Practice to form washout regulators, Civil Engineering

Assignment Help:

Question

Why are two gate regulators necessary in regular practice to form washout regulators?


Answer

In fact, situation is analogous to that of fire hydrants in that two gates valves are installed with a on its own fire hydrant. Washout valves are used for regular maintenance work of watermain like allowing flowing out of water throughout cleaning of watermain. At junction anywhere a tee-branch out to a washout point, a gate valve is installed to divide two pipelines. However, this gate valve is open throughout normal operation as another gate valve further downstream is installed. If downstream gate valve is not installed in position, then pipe section of branched-out watermain will be left dry during normal operation and there is a high probability that break to watermain and frequent leakage would happen. With downstream gate control device installed, segment of branched-out watermain consists water in regular operation. In a case there is any leakage, it be able to be readily detected by using two gate regulators.

 


Related Discussions:- Practice to form washout regulators

Define water jets for underwater inspection of bridge, Define Water jets fo...

Define Water jets for underwater inspection of bridge? These tools are widely used and produce a bright metal finish in one operation. Grit entrainment is available and makes t

Diferential equations, show that Y = 4e2x - 2e-3x is a solution of initia...

show that Y = 4e2x - 2e-3x is a solution of initial-value problem (d2y)/(dx2)+ (dy)/(dx) - 6y=0 ; y(0)=6 ; y’(0)=2 . is Y = 2e2x - 4e-3x also a solution of this proble

The senior project, I want to know what materials should I use for roofing ...

I want to know what materials should I use for roofing on the steel truss roof for a storage building 18x60 sqft

Explain the primary treatment for wastewater, Explain the Primary Treatment...

Explain the Primary Treatment for Wastewater Primary Treatment: to remove the pollutants that floats or settles. Typically 60% of suspended solids and 35% of BOD 5 are removed

Design of the aeration basin based on solids retention time, Design of the ...

Design of the Aeration Basin Based on Solids Retention Time - sewer construction: You are provided the following information about a municipal wastewater treatment plant. That

Equipments required for under water inspection of bridge, Define Equipments...

Define Equipments and tools required for under water Inspection of Bridge? Since the underwater inspection of stone masonry substructures involve only a cursory inspection of t

Define lead lag relationships - construction management, Define Lead Lag Re...

Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd