What minimum tracer concentration must be achieved in stream

Assignment Help Civil Engineering
Reference no: EM13559338

River A has a flow rate of 3.0 m^3/sec. Stream B discharges into the river at a flow rate of 0.05 m^3/sec. to study mixing of the stream and river, a conservative tracer is to be added to stream B. the instruments that measure the tracer can detect a concentration of 1.0 mg/L. what minimum tracer concentration (mg/L) must be achieved in Stream B so that 1.0 mg/L of the tracer can be measured after the river and stream mix? what mass rate of tracer (kg/day) must be added to Stream B to achieve this concentration

Reference no: EM13559338

Questions Cloud

How do you classify a structure as determinant : If the design speed of a multilane highway is 60 mph, what is the minimum sight distance that should be provided on the road if (a) the road is horizontal and (b) the road has a maximum grade of 5%? Assume the perception/reaction time is 2.5 seconds...
An uncovered swimming pool loses 1 inch of water off : An uncovered swimming pool loses 1 inch of water off its 1,000ft^2 surface each week due to evaporation. the heat of vaporization for water at the pool temperature is 1,050 Btu/lb
Calculate the required hourly feed rate of oil in gallons/h : A 50,000 L/day stream of wastewater must be heated from 15 degrees celsius to 40 degrees celsius for a treatment process to work properly. at what rate must we put heat into the stream? assume that wastewater has thermal properties exactly like pure ..
How far must the plug be compressed downward in order to do : The plug has a diameter of 30 mm and fits within a rigid sleeve having an inner diameter of 32 mm. Both the plug and the sleeve are 50 mm long. Determine the axial pressure p that must be applied to the top of the plug to cause
What minimum tracer concentration must be achieved in stream : River A has a flow rate of 3.0 m^3/sec. Stream B discharges into the river at a flow rate of 0.05 m^3/sec. to study mixing of the stream and river, a conservative tracer is to be added to stream B
What is the volume discharged per unit time : A small circular hole 6.00 mm in diameter is cut in the sideof a large water tank, 14.0 m below the water level in the tank.The top of the tank is open to the air. What is the volume discharged per unit time
Determine the velocity of the airplane : Instruments in airplane A indicate that with respect to the air the plane is headed 30 degrees north of east with an air speed of 480 km/hr. At the same time, radar on ship B indicates that the relative velocity of the plane with respect to the ship ..
What is the speed of the rivers current : A boat whose speed in still water is 1.70m/s, must cross a260-m-wide river and arrive at a point 110 m upstream from where itstarts. What is the speed of the rivers current
Determine the weight of water per truckload of sandy soil : An embankment for a highway 30 m wide and 1.5 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w

Reviews

Write a Review

Civil Engineering Questions & Answers

  Conductive heat loss through the furnace wall

Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.

  Estimate the time in minutes required to drain the tank

You are the Chief Civil Engineer for the Enhanced Protein Production Plant on the planet Zog where the gravitational constant is 15 ft/s2. A protein storage tank has developed a structural problem and must be drained.

  Calculate net present value

Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.

  Is the flow laminar or turbulent

A rectangular concrete channel is 3 m wide and 2 m high. The water 20 deg Celsius in the main channel is 1.5 m deep and is flowing at a rate of 30 m^3/s. determine the flow area, wetted perimeter, and hydraulic radius. Is the flow laminar or turbu..

  Find the increase in effective vertical stress at a depth of

The water table is lowered from a depth of 10' to a depth of 20' in a deposit of silt. All the silt is saturated, even after the water table is lowered. The silt's water content is 26%. Find the increase in effective vertical stress at a depth of 34'..

  Find the average velocity and mass flowrate out of the elbow

If the weight flowrate into the elbow is 47 lbf/s, find the mass flowrate out of the elbow, the volume flowrate in and out of the elbow, and the average velocity in and out of the elbow.

  Freeway capacity and los

A four-lane freeway (two lanes in each direction) is on mountainous terrain with 11ft lanes, a 5ft right-side shoulder, interchange spacing of one every 10 miles, and a 60mph base free-flow speed.

  What horsepower must be supplied to the pump in order

A pump of 80% efficiency lifts water from one large open tank to another; the difference in water surface elevations is 20 feet. The pipe is relatively smooth (f = 0.0122), and has 3 elbows, each with a loss coefficient of 2/3.

  Determine what is the decrease in diameter d

A bar of monel metal (length L=9 in., diameter d=0.225 in.) is loaded axially by a tensile force P. If the bar elongates by 0.0195 in., what is the decrease in diameter d What is the magnitude of the load P

  What is expected behavior in charpy impact energy testing

Two identical alloy specimens are being evaluated for use in a new fuel rod design. One sample was exposed to a fast neutron flux of 9 X 10^23 neutrons/(cm2*sec) at a temperature of 323°K for six weeks in a test reactor.

  Determine moments of inertia ix and iy of the parabolic area

Determine the moments of inertia Ix, and Iy of the parabolic area with respect to the x and y axes. shaded area is in the first quadrent with length a and height b.

  Figure out that the service time could be assumed

The chief engineer of an airport is planning to rehabilitate runway pavements over the next several months. You ask him what impact this would have on delays and queues, but he does not know

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd