Q. Design the Drainage pipes system in reclamation areas?
In reclamation areas drainage pipes are generally laid at flatter gradients when compared with upstream stormwater pipes. The fact that nature of flow in stormwater drain is by gravity makes the downstream pipes in reclamation areas comparatively deep below ground surface. It's predominant to have outfall of drains above the tidal influence level and this accounts for the relative flatter gradient of drain pipes in reclamation area.
Attention has to be paid to possible occurrence of differential settlement in reclamation area. For pavement design, flexible pavement is predominant to rigid pavement to cater for settlement problems. In the same way, in the design of drains flexible joints such as spigotand socket joints and movement joints in box culverts have to be provided to guard against the effect of differential settlement.
applications of distomat in briefly
Hoyers long line system pre-tensioning When concrete attains the required strength, jacks are released and tendon wires in-between various units are cut.
Road Materials Earthwork and pavements constitute a significant part of the cost of a road. Hence it is desirable that thorough investigations be done about the availability o
distribution of shear stress in triangular section
Determine the Head Loss Due To Friction Determine the head loss due to friction using the Darcy-Weisbach equation. The water is pumped at 3.0 gallons per minute, has a temperat
Attached document
cold driven rivet
Q. What do you mean by Geotextile filter? Geosynthetics is a collective term applied to thin, flexible sheets incorporated in or about soil to enhance its engineering performan
Referring to problem 1, in order to meet a 1-hour fire code rating the slab thickness must be at least 4.00. Based on the information given in problem 1 and with a slab thickness o
principle of working from whole to part
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd