Define Lead Lag Relationships

1. A lead is when the successor task begins before the predecessor task is complete

2492_Define Lead Lag Relationships 1.png

2. A lag is when a successor task does not start immediately upon the completion of the predecessor task

1342_Define Lead Lag Relationships 2.png


Related Discussions:- Define lead lag relationships - construction management

Timber, defects in timber?

defects in timber?

Parallel pipe systems or multipath pipeline problems, Parallel Pipe Systems...

Parallel Pipe Systems or Multipath Pipeline Problems Two or more sections of piping (branches) of different diameters, lengths and/or pipe materials originating and terminating

Use of admixtures in concrete, Use of Admixtures in Concrete The use of...

Use of Admixtures in Concrete The use of chemical admixtures may be made in prestressed concrete construction. But the admixture should not contain chlorides in any form. This

Define the coefficient of permeability - hydraulic system, Define the Coeff...

Define the Coefficient of Permeability: (K) A measurement of the ability of the soil or an aquifer for the movement of water through it. Also termed "hydraulic conductivity", C

Arrangement of piles in a pile cap to reduce bending moment, Arrangement of...

Arrangement of piles in a pile cap to reduce bending moment induced in piles Let's consider that piles are designed to intersect at a single common point in a pile cap. The re

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Slab, Design of one way slab, two way slab, circular slab, hollow slab step...

Design of one way slab, two way slab, circular slab, hollow slab step by step as ACI code 318-08, tnx

Transportatoin engineening, explain the construction while aligning roads o...

explain the construction while aligning roads on hilly areas

Explain the signalized intersections - transportation, Explain the Signaliz...

Explain the Signalized Intersections Cycle length - the time required for one complete sequence of all signal indications Phase - the right-of-way (green), change (yellow),

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd