Maximum tensile and compressive bending stresses

Assignment Help Civil Engineering
Reference no: EM1383504

A T-beam is subjected to a uniformly distributed load of 8 kN and two vertical forces, as shown in the figure. When P = 800 lb, A) Draw the shear and bending moment diagram along its length; B) Determine the maximum tensile and compressive bending stresses; and C) determine the maximum shear stress.

Reference no: EM1383504

Questions Cloud

Travel of particle during time period : Determine the acceleration when t = 4 s, the displacement from t = 0 to t = 10 s, and the distance the particle travels during this time period.
Coefficient of static friction between pacakges : The belt starts from rest at time t=0 and its speed increases at a constant rate of 150mm/s^2. Knowing that the coefficient of static friction between the pacakges..
Calculate equivalent pipe size and flow in the pipe : The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the p..
Determine the total shortening of the pile : a) Determine the total shortening of the pile in terms of F, L, A, and E; b) If F=96 kips, L=40 ft., A=100in2, and E=1.5 x 106 psi, how much does such a pile shorten?
Maximum tensile and compressive bending stresses : When P = 800 lb, A) Draw the shear and bending moment diagram along its length; B) Determine the maximum tensile and compressive bending stresses; and C) determine the maximum shear stress.
Determining the velocity of motor having constant power : A constant power of 1.5 hp is supplied to the motor while it operates with an efficiency of ε = 0.8. Determine the velocity of the 200-lb crate in 15 seconds, starting from rest. Neglect friction.
Angular acceleration of the spool : determine the angular acceleration of the spool and the acceleration of the trailer. The wheels have negligible mass and are free to rotate.
Spreader beam and hoisted by a crane : The 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
Shafts in a speed-reducer unit : The two shafts in a speed-reducer unit are subjected to couples of magnitude M1 = 18 N · m and M2 = 7.5 N · m, respectively.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Writing case study about bridge collapse

Writing case study about bridge collapse

  Base of each standpipe

Determine: a) the height of the water, with respect to the base of each standpipe, and b) the effective stress at the depth of each standpipe, at the following times:

  Pore water pressure at failure

A CU triaxial test with σc = 20 psi is performed on a sand and a deviator stress of 80 psi fails the specimen. Previous tests revealed that the effective friction angle for this sand is 35°. Calculate the pore water pressure at failure.

  Rocket velocity as a function of time

(a) Use differentiation to find a general expression for the rocket's velocity as a function of time, (b) When is the velocity zero?

  Maximum volume of treated wastewater

Roughly what is the maximum Volume of treated wastewater should you put in the bottle if you want to have at least 2.0mg/l of DO at the test (filling the rest of the bottle with the water

  Description of the soil characteristics

For each of the horizons, provide a description of the soil characteristics and briefly describe the environment where you would expect to find the horizon?

  Calculate the rotation at point a and b using virtual work

Draw the FBD and the shear and bending moment diagrams. Label all minimums, maximums and zero crossing points as well as the slopes as constant, linear or parabolic.

  Required height of the roller coaster

Determine the required height h of the roller coaster so that when it is essentially at rest at the crest of the hill it will reach a speed v= 100km/hr when it comes to the bottom.

  Probability of finding a bad rivet

Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.

  Surface overflow rate-horizontal flow through velocity

A rectangular clarifier with a length:width ratio of 3:1 receives a flow of 850m3/day. the clarifiers depth is 4.0m and the detention time of the water inthe clarifier is 2.4 hrs, what are the surface overflow rate and the horizontal flow through ..

  Using finite element method to find temperature of the poker

The temperature of the poker at the third points of the poker using three elements of equal length. Use the finite element method. You may use Mathcad to solve this problem. If you do, please show all work and add comments to the Mathcad solution ..

  Volume of soil-excavated from the borrow pit

The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd