Define the Objectives of Load Flow Analysis

The objectives of load flow analysis are:

(i) To analyse an existing power system, future expansion or a new power system plan.

(ii) To ensure that, for any proposed operating conditions of a power network, no item of plant is overloaded and that all bus voltages are within acceptable limits.


Related Discussions:- Define the objectives of load flow analysis

Evaluate the directions of conventional currents, Q. For a p-channel JFET i...

Q. For a p-channel JFET in its active region, specify the polarities of voltages and the directions of conventional currents.

Calculate I function using logic gates, I need I circuit that calculates f(...

I need I circuit that calculates f(n) = 2^2^n, where n is a 4bit number. I tried with a decoder but unsuccessfully.

Define the binary counting - counters, Define the Binary Counting - Counter...

Define the Binary Counting - Counters? The Binary counter is capable to be constructed from J-K flip-flops by taking the output of one cell to the clock input of the next The J

Microcomputer - introduction to microprocessors , Microcomputer A micr...

Microcomputer A microprocessor is a  general purpose central processing  until of a digital  computer system. It has  arithmetic  logical unit  control circuits and a set of r

Determine the percentage ripple voltage, Problem (a) Figure gives the ...

Problem (a) Figure gives the basic circuit of the diode limiter. Assuming that the diodes are ideal sketch and annotate the waveforms of the input voltage vi(t) and the load

Express the storedmagnetic energy, A relay is essentially an electromechani...

A relay is essentially an electromechanical switch that opens and closes electrical contacts. A simplified relay is represented in Figure. It is required to keep the fenomagnetic p

What are the precautions to be taken, What are the precautions to be taken ...

What are the precautions to be taken before basic work on electrical installations? Ans: Before starting any electrical works on installations disconnect the power supply to

Calculate the sending end voltage, A 150 km long, 3-phase, 400 kV overhead ...

A 150 km long, 3-phase, 400 kV overhead line is used to transmit 1800 MW to a distribution area at 0.9 power factor lagging. The line parameters per phase and per unit length in st

Develop a block diagram of an asynchronous decade counter, Q. Counting to m...

Q. Counting to moduli other than 2 is a frequent requirement, the most common being to count through the binary-coded decimal (BCD) 8421 sequence. All that is required is a four-st

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd