What will be the steady-state effluent concentration

Assignment Help Civil Engineering
Reference no: EM13561632

A water treatment plant treats a continuous flow rate of 50,000 m^3/day and plans to build a 10,000 m^3 tank to house an additional treatment process. The reaction occurring in the tank will remove nitrate according to first order decay with a rate of 0.25 per hour (12 hrs/day). The influent concentration of nitrate is 50 g/m^3.

a) What will be the residence time of the tank?

b) What will be the steady-state effluent concentration of an ideal CSTR?

c) What will be the steady-state effluent concentration of two equally-sized (5,000 m^3 each), ideal CSTR's in series?

d) What will be the steady-state effluent concentration for an ideal PFR? Assume dimensions of length = 500m, cross sectional area of flow = 20 m^3

Reference no: EM13561632

Questions Cloud

What is the maximum exiting velocity and what is the maximum : A fireman reduces the exit area on a nozzle so that the velocity inside the hose is quite small relative to the exiting velocity. What is the maximum exiting velocity and what is the maximum height the water can reach if the pressure inside the hose ..
Determine the moment of all cable forces about point a : Structure O A B C is built in at point O and supports forces from two cables. Cable E A D passes through a frictionless ring at point A, and cable O C G passes through a frictionless ring at point C. If the force in cable E A D is 800 lb and the forc..
Determine head loss through this pipe section : A pipe carrying oil of specific gravity (SG = 0.877) changes in size from 150 mm at section E to 450 mm at section R (E and R are arbitrary designations of the two points in the system).  Section E is 3.66 m lower than R
Take the casing wall to have an outer diameter : Batteries in a flashlight must be held in electrical contact even though the outer plastic housing expands differently than the battery and terminals. This is accomplished by having a compliant spring compressed as the cover is screwed on the flashli..
What will be the steady-state effluent concentration : A water treatment plant treats a continuous flow rate of 50,000 m^3/day and plans to build a 10,000 m^3 tank to house an additional treatment process. The reaction occurring in the tank will remove nitrate according to first order decay with a rate o..
Determine that a building solution complies with performance : In accordance with BCA, what are the assessment methods and how may they be used to determine that a building solution complies with the performance requirements?
How many square feet of compacted cy are placed per hour : Earth whose in situ weight is 110 lb per cf and compacted weight is 124 lb per cf is placed ina a fill at rate of 280 cy per hr, measured as compacted earth. The thickness of the compacted layers is 8 in
Compute the coefficient of permeability of the soil in : Standard air is drawn from the atmosphere into a 1.25 m diameter cylindrical duct by a fan mounted inside the duct. This air is discharged down stream from the fan through a 0.6 m diameter duct at a velocity of 25 m/s and atmosphere pressure.
What is the force if the fire fighter is running towards : The water exiting a 2.5 cm diameter nozzle which is atrtached to a 7.6 cm diameter fire hose is discharged at a velocity of 25 m/s. the pressure in the hose is 380 kpa. what is the magnitude and direction of the force of the water n the nozzle, if th..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Design system to pump water 80 degrees c from water heater

Design a system to pump water 80 degrees C from a water heater to a washing system. Desired minimum flow rate is 750 Liter per min.

  What is the estimated uncertainty in the length of vector

The base line vector between the base and roving reciever is 8340m and has an accuracy of +/-(1to 2 cm +/-2ppm). What is the estimated uncertainty in the length of this vector

  Determine what is the length of the smooth pipe

Straight pipe, pump head=100 ft, pipe diameter=4inches, velocity is 10 ft/sec, no elevation changes. Water at 20C. What is the length of the smooth pipe

  Calculate primary consolidation settlement for the ch layer

Calculate the primary consolidation settlement for the CH layer, assuming that it is normally consolidated with a water content of 70% and a compression index of 0.25.

  Determine the minumum coeffeicient of friction

A water jet of diameter 2 inches and speed of v=60 ft/s is filling a tank at a 70 degree angle. The tank has a mass of 25 lbm and contains 6 gallons of water. The water temperature is 70 degrees F.

  Determine from first principles

At a section in a beam the tensile stress due to bending is 70 N/mm2 and there is a shear stress of 25 N/mm2. Determine from first principles, the magnitude and direction of the principal stresses

  Difference between stiffness and flexibility matrix

What is the difference between stiffness and flexibility matrix

  Calculate the pressure at the clay-sand interface for two

Calculate the pressure at the clay-sand interface for two cases:1) clay on top of the sand and 2) clay on the bottom of thevertical sand column.

  Inability and green engineering can be integrated

inability and green engineering can be integrated in the four components of materials science and engineering?

  Compute the 50 year flood discharge on a large creek

Compute the 50 year flood discharge on a large creek in Northern Ohio if the total discharge area is 75 mi^2. The average soil infiltration is 0.5 in./hr; the main channel slope is 0.008.

  Calculate what is the premanent change in length

A 32mm rebar with a guage length of 200mm was subjected to tension to fracture according to ASTM E-8 method. if the rebar is loaded to 390kn only ad then unloaded, what is the premantnt change in length.

  Vehicle delay due to queuing

Vehicles begin to arrive at a toll booth at 850 am with an arrival rate of x(t) = 4.1 + .01t (with t in min and x(t) in veh /min.) The toll booth opens at 9am and processes vehicles at a rate of 12 per minute throughout the day. Assuming D/D/1 que..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd