Ans.-Important items to be inspected during level Crossing inspection -

i. Examination of Gate equipment and Gateman in Rules.

ii. Obstruction of view.

iii. Condition of sleepers and fittings, rails and fastenings inspected at least once a year or more frequently.

iv. The painting of gates and discs.

v. Whistle boards and 'STOP' boards provided on the approaches to level crossings.

vi. The Assistant Engineer should inspect the equipment at every manned level crossing on the sub-division every six months, and examine the Gateman in rules during his inspection.

vii. The Assistant Engineer should scrutinise the manuscript register of level crossing maintained by the Permanent Way Inspectors and inspect as many level crossings as possible, when they are completely opened out during the year.

viii. Visibility Requirements for unmanned Level Crossings.

ix. Provision of speed breakers on the approaches of level crossing.

x. Appointment of Gatemen , Rosters and Medical fitness Certificates.-

xi. Gate Lamps and Blinders.


Related Discussions:- Important items during level crossing inspection

Concrete technology, what is the actual quantity of water to be mixed in va...

what is the actual quantity of water to be mixed in various grade of concrete and also the size of gravel to be mixed with in RCC work. Also I want to know the difference between a

Angular messurement using total stations, write a short note on angular mes...

write a short note on angular messurement using stations?

Determine the natural frequencies - shear building, For the shear building ...

For the shear building shown, determine the natural frequencies (RAD/SEC) and the modal matrix. Also, sketch the deflected buildings in their normal modes using the top floor as th

Explain total dynamic head (tdh), Total Dynamic Head: (TDH) y-axis plo...

Total Dynamic Head: (TDH) y-axis plot point related to each x-axis flow rate along the system curve plot. TDH = h a = TSH + h f + v 2 /2g       v 2 / 2g usually small

Designing lateral resistance of piles, Question While designing later...

Question While designing lateral resistance of piles , have to engineers only use earth pressure against pile caps simply? Answer In case of designing lateral loa

Thermal coefficient, Thermal Coefficient Inside of the building's tempe...

Thermal Coefficient Inside of the building's temperature can increase or reduce the snow weight. As these types of structures normally cover a wide area and heating or even tur

Concrete technology, material for formwork and their specifications

material for formwork and their specifications

Define analytical methods approved under the clean water act, Define Analyt...

Define Analytical Methods Approved Under the Clean Water Act? Analytical Methods Approved Under the Clean Water Act CWA Section 304(h) needs EPA to publish test procedures (ana

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd