Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1.Successive plus and minus sights taken on a downhill line oflevels are listed below. The values represent the horizontaldistances bewtween the instruments and either the plus or minussights. What error results from curvature and refraction?
50, 75, 75, 150, 25, 150, 30, 200
2.A small plot of land has measured dimesnions of 50 by 150 ft. the incertianity in the 50-ft is +/- 0.01 ft. Calculate the uncertianity eith which the 150-ft must be measred to ensure that the total uncertainty is not greater than 150%.
3.A resistance arrangement of 50 ? is desired. Tworesistances of 100 +/- 0.10? and two resistances of 25.0 +/- 0.02 ?are available. Which should be used, a series arrangement with the25-? resistors or a parallel arrangement with the 100-? resistors?Calculate the uncertainty for each arrangement
At a depth of 4 miles in the ocean the ppressure is 9520 psia. Assume that the specific weight at the surface is 64.0 lb/ft^3 and that the average volume modulus is 320000psi for the pressure range.
Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of 2.2$ million per year
a 25-ft long crane supported at its lower end by a pin is elevated by a horizontal cable as shown in the figure. a
A company near City X want's to know how much benzene they can release into River Y. City Z is 85.5 miles downstream from City X. City Z doesn't want to have Benzene levels higher than 0.0000015 g/L.
A 2.50-g sample of a large biomolecule was dissolved in 13.0 g of carbon tetrachloride. The boiling point of this solution was determined to be 77.85°C. Calculate the molar mass of the biomolecule.
Concrete pier is loaded on top with a uniformly distributed load of600 lbs per square foot. Investigate the state of stressat a level of 4 ft. above the base.
Determine the moment of inertia and the radius of gyration of the shaded area with respect to the x axis.
A project involves transporting iron pipe to a jobsite that is 43 miles from the supplier. The pipe will be hauled in trucks that can carry 16 pipes per load. Each pipe is 20 ft in length. The average haul speed of a truck will be 50 mi./hr and re..
A simple supported beam 6m long is composed of two C200x28 channel RIVETED FRONT TO FRONT . What uniformly distributed load can be carried in addition to the weight of the beam w/o exceeding a flexural stress of 125MN/m^2
The shaft diameter is 100 mm. Calculate the largest principal stresses and maximum shear stress that will occur in the shaft.
A 40 kg sheave a OF RADIUS R=350 mm. and cenral radiusof gyration k=250 mm carries a 160 kg load b and is suspended by a cable and a spring of modulus k=1.2 kN/m.
A 100ft steel tape measure correctly when supported throughout its length under a tension of 1- lb and at a temperature of 72F.It is used on the field at a tension of 18 lb and supported at the two ends only.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd