What will you spend your budget on

Assignment Help HR Management
Reference no: EM131523068

HPI501- Week 8-Case Study 2 The SecurOps Challenge

SecurOps (SO) is a fairly new company specializing in high-tech security systems for airports. SO's innovative products include a new hand-held "wand" (model HH1) that is not just a metal detector but also a "sniffer" for the typical chemical signature of common bomb components. The HH1 looks like a regular metal detection wand with the addition of a 3x5 inch LCD screen that conveys multiple data on the scanned person.

The other main product manufactured by SO is the CO1 carry-on luggage scanner. This device is the world's most advanced luggage X-Ray machine. The CO1 scans luggage going through a conveyor belt and by using its onboard visual database, it's able to "recognize" the usual shapes related to banned items and alert the security officer through its 15 inch LCD screen. The CO1 uses a regular PC with a custom version of Microsoft Windows ® XP and must therefore be booted up in case of a failure. If the failure in unrecoverable, the machine has a backup hard disk drive that it can boot from.

If the CO1 does not alert its operator, it does not necessarily mean that the luggage being scanned is safe. It only means that the computer did not recognize any shapes of banned objects. Therefore, operators have to be trained to carefully analyze the images that the CO1 produces on the computer screen. These images not only display the basic shape of objects inside the luggage but also show different colors based on whether an item is organic; is giving off heat or is unusually cold among other attributes.

SO is constantly upgrading the firmware and software for all its devices, adding features and fixing bugs on average, once a month. Some of these upgrades can substantially change the functionality of the equipment, sometimes adding whole new set of menus or drastically changing the behavior of the machine.

Because of the complex nature of these machines, a typical airport installation will include two technical support staff to manage breakdowns, firmware upgrades and any other issues.

SO is also working on a new machine not for available for sale yet. The WB1 is a "Whole Body" scanner that essentially replaces the need for a hand-held "wand" such as the HH1. The passenger in question simply steps into a telephone booth sized enclosure and the machine does a complete scan without any physical contact of any kind. The operator stands outside the device and interprets the data the WB1 displays on its onboard computer screen. The WB1 is currently in "beta" testing at several airports and seems to be working well with few to no crashes or malfunctions.

The Williams Gateway Airport in Chandler, Arizona - as part of its modernization initiative - has decided to install a complete suite of SO products in its main passenger terminal. The airport has two main terminals and will therefore require two sets of security equipment. The airport authorities have also agreed to become a beta test site for the WB1 scanner. If this pilot testing goes well, this could be a great contract for SO.

The operators of this equipment will be Transport Safety Administration (TSA) employees as mandated by law. Most of these folks have completed high school but many do not have a college education. Most of them have never operated machinery as complex as the SO units.

TSA will require that every employee that operates these devices be officially certified by SO as an operator of each device. Any mistake here could be catastrophic, so certified competence is extremely important for SO as well as for the TSA.

There are a total 30 TSA employees that will need to be cross-trained on all of the devices. Not all the TSA employees have been hired yet but the TSA assures you that in one more month, they will all be available to begin their training. In other words, here will be one month to fully prepare and certify all the TSA personnel to operate the machines.

After an exhaustive search for the right person and many interviews, SO has decided to hire you as their new corporate training manager. Your task is urgent. The new Williams Gateway Airport terminals will officially open to the public in two months. On that day, there will be an official ribbon-cutting ceremony hosted by the mayor of Chandler and other dignitaries and the airport authority is expecting fully certified TSA employees ready to start work the following day.

Your budget is fairly large ($200K) and you have a staff of four instructional designers at your disposal, reporting to you.

Ideas to consider:

• What technology will you use to get this project off the ground?

• What will you spend your budget on?

• What strategy will you use to roll out the training in such a short time period?

• What does your project timeline look like?

• How will you check for operator competency?

• How will you set up the certification process?

You will need to present your strategy proposal to a Management Review Committee (MRC) who will have the ultimate approval authority for your project

Reference no: EM131523068

Questions Cloud

What is a program design : What is a program design? What program design tools are available? Discuss in details by studying at least three program design tools
Driving success in challenging times : Review the Project Management Institute's article titled "Driving success in challenging times" and then answer the following questions.
Write a program that plays the rock-paper-scissors game : Write a program that plays the Rock-Paper-Scissors game against the computer. When played between two people, each person picks one of three options.
Active member of a negotiation : This negotiation can relate to a work experience, a family or friend experience, or any other experience where you were an active member of a negotiation.
What will you spend your budget on : What technology will you use to get this project off the ground?What will you spend your budget on?What does your project timeline look like?
Implement an application that simulates an odd slot machine : Design and implement an application that simulates an odd slot machine in which five numbers between 1 and 100 are randomly selected and printed side by side.
Describe the usability properties of interactive systems : Evaluate how section 508 affects developing user interfaces and assess this compliancy standard's impact on users
State and federal government regulations : Stated differently, give us an example of a subject area where there are federal laws or regulations as well as state laws and regulations.
Design and implement a program to process golf scores : Design and implement a program to process golf scores. The scores of four golfers are stored in a text file. Each line represents one hole, and the file.

Reviews

Write a Review

HR Management Questions & Answers

  Familiar with the enron case

Familiar with the Enron case. In the Module 4 SLP, we will evaluate the Enron debacle in the context of Corporate Social Responsibility. Specifically, socially responsible organizations behave in certain, ethical ways. Socially responsible organizati..

  Treatment outcomes for all three models of care discussed

Based on your assessments of best treatment outcomes for all three models of care discussed thus far, advocate for the model that you have found to have the best results for a disease/condition. Succinctly report the treatment standard and outcom..

  Important part of the learning process

Describe Victor Vroom's expectancy theory, and why it is an important part of the learning process. How does it tie to self-efficacy and motivation?

  Important information about labor and employment laws

Important information about labor and employment laws - What challenges do you see with interpreting labor and employment laws and court decisions?

  As the human resources manager younbspwant to make sure

as the human resources manager younbspwant to ensurenbspthat your companys hiring practices follow all applicable laws

  Explain the four perspectives of the balanced scorecard

List and explain the four perspectives of the Balanced Scorecard and What steps would you encourage him or her to take in order to successfully implement and use the Scorecard?

  Determining a model for career development

Your Task: The Human Resource Manager for your branch has noticed that the current branch Standard Operating Procedure (SOP) is outdated. You have been assigned the task of determining a model for both career development and career counseling at ..

  Which leadership practice or practices would be appropriate

What is your initial impression of which leadership practice or practices would be appropriate and why? How well does the company you have chosen exemplify application of the five discovery skills of innovation leaders

  Discuss the impact that at least two of the factors

Draft the design of a new model program, not currently existent within your community. Provide a two- to- three paragraph statement that introduces your proposed community program. This section is tentative and might change as you conduct more res..

  Think of your currentformer workplace measure an ethical

think of your currentformer workplace. evaluate an ethical dilemmas that is or has challenged your workplace in the

  Analyzes how industry trends determine change

Explains/develop a short-term plan to achieve long-term objectives. (what is needed that will help meyear/monthly weekly etc. to accomplish a 5 year short -term objective?

  Explain the importance of maintaining accurate records

Explain the importance of maintaining accurate and objective employee records, indicating the consequences that may result from lack of record keeping. Provide support for your rationale.Provide an example of formal and an example of informal doc..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd