Designing of pipe jacking, Civil Engineering

Assignment Help:

Question

While designing of pipe jacking, what particular areas on pipe joints have to engineers make sure of?


Answer

While in pipe jacking, jacked pipes may well hardly be jacked in designed level and alignment and a number of deviation from original one is commonly adequate provided that deviation are within tolerance of Contract. Though, in order to let alone damage made to pipe joints due to overstressing, it is essential to estimate stress concentrations resulting from these pointed deflections.

 

 


Related Discussions:- Designing of pipe jacking

Longitudinal steel – an enhancement of shear strength, Q. Longitudinal stee...

Q. Longitudinal steel – an enhancement of shear strength ? Furthermore to shear resistance provided by shear reinforcement, shear forces in a concrete section is also resisted

Workshop drawings, Workshop Drawings  (Contractor Scope) 1. Air Co...

Workshop Drawings  (Contractor Scope) 1. Air Conditioning and Ventilation Systems: Builder work drawings Enlarged scale double line HVAC System Duct & piping layouts

Explain the mechanism of compaction by paver, Q. Explain the Mechanism of c...

Q. Explain the Mechanism of compaction by paver? Mechanism of compaction by paver, steel-wheeled roller and pneumatic tire rollers Paver, steel-wheeled roller and pneumat

What do you understand by pressure line, What do you understand by Pressure...

What do you understand by Pressure line If we determine the locations of resultant force at various sections of a pre-stressed beam, as in Example, we can draw a curve showing

Determine the coefficient of compressibility, A saturated clay layer 4 m th...

A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Surveying, how to defined work from whole to the part

how to defined work from whole to the part

Structural analysis, explain the steps to analyse a portal frame with sway ...

explain the steps to analyse a portal frame with sway condition

#title., what is the cause of scale and sludge formation and its diadvantag...

what is the cause of scale and sludge formation and its diadvantages

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd