Practice to form washout regulators, Civil Engineering

Assignment Help:

Question

Why are two gate regulators necessary in regular practice to form washout regulators?


Answer

In fact, situation is analogous to that of fire hydrants in that two gates valves are installed with a on its own fire hydrant. Washout valves are used for regular maintenance work of watermain like allowing flowing out of water throughout cleaning of watermain. At junction anywhere a tee-branch out to a washout point, a gate valve is installed to divide two pipelines. However, this gate valve is open throughout normal operation as another gate valve further downstream is installed. If downstream gate valve is not installed in position, then pipe section of branched-out watermain will be left dry during normal operation and there is a high probability that break to watermain and frequent leakage would happen. With downstream gate control device installed, segment of branched-out watermain consists water in regular operation. In a case there is any leakage, it be able to be readily detected by using two gate regulators.

 


Related Discussions:- Practice to form washout regulators

Categories of losses of prestress, Categories of losses of prestress We...

Categories of losses of prestress We may put various losses in either of two categories : Losses which take place during transfer of  prestress and those which take place after

Frames, how to analyse a frame

how to analyse a frame

Surface cleaning tools for underwater inspection of bridge, Define Surface ...

Define Surface Cleaning Tools for Underwater Inspection of Bridge? To perform a thorough inspection, the marine growth on the structure must be removed. This can be done by var

Rubber dams – air-filled vs water-filled, Most of the existing rubber dams ...

Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i)  By giving same sheet length and dam height, tensi

Baur leonhardt system, What is the special feature of this system rather th...

What is the special feature of this system rather than other?? What do you mean by principal of looping system?

Geotechnical, send any civil engineering related questions . i will write t...

send any civil engineering related questions . i will write the answers , please tell us the process .

Design the 2-span continuous center, Design the 2-span continuous center T-...

Design the 2-span continuous center T-beam, B2, for the floor syetem shown below. The girders that the beam frames into are all 24" wide. Using fc'= 5 ksi, and fy = 60 ksi. The ser

Tests on cement, Tests on Cement: The following tests are conducted o...

Tests on Cement: The following tests are conducted on cement in a project site: Setting Time Initial setting time Final setting time Compressive Streng

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd