Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
What is the length of the partial wavelength for electromagnetic energy with a frequency of 15 MHz and a phase shift of 263 degrees (in meters)?
Water with a static pressure of 1.96kN/M2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M2. How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/sec)
Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
Assuming uniformly decelerated motion, determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.
A tank is filled with oil (specific gravity 0.8) and water to a depth of 10 meter and 6 meter respectively. Find the resultant force from all fluids acting on the gate of 1.8 meter by 9 meter.
Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.
The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).
Determine the factors of safety against sliding and against overturning, and also the soil pressure at the heel and toe. Assume hydrostatic uplift varies uniformly from full hydrostatic head at the heel of the dam to zero at the toe. consider 1m l..
Plot variation with depth from the top to Point C for σ' v and σ h when the soil is at rest and Estimate the undrained shear strength (c u ) of clay. (Assume the shear strengths to be 200 kPa and 2 kPa at Liquidity Index (IL) values of 0 and 1, res..
If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .
An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.
A three-span continuous beam ABCD with three equal spans supports a uniform load with intensity q. Determine all reactions of this beam and draw the shear force and bending moment diagrams labelling all critical ordinates.
Energy transfer in mechanical systems, A wheel is 800mm in diamiter and has a mass of 1000kg. on a horizontal surface without skidding, the vehicle accelerates uniformly at 0.5m/s^2 for 5 seconds.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd