You wish to buy a house and you can afford to make a down payment of $50,000. Your monthly mortgage payment cannot exceed $2,000. If 30-year loans are available at 7.5% annual interest rate which is compounded monthly, the highest price that you may consider is most nearly:

Solution:

n = 360 months interest = 7.5%-annual ÷ 12-months/year = 0.625% per month

Apply the equation:      

i (1+i)n / (1+i)n - 1

This yields (A/P, 0.00625, 360) = 0.00699 

Apply the following equation to find the highest price to consider:

P x 0.00699 = (Highest $  -  $50,000) x 0.00699   ≤   $2,000

Highest $ ≤   ($2,000/0.00699) + $50,000 = $336,123


Related Discussions:- Calculate annual interest rate which is compounded monthly

Cement bag question., composition of cement in cover bag should be written ...

composition of cement in cover bag should be written or not/ If written which country uses ?please specify the name ?

Emulsified asphalts or cutback asphalts, Question Have to emulsified a...

Question Have to emulsified asphalts or cutback asphalts be selected as staple coat in bituminous road works? Answer Emulsified asphalt is a postponement of asphalt

What is bore hole, What is Bore Hole In exploration of  area of  limit...

What is Bore Hole In exploration of  area of  limited extent  the borings should preferably be located near the comers of  the area. A minimum of three holes should be made un

Shear and tensile strength, What is the difference between shear and tensil...

What is the difference between shear and tensile strength? Ans) Tensile Strength for a Bolt is explained by applying a Force along it long axis. Shear Strength for a Bolt is exp

Dissimilarities in function b/w rock anchors and rock socket, Question ...

Question What are main dissimilarities in function between rock anchors and rock sockets ? Answer Rock anchors are used first and foremost for resisting uplift forc

Brickwork, write buckling and dislodging of brick slip?

write buckling and dislodging of brick slip?

Explain hot weather patrolling, Q. Explain Hot weather Patrolling ? Hot...

Q. Explain Hot weather Patrolling ? Hot weather Patrolling is done for LWR and CWR tracks when the rail temperature reaches td + 20 0 C and above and td + 14 0 C for Central

Design the drainage pipes system in reclamation areas, Q. Design the Draina...

Q. Design the Drainage pipes system in reclamation areas? In reclamation areas drainage pipes are generally laid at flatter gradients when compared with upstream stormwater pip

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd