Problem 1 Facility Location 
A big retail chain needs to find the best location to build new warehouse. The new warehouse will mainly serve on a weekly basis 8 stores in the northeast.
Using Euclidian distances compute the center of gravity and calculate the total transportation cost.
The following information has been collected for the 8 stores:
|   |   Rate $/Ton Mile | Tons | Coordinates | 
|   | 
 | 
 | x | y | 
| A | 1.30 | 300 | 700 | 1200 | 
| B | 0.95 | 400 | 250 | 600 | 
| C | 0.85 | 600 | 225 | 825 | 
| D | 1.20 | 323 | 600 | 500 | 
| E | 1.30 | 230 | 1050 | 1200 | 
| F | 0.80 | 120 | 800 | 300 | 
| G | 0.90 | 400 | 925 | 975 | 
| H | 1.23 | 300 | 1000 | 1080 | 
Problem 2 Facility layout 
Assume the following office plan among different departments.

The average number of contacts among departments per week is indicated below:
|   | Adm | R&D | Prog | Design | Sales | Cons | 
| Adm | - | 2 | 8 | 6 | 20 | 10 | 
| R&D |   | - | 30 | 50 | 40 | 20 | 
| Prog |   |   | - | 50 | 10 | 70 | 
| Design |   |   |   | - | 20 | 30 | 
| Sales |   |   |   |   | - | 50 | 
| Cons |   |   |   |   |   | - | 
Compute the total "load-distance" LD score for the current solution, and then try to find an improved layout.
Problem 3 Materials Requirements Planning 
A manufacturing plant produces an end-item A, according to the following bill of materials:

The MPS for the end-item A is given in table 1. The manufacturing / assembly lead times, the lot sizing rules, and the current on-hand inventory for all constituting items are given in table 2. There are scheduled receipts for item C at week 1 (100 pieces) and for item D at week 3 (80 pieces).
Table 1: MPS Quantities
| MPS   Quantities | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 
| Gross   Requirements (Α) | - | 30 | - | 50 | - | 200 | - | 120 | 180 | 60 | 
Table 2: Lead times, lot sizing rules, on-hand inventory
| Item | Lead   Time | Lot   sizing rule | On-hand   inventory | 
| A | 2 weeks | Lot-for-lot | 40 | 
| B | 1 week | Fixed   Order Period = 3 weeks | 20 | 
| C | 2 weeks | Lot-for-lot | 20 | 
| D | 3 weeks | Fixed   Order Quantity = 500 units | 300 | 
Determine the material requirement plan (fill the following tables).
| Item: A | Production Lead Time: 2   weeks | Lot size rule:  Lot-for-Lot | 
| Week No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 
| Gross Requirements |   |   |   |   |   |   |   |   |   |   | 
| Adjusted Scheduled Receipts |   |   |   |   |   |   |   |   |   |   | 
| Projected on-hand         40 |   |   |   |   |   |   |   |   |   |   | 
| Net Requirements |   |   |   |   |   |   |   |   |   |   | 
| Planned order receipt |   |   |   |   |   |   |   |   |   |   | 
| Planned order release |   |   |   |   |   |   |   |   |   |   | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 
| Item: B | Production Lead Time: 1   week | Lot size rule:   FOP (P=3 weeks) | 
| Week No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 
| Gross Requirements |   |   |   |   |   |   |   |   |   |   | 
| Adjusted Scheduled Receipts |   |   |   |   |   |   |   |   |   |   | 
| Projected on-hand         20 |   |   |   |   |   |   |   |   |   |   | 
| Net Requirements |   |   |   |   |   |   |   |   |   |   | 
| Planned order receipt |   |   |   |   |   |   |   |   |   |   | 
| Planned order release |   |   |   |   |   |   |   |   |   |   | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 
| Item: C | Production Lead Time: 2   week | Lot size rule:  Lot-for-Lot | 
| Week No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 
| Gross Requirements |   |   |   |   |   |   |   |   |   |   | 
| Adjusted Scheduled Receipts |   |   |   |   |   |   |   |   |   |   | 
| Projected on-hand       20 |   |   |   |   |   |   |   |   |   |   | 
| Net Requirements |   |   |   |   |   |   |   |   |   |   | 
| Planned order receipt |   |   |   |   |   |   |   |   |   |   | 
| Planned order release |   |   |   |   |   |   |   |   |   |   | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 
| Item: D | Production Lead Time: 3   weeks | Lot size rule: FOQ   (Q=500) | 
| Week No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 
| Gross Requirements |   |   |   |   |   |   |   |   |   |   | 
| Adjusted Scheduled Receipts |   |   |   |   |   |   |   |   |   |   | 
| Projected on-hand       300 |   |   |   |   |   |   |   |   |   |   | 
| Net Requirements |   |   |   |   |   |   |   |   |   |   | 
| Planned order receipt |   |   |   |   |   |   |   |   |   |   | 
| Planned order release |   |   |   |   |   |   |   |   |   |   | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 |