What should be the surface area of each tank

Assignment Help Civil Engineering
Reference no: EM13543444

If a 1.0 m3/s flow water treatment plant uses 10 sedimentation basins with an overflow rate of 15 m3/day.m2 ,

a-what should be the surface area (m2) of each tank?

b-Do the problem again but for an alum or iron floc with an overflow rate 20 m3/day.m2?

Reference no: EM13543444

Questions Cloud

What is the effective theoretical detention time : Determine the surface area of a primary settling tank sized to be handle a maximum hourly flow of 0.570 m3/s at an overflow rate of 60 m/day.If the effective tank depth is 3.0 m,what is the effective theoretical detention time?
Calculate the position of the loop as the end of the whip : Assuming the mass of the whip is uniformly distributed along its length, calculate the velocity of the end of the whip as a function of the position of the loop (x), and calculate the position of the loop as the end of the whip breaks the speed of so..
Determine flow rate in a series pipe system given that rough : A sample of moist soil has a volume of 40.5 cc mass weight of 59.2 gms. After drying it has a mass weight of 48.3 grams. The specific gravity of the solids are 2.68. Compute the degree of saturation, water content and void ratio.
Revolve the pavement about its inside edge : Calculate the super-elevation required for a horizontal curve on a two-lane, two- way highway with 60 mph design speed, and a 1200 ft. radius curve. What is the required length of the spiral curve?
What should be the surface area of each tank : Do the problem again but for an alum or iron floc with an overflow rate 20 m3/day.m2?
Determine the total work produced during this adiabatic : An adiabatic piston-cylinder device equipped with a spring maintains the pressure inside at at 300kPa when the volume is 0, and 3000kPa when the volume is 5 m3. The device is connected to a steam line maintained at 1500kPa and 200 C
Determine the initial discharge velocity from the tank : Where z is the water height above the center of the valve. Determine (a) the initial discharge velocity from the tank and (b) the time required to empty the tank. The tank is considered to be empty when the water level drops to the center of the valv..
Find the center of gravity of the given composite body : The tube supports the four parallel forces. Determine the magnitude of the forces and acting at C and D so that the equivalent resultant force of the four forces acts at point O.
Will such a procedure produce a greater flowrate : A 12in diameter water main in your city has become very rough due to rust and corrosion, it has been suggested that the flowrate through the this pipe can be increased by inserting a smooth plastic liner into the pipe.

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  How to estimate the value of the fuel that is captured

Assume that the service station must fill refill the tank with 4.00 m^3 of gasoline once a week.Draw a mass balance diagram and estimate the annual loss of gasoline vapor (in kg/y) for the splash fill method

  Determine an appropriate plywood thickness and span rating

For a total floor load of 75 psf on 2x floor framing at 24 o.c., determine an appropriate plywood thickness and span rating assuming panels with edge support and panels oriented perpendicular to the framing. Specify the minimum fasterners and spac..

  Find the force that is needed to produce

An aluminum 2024 T3 bar of uniform cross sectional area is subjected to a tensile force in the longitudinal direction. if the lateral surface of the bar is confined and not allow to contract during loading

  Determine the length of the middle ordinate

a simple horizontal curve has a central angle of 35 degrees-40 minutes-40 seconds, and a degree of cure (arc definiton) of 5 degrees -00 minutes-00 seconds.

  Explain will the vertical curve meet minimum ssd standards

A particular crest vertical curve has long been criticized as being unsafe. Its length is 400 ft. The prevailing speed on the crest vertical curve is 50 mph. In its present condition, its tangent grades are +2% and -3%.

  What should be the cross-sectional area of the circular rod

An engineer has to design a rod made with the same steel to carry a load of 150 kips without yielding. He desires to have a factor of safety against yielding of 1.5. What should be the cross-sectional area of the circular rod

  Find the mean value of the time rate of change of the

Gas is flowing in a long 9-in-diameter pipe from A to B. At sectionA the flow is 0.65 lb/sec while at the same instant at section Bthe flow is 0.72 lb/sec. The distance between A and B is 750 ft.

  Determine the change in length of the steel bar

A steel bar of length 30 inches and circular cross section whose diameter varies linearly from 0.50 inches at one end to 0.75 inches at the other is subjected to an axial tensile force of 4.5 kip. Find the change in length of the bar.

  The quality of the working fluid as it exists the 2 turbine

A 60 MW Rankine steam power cycle in Iceland uses reheat. The system is comprised of a single adiabatic pump, a boiler using geothermal energy, two adiabatic turbine stages and a condenser. Water as the working fluid, which enters the 1st turbine sta..

  Why is the substrate that is reduced first preferred

In what sequence are these oxidized compunds reduced by the bacteria, and why is the substrate that is reduced first preferred by the hydrogen acceptor. When do obnoxious odors appear

  How much natural gas is needed to incinerate the gas stream

The preheaded waste gas stream of 4,000 ACFM is entering a thermal oxidizer. The waste gas stream temperature is 1000 F. How much natural gas is needed to incinerate this gas stream at a temperature of 1500F

  What resistor is needed to create the necessary coil voltage

The available relay for switching a secondary circuit requires 4 volts and has a coil resistance of 145 ohms. If a voltage divider circuit is used to reduce the voltage to activate the relay, what resistor is needed to create the necessary coil vo..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd