Define safety precaution for underwater inspection of bridge, Civil Engineering

Assignment Help:

Define Safety Precautions for Underwater Inspection of Bridge?

The working agency should have its own diving safety manual, which should be strictly followed. This manual should include:

- Safety procedures and checklist for diving operations

- Assignment and responsibilities of dive team members

- Equipment procedures and checklist

- Emergency procedures in case of equipment failures, adverse environmental conditions, diver illness or injury.

Before taking up diving operation, the supervisor must ensure that:

- All the equipments are in working condition

 - Each diving operation is thoroughly planned - A lifeline is provided for use of diver

- Arrangements are in place to take care of emergencies

- Sufficient number of signalmen and standby divers are present at site


Related Discussions:- Define safety precaution for underwater inspection of bridge

Survey engineering, define the meaning of longitudinal cross sectional leve...

define the meaning of longitudinal cross sectional levelling

Reasons of ground heaving during pipe-jacking, Reasons of ground heaving du...

Reasons of ground heaving during pipe-jacking It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer mus

Roadworks - filler and binder in bituminous pavement, Q. Roadworks - filler...

Q. Roadworks - filler and binder in bituminous pavement? In bituminous materials, course aggregates perform the bulking action of mixture and contributes to stability of result

Theory of elasticity and plasticity, derivation for strain energy stored in...

derivation for strain energy stored in a body due to torsion

Statics, Applications of statics

Applications of statics

FLAMISH BOND, TH ADVANTAGES OF FLAMISH BOND

TH ADVANTAGES OF FLAMISH BOND

Soils, how to classify soils materials

how to classify soils materials

Construction Planning, A contractor has both a 3-cy and a 5-cy shovel in th...

A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd