Calculate annual interest rate which is compounded monthly, Civil Engineering

Assignment Help:

You wish to buy a house and you can afford to make a down payment of $50,000. Your monthly mortgage payment cannot exceed $2,000. If 30-year loans are available at 7.5% annual interest rate which is compounded monthly, the highest price that you may consider is most nearly:

Solution:

n = 360 months interest = 7.5%-annual ÷ 12-months/year = 0.625% per month

Apply the equation:      

i (1+i)n / (1+i)n - 1

This yields (A/P, 0.00625, 360) = 0.00699 

Apply the following equation to find the highest price to consider:

P x 0.00699 = (Highest $  -  $50,000) x 0.00699   ≤   $2,000

Highest $ ≤   ($2,000/0.00699) + $50,000 = $336,123


Related Discussions:- Calculate annual interest rate which is compounded monthly

How should reservoir floors be designed, Question In designing of servi...

Question In designing of service reservoirs, how should reservoir floors be designed to avoid leakage of water because of seasonal and shrinkage movements ? Answer I

How can we reduced frictional losses, How can we reduced frictional losses ...

How can we reduced frictional losses Frictional losses can be reduced by several methods, such as : (a) Over-tensioning the tendons by an amount equal to the maximum frictio

Solid mensuration, Ask question #MiniThe base of an isosceles triangle and ...

Ask question #MiniThe base of an isosceles triangle and the altitude drawn from one of the congruent sides are equal to 18cm and 15cm, respectively. Find the lengths of the sides o

What is the negative skin friction, A square pile group of 16 piles passes ...

A square pile group of 16 piles passes by a filled up soil of 3 m depth. The pile diameter is 25 cm and pile spacing is 75 cm. If the unit cohesion of the material is 18 kN/m 2 an

Highway pavement design, Explain the important factors affecting the design...

Explain the important factors affecting the design of pavement?

Principle of airlifting for cleaning pile bores, Q. Principle of airlifting...

Q. Principle of airlifting for cleaning pile bores? Airlifting is generally carried out before concreting to remove debris and clean the base of pile bores. It basically acts a

Lateral load, http://www.expertsmind.com/questions/tributary-lateral-load-3...

http://www.expertsmind.com/questions/tributary-lateral-load-30133097.aspx

Explain the erosion and sedimentation, Explain the Erosion and Sedimentatio...

Explain the Erosion and Sedimentation Erosion: Removal of soil or other channel material caused by the rapid movement of water over the channel surface. The removed material

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd