Which plan should the engineer recommend

Assignment Help Accounting Basics
Reference no: EM133045470

Question - Conduct three-estimate sensitivity analysis using the AW analysis to choose a better alternative. An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $18,000 per year. In addition, an extra $16.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 75 days per year? The MARR is 11% per year.

Reference no: EM133045470

Questions Cloud

What are expenses : What are expenses if stockholders' equity at the beginning of the period is $ 920, Revenues is $ 18,646, Stockholders' Equity at end of the period is $ 7,027
Find the ending balance of retained balance : Laker Incorporated's fiscal year-end is December 31, 2021. Find the ending balance of Retained Balance and create a post-closing trial balance
Calculate the post-merger earnings per share : The exchange is to be based on the market value of both companies. Calculate the post-merger earnings per share
Practical assignment of fault tree : Practical assignment of fault tree - prv1 release hydrocarbon to flare. Only the failures in the data considered. Gate approach.
Which plan should the engineer recommend : Which plan should the engineer recommend if the equipment will be needed for 75 days per year? The MARR is 11% per year
How much should noreen inc record interest : How much should NOREEN INC record interest and retirement of its liability to MENDOZA INC on December 31, 2020
Calculate the project NPV : This project would require an initial cash outlay of $5,500,000. Calculate the project's NPV using a discount rate of 5 percent
Determine the net realizable value of accounts receivable : At the end of the current year, Accounts Receivable has a balance of $870,000; Determine the net realizable value of accounts receivable
Calculate the pension expense : Calculate the pension expense that will be reported in net income for 2020 if Saverio applies ASPE. What are the disclosure requirements in this situation

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd