Practice to form washout regulators, Civil Engineering

Assignment Help:

Question

Why are two gate regulators necessary in regular practice to form washout regulators?


Answer

In fact, situation is analogous to that of fire hydrants in that two gates valves are installed with a on its own fire hydrant. Washout valves are used for regular maintenance work of watermain like allowing flowing out of water throughout cleaning of watermain. At junction anywhere a tee-branch out to a washout point, a gate valve is installed to divide two pipelines. However, this gate valve is open throughout normal operation as another gate valve further downstream is installed. If downstream gate valve is not installed in position, then pipe section of branched-out watermain will be left dry during normal operation and there is a high probability that break to watermain and frequent leakage would happen. With downstream gate control device installed, segment of branched-out watermain consists water in regular operation. In a case there is any leakage, it be able to be readily detected by using two gate regulators.

 


Related Discussions:- Practice to form washout regulators

Define abrasion of steel structures - inspection of bridge, Define Abrasion...

Define Abrasion of steel structures? Abrasion of steel structures can generally be recognised by a worn, smooth, polished appearance of the surface.  Abrasion is caused by cont

What is portal cranes, Q. What is Portal Cranes? The Portal crane is a ...

Q. What is Portal Cranes? The Portal crane is a hydraulically driven four wheeled machine and is meant for carrying sleepers or track panels. The power for running and working

Describe the features of physical survey phase, Describe the features of ph...

Describe the features of physical survey phase The Physical Survey (field and laboratory test) for the purpose of determination of physical and engineering properties of the ma

Determine condition of activity in the network flow diagram, Determine the ...

Determine the condition of each activity in the network flow diagram shown below   Ans: a. Activity C can be started only after the completion of activities A and

Hybridisation, Why hybridisation never take in isolated atom

Why hybridisation never take in isolated atom

Determine the factor of safety against overturning, A trapezoidal masonry r...

A trapezoidal masonry retaining wall 1 m wide at top and 3 m wide at its bottom is 4 m high. The vertical face is retaining soil (φ = 30°) at a surcharge angle of 20° with the hori

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd