Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Inlet channel of the exchanger?
The inlet channel of the exchanger shall be designed to minimize flow turbulence and erosion of the refractory liner and the tube inlet area. The latter shall be protected by ferrules.
Channels shall be completely drainable. The outlet channel shall have a liquid sulfur drain.
Access for tube replacement and refractory maintenance shall be facilitated by removal of the bolted cover of the outlet channel.
Hinged 610 mm (24" NPS) clear manways for inspection and maintenance of refractory liner, tube ferrules, and tube-to-tubesheet joints shall be provided in the inlet and outlet channels. Manways shall have removable refractory plugs.
refrigeratorequipments
ladder slip: A uniform ladder having length of 7m rests against vertical wall with which it makes an angle of 45º, coefficient of friction between ladder and wall is 0.4 and
The grouping of the words turbine and propeller in techno jargon will give you the word "turboprop". A turboprop engine is a turbojet (gas turbine) engine, which powers the propell
length of an close belt drive
Explain the working of Michelson's interferometer. How circular fringes he produced with it. (a) What are antireflection films and interference filters? (b) Find the reflecti
Resultant of force system: Resultant is single force that produces the same effect as produced by the number of forces jointly in the system. In equilibrium magnitude of resul
Water flows into the sink shown in figure 5 at a flow rate of 8 L/min. If the drain is closed, the water will eventually flow through the overflow drain holes rather than over the
how forces are balanced for a 3 cylinder engine ?
Break even analysis: The costs from Shagun Palace, a continental restaurant, are shown below. Fixed costs are Rs. 50,000 per month. Break even analysis is applied as a
Q. Measurement of river water levels? In designing bridges and other engineering structures on rivers, maximum discharge and highest flood level form essential data for design
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd