Hoyers long line system pre-tensioning, Civil Engineering

Assignment Help:

Hoyers long line system pre-tensioning

When concrete attains the required strength,  jacks  are released and tendon wires in-between various units are cut. 

1243_pre tensioning.png


Related Discussions:- Hoyers long line system pre-tensioning

Strength of materials, #questionwhat is the shear force and bending moment....

#questionwhat is the shear force and bending moment..

Settlement due to deterioration, Q. Settlement due to Deterioration? Th...

Q. Settlement due to Deterioration? The deterioration of foundation concrete will result in the vicinity of sulphates, chlorides and chemically contaminated soils. Due to deter

Surveying, describe two fundamentals purposes of surveying.

describe two fundamentals purposes of surveying.

What is the meaning of untensioned reinforcement, Supplementary or Untensi...

Supplementary or Untensioned Reinforcement It is that reinforcement, provided in prestressed concrete member, which is not provided in a stretched condition like tendons.

Changeable depth bridge decks, Question What is the sucker deck principle f...

Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greater tha

What is multiple-cell box girder, Q. What is Multiple-cell box girder? ...

Q. What is Multiple-cell box girder? Multiple-cell box girder: cells connected by top flanges vs. cells connected both by top and bottom flanges When the depth of a box gi

Survey, Operation in chain surveying

Operation in chain surveying

Theories of failure - cases of solids, Theories of Failure - cases of solid...

Theories of Failure - cases of solids: Let us now consider the solid shown in Figure (b). (a)        As the principal stresses are within 260 MPa, the solid is safe ac

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd