Erect roof trusses
Q9. Under applicable state WHS Regulations (NSW: WHS Regulation 2017 (NSW); WA: WHS (General) Regulations 2022 (WA)), an employer must provide fall protection where there is a risk of a person falling more than:
a) 1 metre
b) 1.5 metres
c) 2 metres
d) 3 metres
Answer: ____
Q10. The current Australian Standard for the installation of nail-plated timber roof trusses is:
a) AS 1684
b) AS 4440-2004 (R2018)
c) AS 1170
d) AS 3700
Answer: ____
Q11. Permanent bracing of timber roof trusses must include all of the following EXCEPT:
a) Top chord bracing
b) Bottom chord bracing
c) Web bracing
d) Underfloor bracing
Answer: ____
Q12. A brace wall connection running parallel to the bottom chord is required to:
a) Replace gable bracing
b) Transfer racking loads from the brace wall to the truss bottom chord
c) Reduce truss span
d) Cancel the need for tie-downs
Answer: ____
Q13. The standard governing the design and installation of steel roof trusses in residential and low-rise construction is the:
a) NCC Volume Three
b) AS 4440
c) NASH Standard - Residential and Low-rise Steel Framing
d) AS 4100 General Structural Steel
Answer: ____
Q14. The minimum scope of practical performance evidence required by CPCCCA3006 includes erecting:
a) 30 m² timber trusses only
b) 30 m² steel trusses only
c) 30 m² of timber AND 30 m² of steel trusses, each with hip end and valley and one gable end
d) 10 m² of either timber or steel trusses
Answer: ____
Quantity Calculation Activity (Numeracy - Foundation Skill)
As part of Activity 4 Template 1, calculate the following from the supplied roof plan and truss layout. Show your working. This activity provides direct evidence of the Numeracy Foundation Skill.
Calculate the total square metreage of the roof for the timber zone.
Calculate the total square metreage of the roof for the steel zone.
Calculate the number of trusses required at the design centre-to-centre spacing.
Calculate the linear metres of bracing material required.
Calculate the quantity of nail-plate fasteners (timber) and screw / bracket fasteners (steel) required.
Activity 1: Safe Work Procedures (SWPs) Sign-Off
Students are to check the tools and equipment, review the physical worksite, attend a tool-box meeting, review the SWPs and complete and sign-off the SWPs form given as Appendix C.Once students have reviewed all relevant information, they are to sign off the SWPs form to confirm their understanding.
Note:
The SWPs are provided as Appendix C to this assessment.
The student must review the SWPs and complete and sign-off the SWPs form.
Activity 2: Job Hazard Analysis (JHA) to identify hazards and control hazards
To perform this activity, the trainer/assessor shall show the required tools and equipment and the work location to each student so that they are able to identify potential hazards and consider adequate control measures.
The purpose of conducting Job Hazard Analysis (JHA) is to inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
Students are to review the physical worksite and tools and equipment, attend a tool-box meeting, review the instructions manual and complete the Job Hazard Analysis (JHA) form/checklist on the following page. The student must place a "√" in the checkbox if the hazard listed is relevant and leave it blank/empty if it is not relevant. If the student identifies any hazards, not on the checklist, they must add them to one of the blank spaces available in the checklist. Students must write up the control measures they think should be implemented. If the students think there are no control measures required, they must write "not applicable" in the form as any blank boxes will be marked as unsatisfactory.
Activity 3: Record of Tool-Box Meeting
The trainer/assessor, acting as the worksite supervisor, will run a tool-box meeting for students. The students are to listen carefully to the information provided and then fill out the "Record Tool-Box Meeting" form below. The student must place a "√" against each item they think the Supervisor has covered. The student must place an "X" against any item that is not covered. If the Supervisor (trainer) discusses an item that is not included on the form, the student must add a comment in the "Comment/Discussion" section at the bottom of the form to briefly identify what was discussed.
If the student thinks there were no additional items discussed, be sure to write "not applicable" in the form as any blank boxes will be marked as unsatisfactory.
The student will be given time to fill out the "Record Toolbox Meeting" in the classroom after they complete the tool-box meeting. Students are allowed to take the "Record Toolbox Meeting" form with them to the tool-box meeting.
At the conclusion of the meeting, the trainer/assessor will ask each student to repeat or paraphrase one item from the list of items. The student will need to respond verbally by summarising their understanding of what was said about that specific item. This also provides the opportunity for the student to demonstrate their verbal communication with the rest of the group.
Activity 4: Plan and prepare to erect roof trusses
This activity requires you to plan and prepare to erect the following roof trusses:
Timber roof trusses:
Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:
a minimum 30 square metres of timber roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
Activity 5: Erect roof trusses.
This activity requires you to set out, erect and install the following roof trusses in preparation for the installation of waterproof roof coverings.
Timber roof trusses:
Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:
a minimum 30 square metres of timber roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
Steel roof trusses:
Setting out, erecting and bracing steel trusses to the requirements of the NASH Standards to the following specifications:
a minimum 30 square metres of steel roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
gable bracing, bottom chord bracing, web bracing and top chord bracing installed in line with the requirements of the NASH Standards
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
This activity must be completed in accordance with the outcomes of Activity 1-Activity 3.
To complete this activity, you are required to:
Complete the steps given in the ‘Checklist 2' provided.
Comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers' specifications, workplace requirements, drawings and specifications.
Wear PPE appropriate for the job.
While completing each step, you must place a tick mark against each step given in the checklist once completed.
Your trainer/assessor (Supervisor) will observe you performing this activity and sign off the checklist after completing each step.
Assessment 2: Simulated Practical Activity
In this task, you are required to demonstrate your skills and knowledge to select, set out, erect and brace timber and steel roof trusses in accordance with relevant standards and workplace requirements.
This assessment is to be completed in the workplace and you will need access to:
Activity 1: Safe Work Procedures (SWPs) Sign-Off
Students are to check the tools and equipment, review the physical worksite, attend a tool-box meeting, review the SWPs and complete and sign-off the SWPs form given as Appendix C. Once students have reviewed all relevant information, they are to sign off the SWPs form to confirm their understanding.
Activity 2: Job Hazard Analysis (JHA) to identify hazards and control hazards
To perform this activity, the trainer/assessor shall show the required tools and equipment and the work location to each student so that they are able to identify potential hazards and consider adequate control measures.
The purpose of conducting Job Hazard Analysis (JHA) is to inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
Students are to review the physical worksite and tools and equipment, attend a tool-box meeting, review the instructions manual and complete the Job Hazard Analysis (JHA) form/checklist on the following page. The student must place a "√" in the checkbox if the hazard listed is relevant and leave it blank/empty if it is not relevant. If the student identifies any hazards, not on the checklist, they must add them to one of the blank spaces available in the checklist. Students must write up the control measures they think should be implemented. If the students think there are no control measures required, they must write "not applicable" in the form as any blank boxes will be marked as unsatisfactory.
Activity 3: Record of Tool-Box Meeting
The trainer/assessor, acting as the worksite supervisor, will run a tool-box meeting for students. The students are to listen carefully to the information provided and then fill out the "Record Tool-Box Meeting" form below. The student must place a "√" against each item they think the Supervisor has covered. The student must place an "X" against any item that is not covered. If the Supervisor (trainer) discusses an item that is not included on the form, the student must add a comment in the "Comment/Discussion" section at the bottom of the form to briefly identify what was discussed.
If the student thinks there were no additional items discussed, be sure to write "not applicable" in the form as any blank boxes will be marked as unsatisfactory. The student will be given time to fill out the "Record Toolbox Meeting" in the classroom after they complete the tool-box meeting. Students are allowed to take the "Record Toolbox Meeting" form with them to the tool-box meeting.
At the conclusion of the meeting, the trainer/assessor will ask each student to repeat or paraphrase one item from the list of items. The student will need to respond verbally by summarising their understanding of what was said about that specific item. This also provides the opportunity for the student to demonstrate their verbal communication with the rest of the group.
Activity 4: Plan and prepare to erect roof trusses
This activity requires you to plan and prepare to erect the following roof trusses:
Timber roof trusses:
Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:
a minimum 30 square metres of timber roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
Steel roof trusses:
Setting out, erecting and bracing steel trusses to the requirements of the NASH Standards to the following specifications:
a minimum 30 square metres of steel roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
gable bracing, bottom chord bracing, web bracing and top chord bracing installed in line with the requirements of the NASH Standards
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
This activity must be completed in accordance with the roof and truss plans and specifications.
To complete this activity, you are required to:
Complete the steps given in the ‘Checklist 1' provided.
Comply with the requirements of Civil Engineering, Australian Standards, work health and safety (WHS), Commonwealth and state or territory legislation, manufacturers' specifications, and environmental plans and obligations.
Wear PPE appropriate for the job.
While completing each step, you must place a tick mark against each step given in the checklist once completed.
Activity 5: Erect roof trusses.
This activity requires you to set out, erect and install the following roof trusses in preparation for the installation of waterproof roof coverings.
Timber roof trusses:
Setting out, erecting and bracing timber trusses manufactured to AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses to the following specifications:
a minimum 30 square metres of timber roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
For timber roof trusses, install gable, bottom chord, web and top chord bracing in accordance with AS 4440-2004 (R2018) Installation of nail-plated timber roof trusses. For steel roof trusses, install gable, bottom chord, web and top chord bracing in accordance with the NASH Standard - Residential and Low-rise Steel Framing, Part 2: Design Solutions (current edition)
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
Steel roof trusses:
Setting out, erecting and bracing steel trusses to the requirements of the NASH Standards to the following specifications:
a minimum 30 square metres of steel roof trusses with a major and minor span, including:
one hip end and valley
one gable end
Installing:
gable bracing, bottom chord bracing, web bracing and top chord bracing installed in line with the requirements of the NASH Standards
a connection between an internal brace wall running parallel to the bottom chord
a connection between an internal brace wall running at 90 degrees to the bottom chord.
This activity must be completed in accordance with the outcomes of Activity 1-Activity 3.
To complete this activity, you are required to:
Complete the steps given in the ‘Checklist 2' provided.
Comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers' specifications, workplace requirements, drawings and specifications.
Wear PPE appropriate for the job.
While completing each step, you must place a tick mark against each step given in the checklist once completed.
Your trainer/assessor (Supervisor) will observe you performing this activity and sign off the checklist after completing each step.
Activity 6: Clean up.
This activity requires you to perform clean up after erecting the following roof trusses:
Timber roof trusses
Steel roof trusses
To complete this activity, you are required to:
Complete the steps given in the ‘Checklist 3' provided.
Comply with WHS/OHS requirements.
Wear PPE appropriate for the job.
While completing each step, you must place a tick mark against each step given in the checklist once completed.
Your trainer/assessor (Supervisor) will observe you performing this activity and sign off the checklist after completing each step.