Determine the uses of prestressed concrete poles, Civil Engineering

Assignment Help:

Determine the uses of Prestressed concrete poles

Prestressed concrete poles are commonly mass produced and are used in most countries for power transmission, antenna masts etc. The main advantages of prestressed concrete poles are the following :

 (a) Resistance to freeze-thaw effects in cold climate,

(b) Resistance to corrosion in moist conditions and to erosion in desert areas,

 (c) Easy handling and transportation due to less self weight,

(d) Fire resistance,

(e) Easy installation,

(f) Clean and neat appearance, and (g) Increased crack resistance and improved rigidity.

 


Related Discussions:- Determine the uses of prestressed concrete poles

Bitumen, limitation in using with bitumen as watertight material

limitation in using with bitumen as watertight material

Design Mix M35/C35, What is the actual mix propotion for M35/ C35 design mi...

What is the actual mix propotion for M35/ C35 design mix concrete

Define compression - actions in pot bearings, Define Compression - Actions ...

Define Compression - Actions in POT Bearings? Vertical load is carried through the piston of the bearing and it is resisted by the elastomeric pad. Elastomer is incompressible,

Pressure distribution under rigid and flexible footings, Pressure distribut...

Pressure distribution under rigid and flexible footings For rigid and thick footings, pressure distribution under the footings is generally presumed to be linear. If symmetric

Computation of settlement, Q. Computation of Settlement? The settlement...

Q. Computation of Settlement? The settlement  in any soil mass under an applied stress is given by s = s i + s c + s s where, S  =  total settlement, S i =  imm

I am expert i this field, i require a workquestion #Minimum 100 words acce...

i require a workquestion #Minimum 100 words accepted#

Surveying, dumpy level and its procedure

dumpy level and its procedure

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd