Cleaning and greasing of steel sliding bearings :

Following equipments are required for greasing of steel sliding bearings:

1. Jacks (50 ton capacity) - 2 nos.

2. Hard wooden packing below and above jack

3. Grease graphite Grade 3 conforming to IS:508

4. Kerosene or released black oil for cleaning

5. 6 mm thick steel scrapers

6. Mortar pan

7. Cotton waste

Greasing of sliding bearings can be undertaken under traffic with issue of caution order and line protection for temporary works as per provision of IRPWM.

Lifting of girder should be restricted to 8 to 10 mm only, ensuring that the bearing strip does not get lifted over locking strip and guide strip to avoid creep of girder in logitudinal and lateral direction. For lifting, it is not necessary to break the track. Only loosening of fish bolts and dog spikes over a small length on both sides of the pier is sufficient. Only one end of the girder should be lifted at a time and steel scraper inserted between bearing strip and base plate to remove old grease dust and dirt. The contact surface is cleaned with oil and grease applied. Girder is then lowered back over the base plate. Time required for all these activities is approximately 15 to 20 minutes.


Related Discussions:- Cleaning and greasing of steel sliding bearings

Explain rebound hammer - underwater non-destructive testing, Explain Reboun...

Explain Rebound Hammer - Underwater non-destructive testing? The underwater rebound hammer system is a surface hardness tester which can be employed to acquire a general condit

Define compression - actions in pot bearings, Define Compression - Actions ...

Define Compression - Actions in POT Bearings? Vertical load is carried through the piston of the bearing and it is resisted by the elastomeric pad. Elastomer is incompressible,

How to calculate the vertical stress, A rectangular foundation, 2 m × 4 m, ...

A rectangular foundation, 2 m × 4 m, transmits a uniform pressure of 450 kN/m 2 to the underlying soil. Verify the vertical stress at a depth of 1 metre below the foundation at a

Failure theory, condition for no tension numerical problem

condition for no tension numerical problem

Wall method of estimation, 1. Can you enumerate the benefits of individual ...

1. Can you enumerate the benefits of individual wall method of estimation? 2. Estimate the single room of size 3m x 4m x height 3m  using individual wall method? 3. Which met

Sieve analysis - soil mechanics and foundations, Sieve Analysis - Soil Mech...

Sieve Analysis - Soil Mechanics and Foundations a. Sieve Analysis used to obtain the grain size distribution of coarse-grained soils (sands and gravels) larger than 0.075 mm (r

Bridge engineering, long span bridge or continuous bridge which is more pre...

long span bridge or continuous bridge which is more preferable and why ??? what is the major problem in continuous bridge and what would be its effect if there is any differential

Calculate carbon intensity, how to calculate the carbon intensity (gC/MJ) f...

how to calculate the carbon intensity (gC/MJ) for gasoline ( C7H16 ) , we have the Energy Density = 32.2 MJ/L Fluid Density = 0.727 g/mL

Explain total dynamic head (tdh), Total Dynamic Head: (TDH) y-axis plo...

Total Dynamic Head: (TDH) y-axis plot point related to each x-axis flow rate along the system curve plot. TDH = h a = TSH + h f + v 2 /2g       v 2 / 2g usually small

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd