Determine the head loss, Mathematics

Assignment Help:

A 3 km pipe starts from point A end at point B

Population = 3000 people

Q = 300 L/day/person

Roughness = cast ion pipe

Length of the pipe = 3km

Case 1

From A to B slope is 0°

Case 2

From A to B slope is 5° up ward

Case 3

From A to B slope is 3° down ward

Plot

Head loss

20 cm

 

40 cm

 

80 cm

 

100 cm

 

150 cm

 

200 cm

 

Determine the Head loss ?


Related Discussions:- Determine the head loss

Elementary row operations, Anne, Betty and Carol went to their local produc...

Anne, Betty and Carol went to their local produce store to buy some fruit. Anne bought one pound of apples and two pounds of bananas and paid $2.11. Betty bought two pounds of appl

Derivative, Uses of derivative in daily life with examples.

Uses of derivative in daily life with examples.

Find the length of the parallelogram, The perimeter of a parallelogram is 5...

The perimeter of a parallelogram is 50 cm. The length of the parallelogram is 5 cm more than the width. Find the length of the parallelogram. Let w = the width of the parallelo

Probability, a die was rooled 500 times and number of times 4 came up was n...

a die was rooled 500 times and number of times 4 came up was noted if the imperical probability calculated from this information 7_10

Comparing and scaling, a dairy mngr says it takes 70lbs of make 10 lbs of c...

a dairy mngr says it takes 70lbs of make 10 lbs of cottage cheese... How do I make a rate table and a make a graph showing the relationship between lbs of milk and lbs of cottage c

Trigonometry, if tan theta =1,find the value of sin4 theta + cos4 theta

if tan theta =1,find the value of sin4 theta + cos4 theta

Interpretation, Interpretation A high value of r as +0.9 or - 0...

Interpretation A high value of r as +0.9 or - 0.9 only shows a strong association among the two variables but doesn't imply that there is a causal relationship that is

The expected monetary value method, The expected monetary value method ...

The expected monetary value method The expected pay off as profit associated with a described combination of act and event is acquired by multiplying the pay off for that act a

Compound interest, you have RM5O,OOO to invest,and two fund that you''d li...

you have RM5O,OOO to invest,and two fund that you''d like to invest in.The You-Risk-It Fund yields 14% interest.The Extra-Dull Fund yields 6% interest.Besause of college financial-

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd