Factory fabricated sectional pipe insulation shall be applied in staggered joint construction. On multiple layer construction, all joints shall be lapped one half of each section between layers such that all joints are staggered. In the top layer, all joints shall be buttered with joint sealant and fastened in place with bands using two per section or on a maximum of 450 mm centers. The insulation is to be liberally covered with vapour barrier prior to being covered with metal jacketing lapped a minimum of 50 mm on all seams.

Jacketing shall be secured with bands, located at each lap joint and spaced a maximum of 300 mm on center. Vertical jacketing shall be supported with "S" clips.


Related Discussions:- Cold service insulation on pipe

Find out the axial moment of inertia, Find out the axial moment of inertia:...

Find out the axial moment of inertia: Find out the axial moment of inertia of a rectangular area of base b and height d around centroidal axis GX and the base B 1 B 2 . So

Define external broaching - types of broaching, Define External Broaching -...

Define External Broaching - Types of Broaching External broaching is employee for machining a flat surface. The broach is in the form of a small length tool mounted on a slider

Working of boiler, Working of boiler : Water is filled in boiler ...

Working of boiler : Water is filled in boiler shell through the feed valve up to 2/3 rd of shell. Water flows down through the down take header by means of descending wa

What is holiday detection, Q. What is Holiday Detection? Each length of...

Q. What is Holiday Detection? Each length of coated pipe shall be checked for holidays with a high quality, heavy duty, full wave rectified non pulsating direct current detecto

Specific volume of the superheated steam - thermodynamics, Specific volume ...

Specific volume of the superheated steam: It is volume occupied by unit mass of superheated steam corresponding to given pressure of superheated steam generation. Superheated

Question.., Two concentric perforared plates are seperated by a 200mm laund...

Two concentric perforared plates are seperated by a 200mm launder and form the flow exit for a clarifier (figure 1). The inlet water flow of 1200 mcubed/hour into the clarifier is

Explain about active fire protection, Q. Explain about Active Fire Protecti...

Q. Explain about Active Fire Protection? Active Fire Protection - A fire fighting system that is normally dormant and is activated automatically upon detection of a fire hazard

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd