Designing of pipe jacking, Civil Engineering

Assignment Help:

Question

While designing of pipe jacking, what particular areas on pipe joints have to engineers make sure of?


Answer

While in pipe jacking, jacked pipes may well hardly be jacked in designed level and alignment and a number of deviation from original one is commonly adequate provided that deviation are within tolerance of Contract. Though, in order to let alone damage made to pipe joints due to overstressing, it is essential to estimate stress concentrations resulting from these pointed deflections.

 

 


Related Discussions:- Designing of pipe jacking

Building construction drawings, I need a drawing detail of expansion joints...

I need a drawing detail of expansion joints in building and different sizes

Explain brake and electrical horsepower, Explain Brake and Electrical Horse...

Explain Brake and Electrical Horsepower Brake horsepower (bhp) = whp/pump efficiency Electrical or motor horsepower (ehp) or (mhp) = bhp/motor efficiency Friction of heat

Moisture content, What is moisture content for road work

What is moisture content for road work

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Determine about the prestressed concrete, Determine about the Prestressed c...

Determine about the Prestressed concrete Prestressed concrete is a special type of concrete in which internal stresses of a suitable nature, magnitude and distribution are int

Explain the bearing capacity failure, A continuous wall footing, 1 m wide,...

A continuous wall footing, 1 m wide, rests on sand, the water table lying at a great depth. The corrected N-value for the sand is 10. Verify the load which the footing can support

Construction measurment, calculating quantity of excavation, formwork, conc...

calculating quantity of excavation, formwork, concrete

Why does pipe jacking machine usually get stuck, Q. Why does pipe jacking m...

Q. Why does pipe jacking machine usually get stuck when the ground condition change from soil to very hard rock? When pipejacking machine moves from anarea of soil to very hard

Write short notes on bulking of sand, Q. Write short notes on Bulking of Sa...

Q. Write short notes on Bulking of Sand? Volume of sand fluctuates with variations in moisture content when sand is wet then each particle sets coating of water due to surface

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd