Replacing an existing production line

Assignment Help Basic Computer Science
Reference no: EM131514387

PART 1:

ACME Manufacturing is considering replacing an existing production line with a new line that has a greater output capacity and operates with less labor than the existing line.

The new line would cost $1 million, have a five-year life, and be depreciated using MACRS over three years. At the end of five years, the new line could be sold as scrap for $950,000 (in year 5 dollars). Because the new line is more automated, it would require fewer operators, resulting in a savings of $66,000 per year before tax and unadjusted for inflation (in today's dollars). Additional sales with the new machine are expected to result in additional net cash inflows, before tax, of $118,000 per year (in today's dollars). If ACME invests in the new line, a one-time investment of $10,000 in additional working capital will be required. The tax rate is 35 percent, the opportunity cost of capital is 10 percent, and the annual rate of inflation is 2.40 percent. What is the NPV of the new production line? (Round intermediate calculations and final answer to the nearest whole dollar, e.g. 5,275. Enter negative amounts using either a negative sign preceding the number e.g. -45 or parentheses e.g. (45).)

PART 2:

The alternative to investing in the new production line is to overhaul the existing line, which currently has both a book value and a salvage value of $0. It would cost $ 220,000 to overhaul the existing line, but this expenditure would extend its useful life to five years. The line would have a $0 salvage value at the end of five years. The overhaul outlay would be capitalized and depreciated using MACRS over three years. The tax rate is 35 percent, the opportunity cost of capital is 13 percent. The NPV of the new production line is $ -192,000 . Should ACME replace or renovate the existing line? (Round your intermediate calculations and final answer to the nearest dollar, e.g. 5,275. Enter negative amounts using either a negative sign preceding the number e.g. -45 or parentheses e.g. (45).)

Reference no: EM131514387

Questions Cloud

Breast of a fellow actor : Marwan committed sexual harassment because he grabbed the breast of a fellow actor which is against this chapter of the Civil Rights Act.
Explain in a few sentences whether you should invest : Consider Porter's five forces, based on those forces, explain in a few sentences whether you should invest in your industry based on those forces.
Contract between accounting firm and college student : Explain whether there is a binding contract between the accounting firm and the college student, and if there is adequate proof thereof.
Company website with multimedia : How to write a business presentation being given to update management on proposal to update the company's website with multimedia.
Replacing an existing production line : ACME Manufacturing is considering replacing an existing production line with a new line that has a greater output capacity and operates with less labor.
Explain the essential skills that would make a candidate : Describe one researched accounting position, and explain the essential skills that would make a candidate successful in the position.
Brics and mitsk project : This project introduces the Brics and Mitsk countries and integrates the concepts presented in Weeks 1-4. It also provides a common foundation for future.
Traditional mortgage payments : How long would it take for S&S Air to pay off the smart loan assuming 30-year traditional mortgage payments?
Project topic - strength characteristics on fly ash : 42908 Engineering Project Preparation Assignment. Project topic is strength characteristics on fly ash based geo-polymer concrete

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Identifies the cost of computer

identifies the cost of computer components to configure a computer system (including all peripheral devices where needed) for use in one of the following four situations:

  Input devices

Compare how the gestures data is generated and represented for interpretation in each of the following input devices. In your comparison, consider the data formats (radio waves, electrical signal, sound, etc.), device drivers, operating systems suppo..

  Cores on computer systems

Assignment : Cores on Computer Systems:  Differentiate between multiprocessor systems and many-core systems in terms of power efficiency, cost benefit analysis, instructions processing efficiency, and packaging form factors.

  Prepare an annual budget in an excel spreadsheet

Prepare working solutions in Excel that will manage the annual budget

  Write a research paper in relation to a software design

Research paper in relation to a Software Design related topic

  Describe the forest, domain, ou, and trust configuration

Describe the forest, domain, OU, and trust configuration for Bluesky. Include a chart or diagram of the current configuration. Currently Bluesky has a single domain and default OU structure.

  Construct a truth table for the boolean expression

Construct a truth table for the Boolean expressions ABC + A'B'C' ABC + AB'C' + A'B'C' A(BC' + B'C)

  Evaluate the cost of materials

Evaluate the cost of materials

  The marie simulator

Depending on how comfortable you are with using the MARIE simulator after reading

  What is the main advantage of using master pages

What is the main advantage of using master pages. Explain the purpose and advantage of using styles.

  Describe the three fundamental models of distributed systems

Explain the two approaches to packet delivery by the network layer in Distributed Systems. Describe the three fundamental models of Distributed Systems

  Distinguish between caching and buffering

Distinguish between caching and buffering The failure model defines the ways in which failure may occur in order to provide an understanding of the effects of failure. Give one type of failure with a brief description of the failure

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd