Determine the expected extension at the jack, Civil Engineering

Assignment Help:

A cylindrical concrete tank, 30 m external diameter, is to be prestressed circumferentially by means of  high-strength steel wire (E, = 2 x  105  N/mm2)  jacked  at 4 points, 900 apart. If  the minimum stress  in the wire immediately after tensioning is to be 450 N/mm2  and coefficient of friction is 0.5, calculate :

(a) The maximum stress to be applied to the wires at the  jack, and

(b) The expected extension at  the jack.

 


Related Discussions:- Determine the expected extension at the jack

Determine the ground elevation, The trigonometric levelling from the survey...

The trigonometric levelling from the surveyor's notes is shown below. The ground elevation of T (ft) is most nearly: Solution:  The elevation of point P can be found from: E

Doors, About Doors,windows&vendilators

About Doors,windows&vendilators

Factors affecting location decision, Factors Affecting Location Decision: ...

Factors Affecting Location Decision:   Mining, quarrying and heavy manufacturing have capital intensive facilities that are costly to build and cover large area and use large q

Surveying, sample problems with solutions for probable value

sample problems with solutions for probable value

Design the water supply system a high service tank, Q. There is a railway c...

Q. There is a railway colony of 500 house holds source of water is from a tube well 800 m away. The colony is 10 m higher then the ground at source. Tube well is 60 meters deep. De

What is immediate settlement, Q. What is Immediate Settlement? Strain i...

Q. What is Immediate Settlement? Strain in all coarse grained, dry or partly saturated fine grained soils occur immediately after the application of stress. Hence, this change

Construction measurment, calculating quantity of excavation, formwork, conc...

calculating quantity of excavation, formwork, concrete

Construction - concrete pavement, Construction: Construction is usual...

Construction: Construction is usually done by one of the three methods: (a) Manual method, providing steel or wooden forms, pouring concrete and compacting by means of nee

Survey chain, describe gunters chain in survey

describe gunters chain in survey

What is rapid sand filter, Q. What is Rapid Sand Filter? A Rapid Sand F...

Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd