Why are two gate regulators necessary in regular practice to form washout regulators?


Answer

In fact, situation is analogous to that of fire hydrants in that two gates valves are installed with a on its own fire hydrant. Washout valves are used for regular maintenance work of watermain like allowing flowing out of water throughout cleaning of watermain. At junction anywhere a tee-branch out to a washout point, a gate valve is installed to divide two pipelines. However, this gate valve is open throughout normal operation as another gate valve further downstream is installed. If downstream gate valve is not installed in position, then pipe section of branched-out watermain will be left dry during normal operation and there is a high probability that break to watermain and frequent leakage would happen. With downstream gate control device installed, segment of branched-out watermain consists water in regular operation. In a case there is any leakage, it be able to be readily detected by using two gate regulators.

 


Related Discussions:- Practice to form washout regulators

What is tendonand describe its working, What is Tendonand describe its work...

What is Tendonand describe its working It is a steel element, such as a wire, cable, bar or strand which is provided, in a stretched form, to impart prestressing force in con

Solubility - Soil compaction, Solubility: Bitumen is soluble in carbo...

Solubility: Bitumen is soluble in carbon disulphide (CS2). The Indian specifications require that the bitumen should have 99 per cent solubility. Lesser value indicates prese

Project planning, can you please provide with an example for mobilisation a...

can you please provide with an example for mobilisation and demobilisation plan, induction and deployment schedule, broad execution schedule in excel,quantity schedule for major qu

Mechanics of solid, determine the end slope and deflection in the beam

determine the end slope and deflection in the beam

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Moment distribution, Moment Distribution: You have learnt about moment...

Moment Distribution: You have learnt about moment distribution procedure after deriving the slope deflection equation for the members. The concepts of distribution factor and

Calculate the deposited amount - construction management, An engineer depos...

An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-mo

What are the conditions essential for darcy law, What are the conditions es...

What are the conditions essential for Darcy's law to be applicable for flow of water by soil ? Why is the permeability of a clay soil with flocculated structure greater than tha

Drawbacks of curing by ponding and polythene sheets, Question What are the ...

Question What are the main drawbacks of curing by ponding and polythene sheets ? Answer Purpose of curing is to decrease the speed of heat loss of freshly placed concrete to atm

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd