The 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.
This material is related Geotechnical Engineering, please only answer if you are certain and sure of your answer. An undisturbed soil sample has a dry unit weight of 112 pcf with a specific gravity of solids equals to 2.68.
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
Determine the magnitudes of the additional loads that must be applied at B and F if the resultant of all six loads is to pass through the center of the mat.
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.
Compare the total reactor volume required for 90% removal of the same pollutant in a CSTR system that contains a single reactor against a system that contains three CSTR reactors of equal volume in series.
Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?
Writing case study about bridge collapse
The two shafts in a speed-reducer unit are subjected to couples of magnitude M1 = 18 N · m and M2 = 7.5 N · m, respectively.
Suppose that the distance from the lake outlet to the withdrawal cannot be more than 20 mi. What should be the new volume of the lake?
On a flexible pavement with a 3 inch hot mix asphalt (HMA) wearing surface, a 6 inch soil cement base and an 8 inch crushed stone subbase, which truck will cause more pavement damage?(Suppose drainage coefficients are 1.0).
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd