Safe work procedures sign-off

Assignment Help Other Subject
Reference no: EM134040769

Erect roof trusses

Q9. Under applicable state WHS Regulations (NSW: WHS Regulation 2017 (NSW); WA: WHS (General) Regulations 2022 (WA)), an employer must provide fall protection where there is a risk of a person falling more than:
a) 1 metre
b) 1.5 metres
c) 2 metres
d) 3 metres
Answer: ____

Q10. The current Australian Standard for the installation of nail-plated timber roof trusses is:
a) AS 1684
b) AS 4440-2004 (R2018)
c) AS 1170
d) AS 3700
Answer: ____

Q11. Permanent bracing of timber roof trusses must include all of the following EXCEPT:
a) Top chord bracing
b) Bottom chord bracing
c) Web bracing
d) Underfloor bracing
Answer: ____

Q12. A brace wall connection running parallel to the bottom chord is required to:
a) Replace gable bracing
b) Transfer racking loads from the brace wall to the truss bottom chord
c) Reduce truss span
d) Cancel the need for tie-downs
Answer: ____

Q13. The standard governing the design and installation of steel roof trusses in residential and low-rise construction is the:
a) NCC Volume Three
b) AS 4440
c) NASH Standard - Residential and Low-rise Steel Framing
d) AS 4100 General Structural Steel
Answer: ____

Q14. The minimum scope of practical performance evidence required by CPCCCA3006 includes erecting:
a) 30 m² timber trusses only
b) 30 m² steel trusses only
c) 30 m² of timber AND 30 m² of steel trusses, each with hip end and valley and one gable end
d) 10 m² of either timber or steel trusses
Answer: ____

Quantity Calculation Activity (Numeracy - Foundation Skill)

As part of Activity 4 Template 1, calculate the following from the supplied roof plan and truss layout. Show your working. This activity provides direct evidence of the Numeracy Foundation Skill.

Calculate the total square metreage of the roof for the timber zone.
Calculate the total square metreage of the roof for the steel zone.
Calculate the number of trusses required at the design centre-to-centre spacing.
Calculate the linear metres of bracing material required.
Calculate the quantity of nail-plate fasteners (timber) and screw / bracket fasteners (steel) required.

Activity 1: Safe Work Procedures (SWPs) Sign-Off

Students are to check the tools and equipment, review the physical worksite, attend a tool-box meeting, review the SWPs and complete and sign-off the SWPs form given as Appendix C.Once students have reviewed all relevant information, they are to sign off the SWPs form to confirm their understanding.

Note:
The SWPs are provided as Appendix C to this assessment.
The student must review the SWPs and complete and sign-off the SWPs form.

Activity 2: Job Hazard Analysis (JHA) to identify hazards and control hazards

To perform this activity, the trainer/assessor shall show the required tools and equipment and the work location to each student so that they are able to identify potential hazards and consider adequate control measures.

The purpose of conducting Job Hazard Analysis (JHA) is to inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.

Students are to review the physical worksite and tools and equipment, attend a tool-box meeting, review the instructions manual and complete the Job Hazard Analysis (JHA) form/checklist on the following page. The student must place a "√" in the checkbox if the hazard listed is relevant and leave it blank/empty if it is not relevant. If the student identifies any hazards, not on the checklist, they must add them to one of the blank spaces available in the checklist. Students must write up the control measures they think should be implemented. If the students think there are no control measures required, they must write "not applicable" in the form as any blank boxes will be marked as unsatisfactory.

Activity 3: Record of Tool-Box Meeting

The trainer/assessor, acting as the worksite supervisor, will run a tool-box meeting for students. The students are to listen carefully to the information provided and then fill out the "Record Tool-Box Meeting" form below. The student must place a "√" against each item they think the Supervisor has covered. The student must place an "X" against any item that is not covered. If the Supervisor (trainer) discusses an item that is not included on the form, the student must add a comment in the "Comment/Discussion" section at the bottom of the form to briefly identify what was discussed.

If the student thinks there were no additional items discussed, be sure to write "not applicable" in the form as any blank boxes will be marked as unsatisfactory.

The student will be given time to fill out the "Record Toolbox Meeting" in the classroom after they complete the tool-box meeting. Students are allowed to take the "Record Toolbox Meeting" form with them to the tool-box meeting.

At the conclusion of the meeting, the trainer/assessor will ask each student to repeat or paraphrase one item from the list of items. The student will need to respond verbally by summarising their understanding of what was said about that specific item. This also provides the opportunity for the student to demonstrate their verbal communication with the rest of the group.

Activity 4: Plan and prepare to erect roof trusses

This activity requires you to plan and prepare to erect the following roof trusses:

Timber roof trusses:
Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:
a minimum 30 square metres of timber roof trusses with a major and minor span, including:
one hip end and valley
one gable end

Installing:
For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.

Activity 5: Erect roof trusses.

This activity requires you to set out, erect and install the following roof trusses in preparation for the installation of waterproof roof coverings.

Timber roof trusses:
Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:
a minimum 30 square metres of timber roof trusses with a major and minor span, including:
one hip end and valley
one gable end

Installing:
For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.

Steel roof trusses:
Setting out, erecting and bracing steel trusses to the requirements of the NASH Standards to the following specifications:
a minimum 30 square metres of steel roof trusses with a major and minor span, including:
one hip end and valley
one gable end

Installing:
gable bracing, bottom chord bracing, web bracing and top chord bracing installed in line with the requirements of the NASH Standards
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.

This activity must be completed in accordance with the outcomes of Activity 1-Activity 3.

To complete this activity, you are required to:
Complete the steps given in the ‘Checklist 2' provided.
Comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers' specifications, workplace requirements, drawings and specifications.
Wear PPE appropriate for the job.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Your trainer/assessor (Supervisor) will observe you performing this activity and sign off the checklist after completing each step.

Assessment 2: Simulated Practical Activity

In this task, you are required to demonstrate your skills and knowledge to select, set out, erect and brace timber and steel roof trusses in accordance with relevant standards and workplace requirements.

This assessment is to be completed in the workplace and you will need access to:

Activity 1: Safe Work Procedures (SWPs) Sign-Off

Students are to check the tools and equipment, review the physical worksite, attend a tool-box meeting, review the SWPs and complete and sign-off the SWPs form given as Appendix C. Once students have reviewed all relevant information, they are to sign off the SWPs form to confirm their understanding.

Activity 2: Job Hazard Analysis (JHA) to identify hazards and control hazards

To perform this activity, the trainer/assessor shall show the required tools and equipment and the work location to each student so that they are able to identify potential hazards and consider adequate control measures.

The purpose of conducting Job Hazard Analysis (JHA) is to inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.

Students are to review the physical worksite and tools and equipment, attend a tool-box meeting, review the instructions manual and complete the Job Hazard Analysis (JHA) form/checklist on the following page. The student must place a "√" in the checkbox if the hazard listed is relevant and leave it blank/empty if it is not relevant. If the student identifies any hazards, not on the checklist, they must add them to one of the blank spaces available in the checklist. Students must write up the control measures they think should be implemented. If the students think there are no control measures required, they must write "not applicable" in the form as any blank boxes will be marked as unsatisfactory.

Activity 3: Record of Tool-Box Meeting

The trainer/assessor, acting as the worksite supervisor, will run a tool-box meeting for students. The students are to listen carefully to the information provided and then fill out the "Record Tool-Box Meeting" form below. The student must place a "√" against each item they think the Supervisor has covered. The student must place an "X" against any item that is not covered. If the Supervisor (trainer) discusses an item that is not included on the form, the student must add a comment in the "Comment/Discussion" section at the bottom of the form to briefly identify what was discussed.

If the student thinks there were no additional items discussed, be sure to write "not applicable" in the form as any blank boxes will be marked as unsatisfactory. The student will be given time to fill out the "Record Toolbox Meeting" in the classroom after they complete the tool-box meeting. Students are allowed to take the "Record Toolbox Meeting" form with them to the tool-box meeting.

At the conclusion of the meeting, the trainer/assessor will ask each student to repeat or paraphrase one item from the list of items. The student will need to respond verbally by summarising their understanding of what was said about that specific item. This also provides the opportunity for the student to demonstrate their verbal communication with the rest of the group.

Activity 4: Plan and prepare to erect roof trusses

This activity requires you to plan and prepare to erect the following roof trusses:

Timber roof trusses:

Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:

a minimum 30 square metres of timber roof trusses with a major and minor span, including:

one hip end and valley

one gable end

Installing:

For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)

a connection between an internal brace wall running parallel to the bottom chord

a connection between an internal brace wall running at 90 degrees to the bottom chord.

Steel roof trusses:

Setting out, erecting and bracing steel trusses to the requirements of the NASH Standards to the following specifications:

a minimum 30 square metres of steel roof trusses with a major and minor span, including:

one hip end and valley

one gable end

Installing:

gable bracing, bottom chord bracing, web bracing and top chord bracing installed in line with the requirements of the NASH Standards

a connection between an internal brace wall running parallel to the bottom chord

a connection between an internal brace wall running at 90 degrees to the bottom chord.

This activity must be completed in accordance with the roof and truss plans and specifications.

To complete this activity, you are required to:

Complete the steps given in the ‘Checklist 1' provided.

Comply with the requirements of Civil Engineering, Australian Standards, work health and safety (WHS), Commonwealth and state or territory legislation, manufacturers' specifications, and environmental plans and obligations.

Wear PPE appropriate for the job.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Activity 5: Erect roof trusses.

This activity requires you to set out, erect and install the following roof trusses in preparation for the installation of waterproof roof coverings.

Timber roof trusses:

Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:

a minimum 30 square metres of timber roof trusses with a major and minor span, including:

one hip end and valley

one gable end

Installing:

For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)

a connection between an internal brace wall running parallel to the bottom chord

a connection between an internal brace wall running at 90 degrees to the bottom chord.

Steel roof trusses:

Setting out, erecting and bracing steel trusses to the requirements of the NASH Standards to the following specifications:

a minimum 30 square metres of steel roof trusses with a major and minor span, including:

one hip end and valley

one gable end

Installing:

gable bracing, bottom chord bracing, web bracing and top chord bracing installed in line with the requirements of the NASH Standards

a connection between an internal brace wall running parallel to the bottom chord

a connection between an internal brace wall running at 90 degrees to the bottom chord.

This activity must be completed in accordance with the outcomes of Activity 1-Activity 3.

To complete this activity, you are required to:

Complete the steps given in the ‘Checklist 2' provided.

Comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers' specifications, workplace requirements, drawings and specifications.

Wear PPE appropriate for the job.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Your trainer/assessor (Supervisor) will observe you performing this activity and sign off the checklist after completing each step.

Activity 6: Clean up.

This activity requires you to perform clean up after erecting the following roof trusses:

Timber roof trusses

Steel roof trusses

To complete this activity, you are required to:

Complete the steps given in the ‘Checklist 3' provided.

Comply with WHS/OHS requirements.

Wear PPE appropriate for the job.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Your trainer/assessor (Supervisor) will observe you performing this activity and sign off the checklist after completing each step.

Reference no: EM134040769

Questions Cloud

Endowed by their creator with certain ineligible right : I believe Abarham Lincolns policy and promise like belief that people are endowed by their Creator with certain ineligible right should be sacredly preserved
Evaluate mental health models of care in the context : NURS2221 Complex Mental Health and Recovery, Swinburne University of Technology - Evaluate mental health models of care in the context of the legislation
What steps can healthbridge take to establish : Case Study: Knowledge Management Crisis at HealthBridge Network - HealthBridge Network is a mid-sized, not-for-profit healthcare provider operating across
Discuss the cyber issue of concern : Discuss the cyber issue of concern. Identify and compare the chosen country's applicable laws - Clearly state your chosen topic and the country
Safe work procedures sign-off : CPCCCA3006 Erect roof trusses, Lead College - Safe Work Procedures (SWPs) Sign-Off and Job Hazard Analysis (JHA) to identify hazards and control hazards
Outline one specific teaching goal and short-term plan : Critically reflect on your confidence, use and progression of te reo Maori and consider two specific Maori values, concepts, traditions, or practices
Policy analysis brief focusing on the public policy : Policy analysis brief focusing on the public policy controversy and the justice and security issues associated with the controversy
About lincoln and the republican party : What kinds of accusations did the commissioners repeatedly make about Lincoln and the Republican party?
Bestowed upon us their warmest sympathies : The potential annexation of Texas by America? They have already bestowed upon us their warmest sympathies.

Reviews

len4040769

9/4/2026 6:36:55 AM

It’s regarding carpentry This is my final attempt for all the assignments, So please make a perfect work to score good marks

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote