filling or in the base product)

Soya milk can be extracted and  products such as shrikhand, sweets, paneer, butter can be prepared.

However, it should be kept in mind that the given ingredient should be the basic or major ingredient in any product formulation.


Related Discussions:- Develop a new product from the given product ingredient

Characteristics of flexible manufacturing system, Characteristics of Flexib...

Characteristics of Flexible Manufacturing System An FMS is a process technology that can product a moderate variety of products in modest volumes and can do so quickly and wit

Advantages of product layout - scientific materials handling, Advantages of...

Advantages of Product Layout - Scientific Materials Handling This layout facilities adoption of automatic handling devices. The channelization of  work flow  through  direct

Monitoring tasks for project quality management, Question : (a) Any pro...

Question : (a) Any project has a beginning and an end; without a formal closure process, project teams can fail to recognize the end and this can drag the project into unneces

Project risk and procurement management, The management of risk is proving ...

The management of risk is proving to be one of the most difficult tasks for the project management profession. How can risk be managed effectively and who should be responsible for

#title.Risk management and procurement, Critically evaluate the use of comp...

Critically evaluate the use of complex models of Project Risk and Procurement Management; systematically and creatively making sound judgements based on the systematic analysis and

Risk management in the tqm framework, Risk Management  in the TQM Framewor...

Risk Management  in the TQM Framework   Total  Quality Management (TQM) is one of the widely used project management technique or approach. TQM mainly concentrates on process m

Managing project quality as per pmi, M a n a ging Project Quality as pe...

M a n a ging Project Quality as per PMI Project Management Institute (PMI) is a global organisation for the project management profession; it is engaged in setting professi

Define the design phase of the project management, Define the Design phase ...

Define the Design phase of the project management. Design phase:   The list of needs which is developed within the definition phase can be utilized to make design alte

Develop a integrated management project, You are not expected to submit a f...

You are not expected to submit a formal proposal. However, you will be able to access Subject Tutors via HenleyConnect and you may seek feedback from them as to the suitability and

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd