What is the structure of engineering asset management

Assignment Help Other Engineering
Reference no: EM131319421 , Length: word count:5000

Life Cycle and Risk Management Assignment 3: A workplace-based report

This assessment task involves collaborative team arrangement efforts and designed to explore engineering asset management as a system incorporating life cycle management. You will have the opportunity to look at theses frameworks in the notes and the standards and compare your own views with your team mates in the group discussion space in preparing for this assignment. This discussion along with your various industrial experiences will give you a good basis to visualize the abstract asset management system within its industrial context.

This assignment is a continuation to assignment 1 and 2 that involves identifying engineering asset management as a system and understanding its structure in terms of activities and relationships. As a team you need to select an asset preferably the same assets selected in assignment 2 and identify the asset management system associated with it within its context: "the organisation's system". This is to be done through demonstrating applicability of a standard, framework or a model and utilizing or tailoring it to the need within the asset management system for improving the management of a particular asset or set of assets in any organization or industry. It also explores the role of this engineering asset management system in the organisation management system and organisational strategy.

Key questions

Over the course of the assignment you should be developing an increasingly sophisticated response to related key questions that an asset manager/ engineer should be able to answer.

1. What is the structure of engineering asset management and how does exist within an organization?

2. What are the interfaces or interrelationships between the engineering asset management system and other activities of an organisation?

3. What is the role of engineering asset management in the organization's management and strategy and how to improve its role for better contribution to the organisation?

Purpose:

  • Explore asset management as a system incorporating life cycle management.
  • To demonstrate applicability of a standard, framework or a model and utilizing or tailoring it to the need within the asset management system for improving the management of a particular asset or set of assets in any organization or industry.

Associated subject learning outcomes - Following the completion of the work set out in this guide you should be able to:

1. Articulate the context and contribution of asset management as a discipline.

2. Understand the interfaces between the discipline and other activities of an organisation.

3. Select and apply appropriate models and standards to specific asset management situations.

Assignment 3 Sequential Task Breakdown

(i) As a team use one of the studied frameworks or standards to identify the asset management system associated with the same selected asset or set of assets in assignment 2. This includes the asset management system activities and the control elements.

(ii) In utilizing the framework or standard in (i) establish the boundaries (crossed by relationships) of the asset management system and identify the major functions (asset-related activities: life cycle or support activities) within the organisation with which the asset management system interacts: e.g. the finance system and the human resources system. Define the nature of those interactions. You may do this by using a table, setting out each function and the details of the relationship. The table may be supported by a diagram to illustrate the relationships, if desired.

(iii) Evaluate one of the functions that you identified in response to part (ii) and recommend improvements to one aspect of this function that may be triggered by a new role or a change of the current asset management control or interaction.

Maximum 5000 words report composing the 3-parts.

Topics

In addition to the topic covered by assignment 1, following the completion of the work set out in this guide you should have a working knowledge of the following topics:

5. System thinking, system theory and the management system

  • Engineering asset management; the relevance of system theory to engineering asset management; system framework; system management and engineering asset management in context

6. Frameworks for asset management

  • Framework for engineering asset management; strategic management and engineering asset management in context; application/adaptation of basic tools; interfaces with other functions (departments and organisations)

7. Key asset related activities

  • The role of asset management activities for technical system development. Use of frameworks for engineering asset management in context

8. Standards as a framework for asset management

  • Available standard for asset management. Use, application/adaptation of standards as frameworks for engineering asset management in context

9. Developing an Asset Management Strategy

  • The role of asset management within the organization's strategy process: Strategy development and implementation, strategic management and engineering asset management in context, application/adaptation of basic tools; available models, frameworks and standards, relevant uses of business models and strategy drivers.

Attachment:- Assignment.rar

Reference no: EM131319421

Questions Cloud

Collect four newspaper clippings on global climate change : Paying attention to environmental issues in the news can make you a more informed citizen. To encourage your environmental awareness, this assignment requires you to collect FOUR newspaper clippings on global climate change.
Review the given case study : Review the Case Study: Start-Up of Blissful Gardens, located on page 510 of your text. Next, suggest two (2) marketing goals for the facility that Ms. Remedios could implement.
Calculate coefficient of determination : If the slope of a straight line is 2.3 and correlation coefficient is 0.777, calculate coefficient of determination.
How encoder operates is not part of definition of the code : Use the latter definition: a code is a set of code words; how the encoder operates is not part of the definition of the code.]
What is the structure of engineering asset management : ENGG958 Life Cycle and Risk Management Assignment 3: A workplace-based report. This assessment task involves collaborative team arrangement efforts and designed to explore engineering asset management as a system incorporating life cycle management..
Discuss about the performance management systems : During your professional career, you may have received performance appraisals. In other cases, your compensation may have been tied to some performance variable. There are many aspects of performance management, compensation, benefits, and payroll..
Tests on the ground and randomly assign : Validity: True story: I once spoke to a retired professor who used to teach general studies geography. His grading technique was to throw the papers/tests on the ground and randomly assign the same grade to each pile (without even reading the pape..
How much atmosphere weigh over each square meter of surface : How much does the atmosphere weigh over each square meter of surface? Express this in tonnes (units of 1000 kg). Recall the conversion factors: 104 cm2 = 1m2, 1 tonne = 1000 kg = 106 g.
Criteria for type of reliability : What data would we have to collect to be sure that the judges ratings meet the criteria for each type of reliability?  Be sure to clarify how each type of reliability is different from the other types.

Reviews

len1319421

12/20/2016 2:32:38 AM

US Student, I want Assignment 3 which is of 5000 words, and it is based on Assignment 1 and 2, Please most important is to reference everything. Assignment 2 will be share it with start working email. Assignment 1 is not with me right now + it was only an introduction. Allows understanding of the nature of the asset management system and its role within the organisation. Process referenced to available methodologies which have been critiqued against their required use for the case analysed. Detailed connection made to overall performance requirements. Support for recommendations flow from analysis undertaken with consideration of implementation issues.

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd