Cleaning and greasing of steel sliding bearings :
Following equipments are required for greasing of steel sliding bearings:
1. Jacks (50 ton capacity) - 2 nos.
2. Hard wooden packing below and above jack
3. Grease graphite Grade 3 conforming to IS:508
4. Kerosene or released black oil for cleaning
5. 6 mm thick steel scrapers
6. Mortar pan
7. Cotton waste
Greasing of sliding bearings can be undertaken under traffic with issue of caution order and line protection for temporary works as per provision of IRPWM.
Lifting of girder should be restricted to 8 to 10 mm only, ensuring that the bearing strip does not get lifted over locking strip and guide strip to avoid creep of girder in logitudinal and lateral direction. For lifting, it is not necessary to break the track. Only loosening of fish bolts and dog spikes over a small length on both sides of the pier is sufficient. Only one end of the girder should be lifted at a time and steel scraper inserted between bearing strip and base plate to remove old grease dust and dirt. The contact surface is cleaned with oil and grease applied. Girder is then lowered back over the base plate. Time required for all these activities is approximately 15 to 20 minutes.
design
Dimples in Polytetrafluoroethylene (PTFE) PTFE is a fluorocarbon polymer that possesses good chemical resistance and can function in a wide range of temperature. The most signi
Question Why are transitional jacks designed in pipe jacking projects? Answer While development of pipe jacking stops, building up of confrontation is extremely
#questionlist of buiding team members ..
Design sewerage net work
in direct pumping system
Q. What do you mean by Ozone Test? Some research and studies determined that the ozone test was unnecessary as this affects only the surface layer. In un-stretched rubber, ozo
Question What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation? Answer These methods aim at reducing placing tem
Q. Show the application of Concrete crash barriers? Concrete crash barriers aren't considered as the best barrier design due to the following reasons when compared with flexibl
A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!