What is the corrected measurement

Assignment Help Civil Engineering
Reference no: EM13207707

A measurement was recorded as 171.278 m with a 30-m tape that was only 29.996 m under standard conditions. What is the corrected measurement?

Reference no: EM13207707

Questions Cloud

Article about tropical deforestation : In the article about tropical deforestation, road-building into the Amazon is an example of which kind of driving force?
What is the corresponding horizontal distance : A runs slope a distance of 156.777 m from one point to another point at a rate of +1.5%. What is the corresponding horizontal distance between the points?
What is the cost of producing q output in the short-run : What is the marginal cost of producing a 301s unit A 401st unit If you are comfortable doing so, you may answer this question by writing down the marginal cost function directly, rather than recalculating total cost for q = 301 and q = 401.
Determine the net rate of flow of linear momentum : Determine the net rate of flow of linear momentum through the control surface.
What is the corrected measurement : A measurement was recorded as 171.278 m with a 30-m tape that was only 29.996 m under standard conditions. What is the corrected measurement?
What fraction of the herbicide is adsorbed : The herbicide 2,4,D, is applied to a golf course at a rate of 1.2 kg/ha. The organic matter content of the soil is 1%, bulk density is 1.3 g/cm3, and water content is 0.3.
Compute the specific rotation of the compound : An aqueous solution containing 9.47 g of an optically pure compound was diluted to 200.0 mL with water and placed in a polarimeter tube 20.0 cm long.
Find the rate of change in volume : A water tank has a height of 120m, and its area of cross-section is 2000m. Water is released from the tank and the water level drops by 1 meter every minute. Find the rate of change in volume.
Which of the two people is less likely to take on risk : A driver faces a 5% probability that his car will be in an accident and will be worth nothing. Consider three drivers with cars that have value $30,000. Abdulla's utility function over the value of his car W is u(W) = ln(1 + W).

Reviews

Write a Review

Civil Engineering Questions & Answers

  Environmental impact regarding the construction of the dam

Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..

  Draw the influence line for the support reaction

Draw the influence line for the support reaction at A and calculate the support reaction at point

  Determine the theoretical discharge

A vertical triangular orifice in the wall of a reservoir has a base 0.9m long,0.6m below its vertex and 1.2 m below the water surface. Determine the theoretical discharge?

  Superelevation rate for a roadway

What superelevation rate would you recommend for a roadway with a design speed of 100 km/hr and a radius of curvature of 500 m? Assume f = 0.11.

  What fraction of the herbicide is adsorbed

The herbicide 2,4,D, is applied to a golf course at a rate of 1.2 kg/ha. The organic matter content of the soil is 1%, bulk density is 1.3 g/cm3, and water content is 0.3.

  Horizontal motion of plunger and shaft

The horizontal motion of plunger and shaft is arrested by resistance of the attached disk which moves through the oil bath. If the velocity of plunger is v.

  Mannering traffic and highway engineering

An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.

  Sulphate ions in natural and industrial environments

List some of the common sources of sulphate ions in natural and industrial environments. For a given sulfate concentration, explain which of the following solutions would be the most deleterious and which would be the least deleterious to a permea..

  Alternative water resource projects

Consider two alternative water resource projects, A and B. Project A will cost $2,533,000 and will return $1,000,000 at the end of 5 years and $4,000,000 at the end of 10 years.

  Supervisors technicians and skiled workers in dangerous work

As a project manager on site where work for 3 km long tunnel has been undertaken the site is remote and takes about 2 days to travel to nearest town supervisors technicians and skiled workers in dangerous work.

  Regenerative thermal oxidizers

A company that manufactures regenerative thermal oxidizers made an investment 10 years ago that is now worth $1,300,000.

  Determine the settlements having stress

The soil properties of the clay are Cc = 0.25, Cr = 0.05, gsat = 18 kN/m 3 , for the sand gsat = 18 kN/m 3 , and the water table is 2 m below the soil surface. Determine the settlements when a stress of 100 kPa is applied by the building over an a..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd