its desired to produce 5 cubic yards of cencrete with a ratio of 1:1.8:3.5 of cement, snd, and gravel what are the required amounts of components if 5.5 gallons of water per sack of cement is to be used? assume the free miosture contents of the sand and gravel are 3% and 0.75% respectivley. The specific gravities of cement, sand, and gravel are 3.15,2.65,and 2.65 respectivley give the answer for cement in sacks, the sand, and gravel on pounds and the water in gallons.

Reference no: EM13312166

Questions Cloud

Find what is the stretch of the 360 cable under the load : What is the maximum load that a .75" diameter steel cable can hold if the UTS of the steel is 145,000 PSI and a safety factor of 1.5 is required.What is the stretch of the 360" cable under this load
What is the speed of the putty : You throw a glob of putty straight up toward the ceiling, which is 3.00m above the point where the putty leaves your hand. What is the speed of the putty just before it strikes the ceiling
Find concentration of acetone in river due to pulse release : The water velocity is estimated to be 3.0 m/sec. Acetone has a density of 0.786 gm/mL and a half-life in water of 20.0 hr. Determine the concentration of acetone in the river due to this pulse release at distance of 2, 4, and 7 km from the site at..
How far did the ball travel during the serve : In the fastest measured tennis serve, the ball left the racquet at 73.14 {\rm{ m/s}}. How far did the ball travel during the serve
What are required amounts of components of water per sack : its desired to produce 5 cubic yards of cencrete with a ratio of 1:1.8:3.5 of cement, snd, and gravel what are the required amounts of components if 5.5 gallons of water per sack of cement is to be used
Find the displacement of the elevator : Starting from rest, an elevator has a constant acceleration of 0.621 m/s2 for a period of 6.25 sec., find the displacement of the elevator
Determine specific work required by the rankine cycle pump : Use the Rankine cycle. The boiler operates at a 1000 kpa with a maximum temperature of 30 degrees Celsius. The condenser is isobaric and operates at -5 degrees Celsius.
Analysis of students performance : WEB based school Administration system is an online software application for interaction between school administration and parents. The software will provide efficient solutions to both parents and school authority which would also help school dur..
Find the angle of the thread : A small sphere with a mass of 3.00×10^?3g and carrying a charge of 5.20×10^?8C hangs from a thread near a very large, Find the angle of the thread

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compare the reactor volume required to achieve efficiency

Compare the reactor volume required to achieve 95% efficiency for Completely Mixed Flow Reactor (CMFR) and a Plug Flow Reactor (PFR) for the following conditions. steady-state, first-order reaction, flow rate = 14m3 / day.

  What are the concentrations of h2po4- and hpo42-

The total phosphate concentration (TOTPO4) in a river is 3.2 mg/L as P. The pH of the river is 7.8. What are the concentrations of H2PO4- and HPO42-

  Discuss all the factors that the client should consider

A flocculation/sedimentation combination basin in a conventional drinking water treatment plant is to be constructed of cast-in-place reinforced concrete. The horizontal flow rectangular basin will be located in New Jersey, USA.

  Determine normal depth and froude number a pvc pipe

A PVC pipe with a diameter of 30 inches will carry a flow of 20 cfs. the bottom slope is 0.005 and the roughness coefficient is 0.015. determine the normal depth, critical depth, velocity and the froude number.

  Determine the pressure head at the top of the dome

A closed cylindrical tank filled with water has a hemispherical dome and is connected to an inverted piping system. The liquid in the top part of the piping system has a specific gravity of 0.68.

  What is the maximum step height

An open rectangular channel is 50 feet wide, flowing at a depth of 5 feet, and is carrying 1000 cubic feet per second. What is the maximum step height than can be placed into the flow without disturbing the upstream depth, without acting as a chok..

  Highway construction project

A soil sample was taken from a proposed cut area in a highway construction project and sent to a soils laboratory for a compaction test, using the Standard Proctor compaction procedure. Results of the test are as follows:

  Determine what is the new flowrate of the channel

The flowrate through an open channel with a slope of 2 % is calculated using Manning's equation at 100 cubic feet per second. If the slope of the channel is doubled to 4%

  What will be the shear stress

A trapezoidal channel is carrying water at a normal depth of 5.2 ft, the channel has a bottom width of 10 ft and side slopes of 2 H to 1 V. It is running on a slope of 0.005 ft/ft. What will be the shear stress in lb/ft^2 exerted on the channel be..

  Compute atomic packing factor for diamond cubic crystal

Assume that bonding atoms touch one another, that the angle between adjacent bonds is 109.5, and that each atom internal to the unit cell is positioned a/4 of the distance away from the two nearest cell faces.

  Determine which motor should be installed based on the pw

At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..

  Determine the maximum shear stress in the material

An element of aluminium in a form of a rectangular parallel pipe has a length 'a' along the x axis of 5.5 in, a length 'b' on the y axis of 4.5 in. Determine the maximum shear stress in the material,the change in length.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd