Practice to form washout regulators, Civil Engineering

Assignment Help:

Question

Why are two gate regulators necessary in regular practice to form washout regulators?


Answer

In fact, situation is analogous to that of fire hydrants in that two gates valves are installed with a on its own fire hydrant. Washout valves are used for regular maintenance work of watermain like allowing flowing out of water throughout cleaning of watermain. At junction anywhere a tee-branch out to a washout point, a gate valve is installed to divide two pipelines. However, this gate valve is open throughout normal operation as another gate valve further downstream is installed. If downstream gate valve is not installed in position, then pipe section of branched-out watermain will be left dry during normal operation and there is a high probability that break to watermain and frequent leakage would happen. With downstream gate control device installed, segment of branched-out watermain consists water in regular operation. In a case there is any leakage, it be able to be readily detected by using two gate regulators.

 


Related Discussions:- Practice to form washout regulators

Track design for line speed improvements, The objective of this module is:-...

The objective of this module is:- For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibil

Deflectin of beam, simply supported beam with point load at the centre

simply supported beam with point load at the centre

Plane table, what is traversing plane table?

what is traversing plane table?

Main principle of post-grouting for mini-piles, Question What is main p...

Question What is main principle of post-grouting for mini-piles? Answer During course of post-grouting , a tube with a hole at its base is lowered into pile and g

Compute the safe bearing capacity of a square footing, Compute the safe bea...

Compute the safe bearing capacity of a square footing 1.5 m × 1.5 m, located at a depth of 1 m below the ground level in a soil of average density 20 kN/m 3 .   = 20°, N c = 17.7,

Minimisation of differential settlement, Minimisation of Differential Settl...

Minimisation of Differential Settlement You are aware that differential settlement causes more distress to the structure, when compared with that of total settlement. The var

I have a take home quiz, Hello I have a take home final needs be ordered, d...

Hello I have a take home final needs be ordered, do you have very well skilled professionals to make it?

Concrete, Determine the quantity of materials required per batch and probab...

Determine the quantity of materials required per batch and probable output from a concrete mixing plant of 1200lts capacity. The design per 1000lts of mixed concrete is as follows

Static, Determine the moment of inertia with respect to the x axis for the ...

Determine the moment of inertia with respect to the x axis for the shaded area shown (Figure 2) . The dimension is a = 2.00m .

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd