Staircase detail description of staircase with its

Assignment Help Civil Engineering
Reference no: EM13605339

Detail description of Staircase with it''s plan,design criteria about it for various types of buildings,standerd dimensions of rise & going of stair which is applicable in civil engineering works.

Reference no: EM13605339

Questions Cloud

Weber co uses the retail inventory method to estimate its : weber co. uses the retail inventory method to estimate its inventory for interim statement purposes. data relating to
An urn contains 4 red and 5 white balls 3 balls are : 1 two dice are thrown n times in succession. compute the probability that double 6 appears at least once. how large n
Differences in operating income between variable costing : differences in operating income between variable costing and absorption costing are due solely to accounting for costs.
In the rectangle in the drawing a charge is to be placed : in the rectangle in the drawing a charge is to be placed at the empty corner to make the net force on the charge at
Staircase detail description of staircase with its : detail description of staircase with it3939s plandesign criteria about it for various types of buildingsstanderd
Santos co currently manufactures on of its crucial parts at : santos co. currently manufactures on of its crucial parts at a cost of 3.40 pu. this cost is based on a normal
Staircase detail description of staircase with its : detail description of staircase with it3939s plandesign criteria about it for various types of buildingsstanderd
Determine the exit temperature and the power input assuming : air at 100 kpa and 27degc enters an isentropic compressor at a rate of 100 ls and leaves at 1000 kpa. determine the
Describe any opportunitysunkout-of-pocketandor relevant : describe any opportunitysunkout-of-pocketandor relevant costs that figured in rosleys decision.how did rosley calculate

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the uniform deterministic arrival rate

A ferryboat queuing lane holds 40 vehicles. If vehicles are processed (tolls collected) at a uniform deterministic rate of 5 vehicles per minute and processing begins when the lane reaches capacity

  Since the management of change is a key elementnbspof a

since the management of change is a key elementnbspof a successful process improvement program anbspseries of actions

  What is the dry unit weight the saturated unit weight

What is the dry unit weight, the saturated unit weight, and the buoyant unit weight, of a soil having a ratio of 0.5 and a value of Gs of 2.7

  Determine required width and volume flowrate of the model

The spillway for a dam is 20 m wide and is designed to carry 125 m3/s at flood stage. A 1:15 ratio model is constructed to study the flow characteristics through the spillway. The effects of surface tension and viscosity can be neglected.

  Determine the required do concentration in the treatment

Given the following information, determine the required DO concentration in the treatment plant effluent discharge in order to ensure that at no point downstream the DO in the river drops below 4 mg/L:

  Estimate the buoyant force on deep balsa

Estimate the buoyant force on 10'x10' by 2' deep balsa (SG=0.2) raft with you in it. How deep is it in the water? Be sure to draw well leveled schematic of the system.

  Determine time of queue dissipation and longest queue length

Finally, the wreckage is removed, and the freeway is restored to full capacity (4000 veh/h) at 8:31 a,. Assume D/D/1 queuing to determine time of queue dissipation, longest queue length, total delay, average delay per vehicle, and longest wait of ..

  How would structure a portion of an aviation safety program

How would you structure a portion of an Aviation Safety program for a commercial airline or government agency. Briefly describe one or two safety problems and why it is a serious safety problem.

  Explain how to estimate the amount of rainfall for gauge x

The rain¬fall amounts at three adjacent stations A, B, and C were 4.2, 3.7, and 4.9 in., respectively. The average annual precipitation amounts for the gauges are X = 36.5, A = 42.1, B = 37.1, and C = 39.8 inches.

  Determine the true azimuth and bearing for the line

THE MAGNETIC BEARING OF A BOUNDARY LINE WAS RECORDED AS N35 00'W IN A DEED DATED 1903. AT THAT TIME AND PLACE, THE MAGNETIC DECLINATION WAS KNOWN TO BE 3 15'W

  Determine the force in each of the rods in the beam

Determine the force in each of these rods. Neglect axial compression and shear in the beam. For the beam, Ib = 200(106)mm4, and for each tie rod, A = 100mm2. Take E = 200 GPa.

  Determine what is the porosity of the soil sample

The sample is placed in a 103 F oven overnight and is weighted again the next day. If the weight after drying is 0.85 lb and the specific gravity of the soil granuals is 2.65, what is the porosity of the soil sample

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd