Q. Back fill behind the abutments of bridges?

Dry Rubble - At the bank of all bridge abutments and wing walls, the space next to the masonry is to be filled in by a hand-packed dry rubble backing, to the thickness shown on the plans, or as directed by the Engineer.

Filling- Behind this dry rubble, the space upto the back of the excavation is to be filled with moorum, good granular yellow soil or other sound granular materials. Under no circumstances is black cotton or any clayey or silty soil to be used. This filling will be water and rammed in layer thickness. Each layer should have a slope of 45 o towards ground level, the slope to commence from immediately behind the abutment.


Related Discussions:- Back fill behind the abutments of bridges

Define the void ratio and specific gravity of particles, Derive the formula...

Derive the formula among soil moisture content (w), degree of saturation (S), specific gravity (G), and void ratio (e). Saturated clay has a water content of 40% and bulk specif

Road survay, how many programmes in road survey by level matichine and ts?

how many programmes in road survey by level matichine and ts?

Stone, STONE Stone is a 'naturally available building material' used fr...

STONE Stone is a 'naturally available building material' used from the early age of civilization. It is available in the form of rocks, which is cut to needed size and shape an

Test for determination of shear modulus, Test for determination of Shear Mo...

Test for determination of Shear Modulus Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and un

Time to remove formwork to cater for early thermal movement, Q. Time to rem...

Q. Time to remove formwork to cater for early thermal movement? Let's take a circular column as an illustration to explain effect of internal restraint to thick sections.  W

Define the cost per square foot of contact area, Define the Cost per Square...

Define the Cost per Square Foot of Contact Area The cost of concrete formwork is influenced by three factors: 1. Initial cost or fabrication cost that contains the cost of t

Residents building g+3, How analysis of residents building g+3 structure an...

How analysis of residents building g+3 structure analysisl

Calculate equivalent uniform annual cost for the excavator, Calculate Equiv...

Calculate Equivalent Uniform Annual Cost for the Excavator An earthwork contractor is considering the purchase of a new excavator.  Based on 10% interest, the equivalent unifor

HIGHWAY CONSTRUCTION & MAINTENANCE, what is the difference between feasibil...

what is the difference between feasibility study and traffic counting

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd