Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing.

Ans.-Important items to be inspected during level Crossing inspection -

i. Examination of Gate equipment and Gateman in Rules.

ii. Obstruction of view.

iii. Condition of sleepers and fittings, rails and fastenings inspected at least once a year or more frequently.

iv. The painting of gates and discs.

v. Whistle boards and 'STOP' boards provided on the approaches to level crossings.

vi. The Assistant Engineer should inspect the equipment at every manned level crossing on the sub-division every six months, and examine the Gateman in rules during his inspection.

vii. The Assistant Engineer should scrutinise the manuscript register of level crossing maintained by the Permanent Way Inspectors and inspect as many level crossings as possible, when they are completely opened out during the year.

viii. Visibility Requirements for unmanned Level Crossings.

ix. Provision of speed breakers on the approaches of level crossing.

x. Appointment of Gatemen , Rosters and Medical fitness Certificates.-

xi. Gate Lamps and Blinders.


Related Discussions:- Important items during level crossing inspection

Storm water, what are the roles of civil engineers in storm water managemen...

what are the roles of civil engineers in storm water management

FOUNDATION, TYPE OF FOUNDATION IN LATERITE SOIL

TYPE OF FOUNDATION IN LATERITE SOIL

Lines, find the equation of the line with slope 4 and passing through the p...

find the equation of the line with slope 4 and passing through the point of intersection of the line x+6y-4=0 ad 3x-4y+2=10

Slab, Design of one way slab, two way slab, circular slab, hollow slab step...

Design of one way slab, two way slab, circular slab, hollow slab step by step as ACI code 318-08, tnx

Fundamental of physics, state and prove Heisenberg uncertainity principle?

state and prove Heisenberg uncertainity principle?

State the effect of the induction of the pre-stresses, State the effect of...

State the effect of the induction of  the pre-stresses The net effect of the induction of  the pre-stresses shall be to decrease the tensile stresses (produced due to the exte

Explain the shrinkage strain of concrete, Explain the shrinkage strain of c...

Explain the shrinkage strain of concrete Shrinkage of concrete depends only on the interval of time and the moisture conditions, but is independent of the stresses in the membe

Design the 2-span continuous center, Design the 2-span continuous center T-...

Design the 2-span continuous center T-beam, B2, for the floor syetem shown below. The girders that the beam frames into are all 24" wide. Using fc'= 5 ksi, and fy = 60 ksi. The ser

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd