Work breakdown structures

Assignment Help Accounting Basics
Reference no: EM131041202

Assessment TitleWork breakdownTask Description Assignment Overview
This assessment item requires you to consider:-

• work breakdown structures (WBS),
• WBS dictionaries, and
• work packets
...you must then develop both for a selected case study. The case studies, WBS, WBS dictionary and work packet templates will be supplied for a range of project domains:-
• Engineering and construction domain,
• Telecommunications and IT domain,
• Software development domain,
• Financial and business services domain,
• Welfare domain.

The WBS, WBS dictionary and work packets must meet the minimum requirement outlined in the PMBOK (2013) and conform to the requirements outlined in Directing Successful Projects with PRINCE2 (2009).
You are encouraged to use assignment outputs that you may have developed from previous assignments.

Task

Your task is to consider the overview above and write WBS, WBS dictionary and work packets using the templates that will supplied during the course.
You will be graded upon how well your WBS, WBS dictionary items, and work packets have been completed and reflect the case studies.

Purpose

The primary purpose of this assessment item is to help you to develop skills in the contents and compilation of WBS, WBS dictionary items and work packets.

The secondary purpose of this assignment is to give you the opportunity to consider the role of WBS, WBS dictionary items and work packets within a project life cycle.

The assignment will also give you the opportunity to enhance your analysis and written communication skills; particularly in the areas of structured assignment writing.

Structure

Your submission should be made using the supplied templates. You should complete all of the required parts in as complete manner as you deem appropriate. The instruction sections in the templates that state they should be deleted must be deleted.Weighting20%Assessment Criteria Your assignment will be assessed on the extent and quality to which it meets each of the following criteria.

1 A complete WBS is supplied? (15%)
2 A complete WBS dictionary is supplied? (15%)
3 A complete set of work packets is supplied? (20%)
4 A complete WBS is an accurate reflection of the case study? (10%)
5 A complete WBS dictionary is an accurate reflection of the case study? (10%)
6 A complete set of work packets is an accurate reflection of the case study? (10%)
7 Appropriate and well structured, concise and clear expression of project management requirements in response to the assessment task? (10%)
8 Clarity of expression, grammar and spelling? (10%)Referencing StyleHarvard (author-date)

Reference no: EM131041202

Questions Cloud

Potential losses and profits from the position : What should you do and verify the potential losses and profits from the position.
Calculate the maximum power delivered to the inductor : A coil of wire having negligible resistance and an inductance of 0.248 henry is connected to a 117-volt 50-cycle source.
How have issues of diversity influenced social change : How have issues of diversity influenced social change? In other words, how have problems associated with diversity necessitated or encouraged some sort of change in society?
What bones protect the spinal cord : What bones protect the spinal cord? Small canals that connect osteocytes in their lacunae to the central canal are known as ________. Cube-shaped bones that contain mostly spongy bone are called ________ bones.
Work breakdown structures : Assessment TitleWork breakdownTask Description Assignment Overview. This assessment item requires you to consider:-
What is the ping command used for and how does it work : What is the ping command used for and how does it work and what is the difference between IPSec, SSL, and GRE VPNs?
Earnings per share and return on equity : What is the expected earnings per share (EPS) and return on equity (ROE) at next year's expected level of EBIT if the firm remains 100% equity financed?
Problem regarding the triangle arbitrage : The exchange rates in New York for $1 are C$1.2675 and £0.6882. A dealer is offering the following quote: C$1 will buy £0.8722. What is the profit you can earn on $19,632 using triangle arbitrage?
Which impairs the exchange of materials within the tissues : Excess accumulation of fluid, which impairs the exchange of materials within the tissues, is called ________. The ________ duct drains lymph from the right arm and the right side of the head and thorax.

Reviews

Write a Review

Accounting Basics Questions & Answers

  What as standard pcaob provides guidance about what an

1. what au standard contains information about derivatives and securities that should be included in the management

  On january 6 petro co sells merchandise on account to chose

on january 6 petro co. sells merchandise on account to chose inc for 9200 terms 110 n30. on january 16 chose pays the

  Determine the direct materials price variance assuming that

coffey company maintains a very large direct materials inventory because of critical demands placed upon it for rush

  Range for important measures

Ask a manger in your organization if they would prefer a single point estimate or a range for important measures, and why? Please share what they say.

  Wat trends in the environmental forces social economic

what trends in the environmental forces social economic technological competitive and regulatory work for andor work

  Question 1 tco a platypus building inc won a bid for a new

question 1. tco a platypus building inc. won a bid for a new office building contract. below is info from the project

  February 28 the payroll register contained the following

february 28 the payroll register contained the following totals gross wages 92750 federal income taxes withheld 23721

  Prepare journal entries to record the preceding transactions

Archer Co. allows select customers to make purchases on credit. Its other customers can use either of two credit cards: Commerce Bank or Aztec.

  Pretend you are the cfo of a manufacturing company with ten

pretend you are the cfo of a manufacturing company with ten product lines. the president of your company has asked you

  Demand for labor

Answer the following questions using examples and applications from the readings.  Justify your answers using economic concepts and ideas as they apply. Each response should be between 100-200 words.

  Kostco a sourdough bread manufacturer has approached olde

olde charm bakery makes sandwiches pastries cakes and cookies. currently it makes its own sourdough bread at a total

  Demand for hamburgers

Is it likely that the companies believe that the demand for French fries and sodas is more elastic or less elastic than the demand for hamburgers? Briefly explain.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd