Application of hot service insulation, Mechanical Engineering

Assignment Help:

Q. Application of hot service insulation?

Provision for the expansion of hot equipment shall include the installation of expansion springs in circumferential banding securing insulation and jacketing.

Engine exhausts operating above 300ºC, or where specified by OWNER, shall be covered with expanded metal shrouding secured to steel rings to provide an air space between exhaust pipe and jacket. If specified, 50 mm thick calcium silicate insulation shall be installed over the rings prior to cladding.


Related Discussions:- Application of hot service insulation

Calculate the normal time for this operation, a) Describe Industrial Engine...

a) Describe Industrial Engineering. Discuss its scope and use in service and manufacturing industries. b) Deriving the stop watch study in a machine shop, ten observation of a d

Powder metallurgy, why pre sintering needed in powder metallurgy

why pre sintering needed in powder metallurgy

Determine time required to stop the automobile, Determine time required to ...

Determine time required to stop the automobile: A 20KN automobile is moving at speed of 70Kmph when brakes are fully applied causing all the four wheels to skid. Determine ti

Objectives-computerized scheduling and control manufacturing, Objectives ...

Objectives After studying this section, you should be familiarized about: The typical job shop scheduling problem, Characteristics of computer controlled scheduling,

Compute efficiency of dual cycle, (a) Compare 2 two-stroke cycle engines wi...

(a) Compare 2 two-stroke cycle engines with 4 stroke cycle engines. What are the function of flywheel and Cam Shaft? (b) Derive a mathematical expression for efficiency of dual

The welding arc, THE WELDING ARC The heat that is developed at the cath...

THE WELDING ARC The heat that is developed at the cathode and anode of an arc discharge is able to melt most of the metals and alloys. Hence, the arc is used as an intense heat

Order sequences and order release, Order Sequences and Order Release Fo...

Order Sequences and Order Release For this system, sequences of orders for particular parts (batch size 1) are produced in the following way: for each machine, here is, for eac

Engfine, how we made parts of engine

how we made parts of engine

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

E=mc2, why this great equation does not apply(involved) in nuclear reaction...

why this great equation does not apply(involved) in nuclear reaction ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd