Explain the unit hydrograph - hydrology, Civil Engineering

Assignment Help:

Define Unit Hydrograph

Hydrograph of one inch or 1cm of precipitation over a drainage basin area (watershed). It is the base hydrograph from which other hydrographs can be determined by ratio when other precipitation quantities( < or > l inch or 1 cm) are known for the same drainage basin area. Also, calculating the "storm", or "surface water", or "overland flow" hydrograph and knowing the precipitation quantity, this method can be used to determine the plot points for a unit hydrograph for the same drainage basin area.

 


Related Discussions:- Explain the unit hydrograph - hydrology

What is bore hole, What is Bore Hole In exploration of  area of  limit...

What is Bore Hole In exploration of  area of  limited extent  the borings should preferably be located near the comers of  the area. A minimum of three holes should be made un

Theories of failure - cases of solids, Theories of Failure - cases of solid...

Theories of Failure - cases of solids: Let us now consider the solid shown in Figure (b). (a)        As the principal stresses are within 260 MPa, the solid is safe ac

Total station, describe in detail the various parts of a total station

describe in detail the various parts of a total station

Bitumen, limitation in using with bitumen as watertight material

limitation in using with bitumen as watertight material

Shear Iosipescu Test, First Can I use this device to test concrete specimen...

First Can I use this device to test concrete specimen? Second it is very important for me that wouldn’t have tensile strength when I want to fix specimens. Because the specimens su

What is the pre-tensioned concrete, What is the Pre-tensioned concrete ...

What is the Pre-tensioned concrete In Pre-tensioned concrete tendons are kept stretched with suitable mechanisms and concrete is cast into the forms through which stretched ten

Retaining wall, I retained the soil in my yard by brick with 3 levels to a...

I retained the soil in my yard by brick with 3 levels to avoid sliding the soil to the street. the appeared part of the bricks from each level is 3 feet and less.The hidden part o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd