Q. Air chamber vs. surge tank in pressurized pipelines?
Air chambers and surge tanks are generally installed in water main to ease the stress on the system when valves or pumps suddenly start up and shut down. A surge tank is a chamber which contains fluid that is in direct contact with atmosphere. For positive surge, tank can store excess water so preventing the water pipes from expansion and water from compression. In case of down surge, surge tank can supply fluid to prevent formation of vapour column separation. Though if the relief of surge pressure is substantial, height of surge tank has to be large and sometimes it's not cost-effective to build such a large tank. Quite the opposite, an air chamber can be adopted in this case since air chamber is an enclosed chamber with pressurized gases inside. Pressure head of the gas inside the air chamber may combat the hydraulic transient. Volume of liquid inside the air chamber must be adequate to avoid the pressure in pipelines falling to vapour pressure. Air volume must be sufficient to produce cushioning effect to positive surge pressures. Basically air chambers can typically be designed to be more compactthan surge tanks. Air chamber has the disadvantages that regular maintenance has to be carried out to check volume of air and proper design of pressure level of gas has to be conducted.
mechanism of different types of concrete mixers
BRIEFLY EXPLAIN THE CLASSIFICATION OF ROCKS
Q. Disadvantages of excessive concrete covers? In reinforced concrete structures cover is generally provided to protect steel reinforcement from corrosion and to provide fire r
The objective of this module is:- - For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibili
If y1 and y2 are alternate depths of a rectangular channel show that Yc³ =2y1²y2²/(y1+y2) Also specific energy E = y1²+y1y2+y2²/(y1+y2)
Hoyers long line system pre-tensioning When concrete attains the required strength, jacks are released and tendon wires in-between various units are cut.
Define the statements about error analysis? I. The expected value (or: most likely; probable value) of a measurement is the value that has the highest value of being correct.
What is Under vibration of fresh concrete?
A group of 16 piles of 50 cm diameter is arranged with a centre to centre spacing of 1.0 m. The piles are 9 m long and are embedded in soft clay with cohesion 30 kN/m 2 . Bearing r
explain the construction while aligning roads on hilly areas
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd