Construct the correct network for project, Civil Engineering

Assignment Help:

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can be started only when all activities A, B, C, and D have been completed. Construct the correct network for this project.

789_Construct the correct network for a project.png


Related Discussions:- Construct the correct network for project

Geometric design of roads, Geometric Design Of Roads: Geometric design...

Geometric Design Of Roads: Geometric design of roads deals with elements such as cross-section, horizontal and vertical alignment, sight distances, lateral and vertical cleara

Which direction of reinforcement must be provided, Question In the desi...

Question In the designing of a simply supported skew bridge , which direction of reinforcement must be provided? Answer In conventional design of steel reinforcement f

Define recommendations for ptfe, Define Recommendations for PTFE? (a) I...

Define Recommendations for PTFE? (a) It can be either of the two forms given below: (i) Dimpled large sheet It may be circular or rectangular divided maximum into four pa

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Environment engineering assignment, Estimate the ground level NO concentrat...

Estimate the ground level NO concentration: a. Directly downwind at a distance of 2 km b. At the point downwind where NO is maximum c. At a point located 2 km downwind and 0.1 km

Factors that affect design facility of screw pumps, Question While sele...

Question While select screw pumps in polder scheme projects , what are factors that affect design facility of screw pumps? Answer Commonly used angles of inclination

Determine the weight of solids mixed in the suspension, In a hydrometer ana...

In a hydrometer analysis, the corrected hydrometer reading in a 1000 ml uniform soil suspension at the start of sedimentation was 28. After a lapse of 30 minutes, the corrected hyd

Cement bag question., composition of cement in cover bag should be written ...

composition of cement in cover bag should be written or not/ If written which country uses ?please specify the name ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd