Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Two single-phase 60-Hz sinusoidal-source generators (with negligible internal impedances) are supplying to a common load of 10 kW at 0.8 power factor lagging. The impedance of the feeder connecting the generator G1 to the load is 1.4 + j1.6 , whereas that of the feeder connecting the generator G2 to the load is 0.8 + j1.0 . If the generator G1, operating at a terminal voltage of 462 V (rms), supplies 5 kW at 0.8 power factor lagging, determine:
(a) The voltage at the load terminals;
(b) The terminal voltage of generator G2; and
(c) The real power and the reactive power output of the generator G2.
A 150 km long, 3-phase, 400 kV overhead line is used to transmit 1800 MW to a distribution area at 0.9 power factor lagging. The line parameters per phase and per unit length in st
A small signal amplifier circuit is given in figure Q 4. The values of RD and RS must be set such that the gain of the system is 8. It is also known that Vgs = ¼ Vp. a). Per
Explain Soft magnetic materials. Soft magnetic materials -They contain small enclosed area of hysteresis loop, high permeability low eddy current losses and high saturation
explain about signal
Q. Explain working of Biased Clamper? Biased Clamper : The circuit of a positively biased clamper is shown in the figure. During the negative half cycle of the input signal the
The operating frequency range of a superheterodyne FMreceiver is 88-108MHz. The IF and LO frequencies are so chosen that f IF LO .Ifthe image frequency f c must fall outside of
Q. Current-carrying conductors? Current-carrying conductors, when placed in magnetic fields, experience mechanical force. Considering only the effect of the magnetic field, the
Illustrates about the power dissipation management in embedded system? Power Dissipation Management a. Clever real-time programming through Wait and Stop instructions b.
Multiple Tariff Meters or TOU Meters Time of use metering facilitates load control and planning on the part of utilities. This is efficiently achieved using a concept known as
What is TSR? TSR: The TPA also as TSR stand for terminate and stay resident programs which remain in memory in an active state till activated by a hot-key sequence or other eve
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd