Q. Afflux on account of obstruction to flow?
Even if the river constriction on account of approach banks is not excessive and bridge waterway is wider than that causing critical discharge intensity, afflux can still be generated due to obstruction to flow by piers. Separation eddies forming at such obstructions result in loss of head which shows as afflux upstream of the bridge.
h = [(V2 / 17.88) + 0.01524] [(A/a)2-1]
wherein h is afflux in m, V is velocity in m/s in unobstructed stream, A is unobstructed sectional area of the river in m2 and a is obstructed sectional area of the river in m2. Other formulae in wide use are due to Negler and Yarnell.
More recently, the Bureau of Public Roads U.S.A., have adopted procedure for estimation of afflux detailed in Hydraulics of Bridge Waterway.
Determine the uses of Screw connectors Screw connectors are normally used to splice large-diameter high-tensile strength bars. The bars are threaded at the ends and a sheet-me
Q. Disadvantages of excessive concrete covers? In reinforced concrete structures cover is generally provided to protect steel reinforcement from corrosion and to provide fire r
How many types of stone use in wall
Features of literary writing
Good evening sir, solid block''s design mix calculated generally please explain and derive .
Check if the given beam and loading satisfy the AISC LRFD strength criteria. The beam section is a W 16*31 of A36 steel and it is laterally supported at the ends at the load points
State the effect of stretched tendons The effect of stretched tendons inside the concrete components is just like a stretched spring. If a spring is stretched it would like to
What is bench mark
Q. Write short note on SKV process of thermit welding? This term is used for welding by Alumino thermic process with short preheat time. The time required for preheat with pet
1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd