While designing of pipe jacking, what particular areas on pipe joints have to engineers make sure of?
Answer
While in pipe jacking, jacked pipes may well hardly be jacked in designed level and alignment and a number of deviation from original one is commonly adequate provided that deviation are within tolerance of Contract. Though, in order to let alone damage made to pipe joints due to overstressing, it is essential to estimate stress concentrations resulting from these pointed deflections.
Q. Natural rubber and Synthetic rubber? There is often a confusion between the words elastomer and neoprene. While elastomer refers to the generic name of the rubber, neoprene
Demonstrate the economical design of concrete A safe, serviceable and economical design of concrete structures requires a comprehensive knowledge of the loads expected to be a
A W12x58 member, which comprises a vertical member in a truss span, is subjected to a factored axial compressive force of 163 kips. The W12x58 section is oriented such that the st
what is breast retaining wall?
briefly explain about c tokens ?
Didtribution of shear stree over a triangular section
Change the model to take into account the variation in outdoor temperature for a "typical" day in the heating season based on the heat loss by the fabric and the heating of incomin
Define Inspection of Pier or Abutment? Inspection of pier/abutment may then be carried out as under: i. Conduct visual inspection of the entire surface using up and down swe
Define Reinforcing Steel - Limitations of Ultrasonic System? The sound velocity measurement taken parallel to the reinforcing bars embedded in the concrete will be markedly hig
Q. Grouting in segmental linings in tunnels? Grouting is typically carried out under pressure in segmental linings at the time of tunnel construction due to the below reasons:
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd