Designing of pipe jacking, Civil Engineering

Assignment Help:

Question

While designing of pipe jacking, what particular areas on pipe joints have to engineers make sure of?


Answer

While in pipe jacking, jacked pipes may well hardly be jacked in designed level and alignment and a number of deviation from original one is commonly adequate provided that deviation are within tolerance of Contract. Though, in order to let alone damage made to pipe joints due to overstressing, it is essential to estimate stress concentrations resulting from these pointed deflections.

 

 


Related Discussions:- Designing of pipe jacking

Reinforced Concrete Design, design a 3-meter cantilever slab to carry a uni...

design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Timber, seasoning of timber

seasoning of timber

Manufacturing technique of ferro cement, what are the manufacturing techniq...

what are the manufacturing techniques of ferro cement?

Explain sedimentation, Explain Sedimentation 1. Sedimentation bas...

Explain Sedimentation 1. Sedimentation basin or clarifier is used to remove particles that will settle in a reasonable time period 2. Basins are usually rectangular or

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd