PURPOSE OF ASSIGNMENT

The purpose of this assignment is to:

- ULO1: Articulate a thorough understanding of the basic principles and practices of measurement and estimating.

- ULO2: Demonstrate the use of the Australian Standard Method of Measurement (ASMM) as a tool for completing measurement and estimating work.

- ULO3: Measure quantities and estimate unit rates to prepare tenders for common types of low and medium rise construction.

ASSIGNMENT TASK

Overview of the assignment task

This assignment consists of two elements in which you are required to carry out work leading up to and including the preparation and pricing of Bills of Quantities (BOQ).

The element 1 requires you to produce a number of sections of the final draft BOQ for the proposed New Apartment Development (Job no: 12-171) shown on the attached structural and architectural drawings. With regards to the BOQ, you are required to produce the measured work sections of the document. You are not required to produce a full preliminaries section.

In element 2, you are required to estimate unit rates for, and to price the items within the work sections of the BOQ you prepared in element 1.

Further requirements for element 1 and element 2 are given below:

Element 1: Measurement, billing & BOQ finalization task and individual report
Element 1 - Part 1
For "element 1 - part 1", your group is required to produce the measured work sections of the BOQ for the following work of the proposed new apartment development:

I. Preliminaries (Include a total of ten (10) preliminaries items - Include an item for Description of the Works, and nine (9) other items that would normally need to be priced by the contractor's estimator)

II. Groundworks (excluding groundworks for bored piers)

III. In-situ concrete work (up to the bottom of level 2 floor slab [first floor slab]
only, excluding bored piers and stair cases)

IV. Formwork for in-situ concrete (up to the bottom of level 2 floor slab [first floor slab] only, excluding bored piers and stair cases)
Your Take-off and BOQ must be prepared in accordance with the requirements of the

Australian Standard Method of Measurement (ASMM) 6th edition.
The BOQ task MUST be completed using a suitable software such as MS Excel while take-off MUST be carried out manually as a hand-written document.

Essentially there are three sub-stages for you to carry out in connection with the BOQ preparation:

1. The taking off of the quantities - This is, the measurement of the construction work - setting down of descriptions and their related dimensions. A manual take-off (hand-written) on the appropriate paper is required for this task.

2. The preparation of a first draft BOQ - It is likely you will possibly (not always) take-off the work by sub groups. For example, the substructure group will include some excavation and some concrete. Preparing the first draft involves the reordering of the take-off into the ASMM sections listed under (i) to (iv) above.

3. The preparation of the final draft BOQ - This is where the information set down on the manual take-off is transferred into a professional document (BOQ). The final BOQ must be completed (as noted previously) using a suitable software such as MS Excel.
Ensure that you show all waste calculations within the take-offs, and if needed, annotate the take-offs with side notes and mark-up the drawings to show that you have measured all items required.

Make sensible assumptions in relation to the measurements where any information is missing, specification is inadequate or exact nature of construction is not clear. Any assumptions made shall be entered on to a Query Sheet for the attention of the Architect.
Note that around and within these tasks will be the supplementary activity such as checking and amending your work at each stage. Checking is a must NOT a maybe. This is the quality assurance component for your BOQ that is required for a professional workplace standard. Your submission should clearly demonstrate that you have undertaken the various procedures and associated checking.
Remember to check, check and double check.

Ensure that you employ all standard techniques and follow all conventions for setting out construction measurement information in preparing the take-off and BOQ.

You are required to organize your group in such a way that all six group members are involved in element 1, so that each group member has an involvement and understands all aspects of the work.

Element 1 - Part 2
"Element 1 - part 2" involves each student submitting an individual report which is a concise discussion/reflection about how the group went about completing this assignment - how the work was distributed, who did what, what contribution everyone made, how the team collaborated and communicated, what you learned from the assignment, what difficulties encountered and how they were resolved etc.

Element 2 - Pricing bills of quantities

Element 2 - Part 1
For "element 2 - part 1", it is important to appreciate that your role has now changed. In the first element of the assignment your group was operating in the manner of a cost consultant or quantity surveyor representing the client. Your task, simply stated was to prepare a tender document (BOQ), which would be sent to several contractors. These contractors would then use the BOQ to prepare their bid in competition with other contractors to win the project.

Your task now is to operate in the same manner as a team of estimators working for one of the tendering contractors.

You are required to calculate unit rates for the items within the following work sections, which appear in your BOQ for the proposed

New Apartment Development:
I. Preliminaries (Include a total of ten (10) preliminaries items - Include an item for Description of the Works, and nine (9) other items that would normally need to be priced by the contractor's estimator)
II. Groundworks (excluding groundworks for bored piers)
III. In-situ concrete work (up to the bottom of level 2 floor slab [first floor slab]
only, excluding bored piers and stair cases)

IV. Formwork for in-situ concrete (up to the bottom of level 2 floor slab [first floor slab] only, excluding bored piers and stair cases)
There must be the build-ups for each unit rate - that is, the back up to the calculations. Note, the task is to calculate the unit rates not look up the rates in Rawlinson's or some other reference book, you may however use Rawlinsons to cross check your rate build-ups.

When you have calculated the unit rates you should enter them into your final BOQ at the appropriate position and extend the figures to determine the cost for each of the work sections and a total cost for the works (exclude profit, contingencies or any mark-up).

All unit rate build-up calculations produced must be printed and attached to your final assignment. The calculations can be printed using the ‘print screen' function, and is acceptable for this assignment.

As noted in element 1 of the assignment that around and within these tasks will be the supplementary activity such as checking and amending your work at each stage. Checking is a must NOT a maybe. This is the quality assurance component for your work that is required for a professional workplace standard. Your submission should clearly demonstrate that you have undertaken the various procedures and associated checking.

Remember check, check and double check.

You are required to organize your group in such a way that all six group members are involved in element 2, so that each group member has an involvement and understands all aspects of the work.

Element 2 - Part 2
"Element 2 - part 2" involves each student submitting an individual report which is a concise discussion/reflection about how the group went about completing this assignment - how the work was distributed, who did what, what contribution everyone made, how the team collaborated and communicated, what you learned from the assignment, what difficulties encountered and how they were resolved etc.

FORMAT OF ASSIGNMENT

Element 1
- Element 1 must be submitted as a single A4 pdf document, that has been "stitched" together, which will include your take-off, formal non-priced BOQ, marked up drawings, query sheet and individual report. However, you need to separately identify part 1 and part 2 within the report.
o Part 1 includes: take-offs, query sheet, marked-up drawings, formal non- priced BOQ;
o Part 2 includes: individual report.
- Prepare all your work in a neat, tidy and professional manner.

Element 2
- Element 2 must be submitted as a single A4 pdf document, that has been "stitched" together, which will include your priced BOQ, rate build ups (calculations) and individual report. However, you need to separately identify part 1 and part 2 within the report.
o Part 1 includes: rate build-up calculations and the priced BOQ;
o Part 2: individual report.
- Prepare all your work in a neat, tidy and professional manner.

Reference no: EM131637932

Questions Cloud

Find the expected gain for holder of a european call option : Find the expected gain (or loss) for a holder of a European call option with strike price $90 to be exercised in 6 months if the stock price on the exercise.
How do you think your values and behavior might differ : How do you think your values and behavior might differ had you experienced the opposite pattern of mobility?
Define myasthenia gravis or guillain-barre syndrome : Provide an outcome for the nursing diagnosis that you selected making sure that is specific to the needs of the patient with myasthenia gravis or Guillain-Barre
Compute the arbitrage profit : Consider a stock whose price on 1 January is $120 and which will pay a dividend of $1 on 1 July 2000 and $2 on 1 October 2000. The interest rate is 12%.
Principles and practices of measurement and estimating : SRQ774 - CONSTRUCTION MEASUREMENT - Articulate a thorough understanding of the basic principles and practices of measurement and estimating.
Discuss life expectancy and make sure to support : Why is the population growing so rapidly. Discuss life expectancy and make sure to support you answer with evidence and statistics
What is the percentage drop of the forward price : Suppose that the price of stock on 1 April 2000 turns out to be 10% lower than it was on 1 January 2000. Assuming that the risk-free rate is constant at r = 6%.
Four different and specific recruitment sources : Identify four different and specific recruitment sources from which you could recruit candidates for this position.
Discuss terrorist threats or communicable disease : Preparing for disasters, terrorist threats, or communicable disease outbreaks is an important part of public health nursing

Reviews

len1637932

9/12/2017 3:15:34 AM

Individual Report The report gives a detailed and clear overview and analysis on how the assignment was compiled to fulfil the requirements of it in a professional workplace manner. Excellent contribution from the individual. Excellent collaboration and communication demonstrated. The report gives a good overview and analysis on how the assignment was compiled to fulfil the requirements of it in a professional workplace manner. Good contribution from the individual. Good collaboration and communication demonstrated. Minor bad practices demonstrated. The report gives a sound overview and analysis on how the assignment was compiled to fulfil the requirements of it in a professional workplace manner. Sound contribution from the individual. Sound collaboration and communication demonstrated. Some bad practices demonstrated. The report gives a basic overview and analysis on how the assignment was compiled to fulfil the requirements of it in a professional workplace manner. Basic contribution from the individual. Basic collaboration and communication demonstrated. Bad practices demonstrated.

len1637932

9/12/2017 3:14:59 AM

HD D C P N Marks Accuracy and appropriateness of take-off dimensions Excellently demonstrated accuracy and appropriateness of take-off dimensions. Well-demonstrated accuracy and appropriateness of take-off dimensions. Minor errors and omissions. Soundly demonstrated accuracy and appropriateness of take-off dimensions. Some errors and omissions. Basic accuracy and appropriateness of take-off dimensions is demonstrated. Contain errors and omissions. Poor accuracy and appropriateness of take-off dimension. 25 Understanding of ASMM measurement principles, taking off practice and accuracy of item descriptions in accordance with ASMM Excellently demonstrated understanding of ASMM measurement principles and taking off practice. Excellent accuracy of item descriptions in accordance with ASMM. Well-demonstrated understanding of ASMM measurement principles, taking off practice and item descriptions.

len1637932

9/12/2017 3:14:28 AM

o For element 2: All students within the group shall submit exactly the same PDF of “element 2 - part 1” with a separate individual report for “element 2 - part 2”. • Students MUST submit the completed report into the designated Assignment Dropbox on CloudDeakin for this unit. OTHER IMPORTANT INSTRUCTIONS • On-campus students MUST form their groups comprising 6 students from the on- campus group and enrol on the group folder created on CloudDeakin for this assignment. If you do not enrol by 4th, the Unit Chair will randomly allocate you to a group. • Off-campus students MUST form their groups comprising 6 students from the off- campus group and need to enrol on the group folder created on CloudDeakin for this assignment. If you do not enrol by 4th, the Unit Chair will randomly allocate you to a group.

len1637932

9/12/2017 3:14:19 AM

• The ELEMENT 1 should be submitted by Tuesday, 12th by 3pm through CloudDeakin (The due date and times are to be read as in accordance with AUSTRALIAN EASTERN STANDARD TIME only). • The ELEMENT 2 should be submitted by Tuesday, 26th by 3pm through CloudDeakin (The due date and times are to be read as in accordance with AUSTRALIAN EASTERN STANDARD TIME only). • Both elements are to be completed as a group but submitted on an individual basis .: o For element 1: All students within the group shall submit exactly the same PDF of “element 1 - part 1” with a separate individual report for “element 1 - part 2”;

Write a Review

Civil Engineering Questions & Answers

  Determine the improvement in efficiency and circulation rate

Now you want to improve the efficiency and circulation rate. You suggest operaing the cycle utilizing two reversible tubines with saturated vapor exit streams. All conditions remain the same except that the feed to the first turbine is steam at 450 C..

  Derermine the velocity and acceleration of point p

At the same instant the frame h, not the horizontal blade, rotates about a vertical axis with a constant angular velocity w=0.9 rad/s, measured relative to h

  Determine the diameter and the depth of the tank

A drinking water treatment plant will be designed to process a flow of 15,000 m3/d. The sedimentation tank will have a residence (detention) time of 4 hours and the overflow rate (Q/A) of 16 m3/m2-day

  What is the mean momentum flow rate down the pipe

Provided that the amplitude is sufficiently great, the human ear can respond to longitudinal waves over a range of frequencies from about 20 Hz to about 20000Hz. Compute the wavelength corresponding to these frequencies a.) for waves in air ( v= 344 ..

  How many liters per day of captured rain water are necessary

A paper mill releases 1 m^3/s of treated effluent at 75 C, which is mixed with captured rain water at 13 C before it is released to a nearby river. Regulations dictate that the effluent discharge cannot be over 20 C.

  In a truss analysis of a 100% symmetrical bridge

In a truss analysis of a 100% symmetrical bridge, are all of the forces on the beams of the opposite-side equal to those on one side?

  Calculate value of cohesion and angle of internal friction

A cylindrical soil sample fails under an axial vertical stress of 160 kN/m^2, when it is laterally unconfined. The failure plane makes an angle of 50 degrees with the horizontal.

  Calculate the coefficient of friction pk

If the conveyor belt B has a speed V2 = 3.0ft/sec. and the objects are delivered to this belt with no slipping, calculate the coefficient of friction πk between the objects and the chute

  Find the work and heat transfer per unit mass of air

Discuss the different cases and how they may be accomplished by insulating the cylinder or by providing heating or cooling.

  What will be the degree of saturation of the compacted

An earth embankment is compacted at water contect of 17% to a bulk density of 1.90 gm/cc.If the specific gravity of soil grains is 2.65, then what will be the degree of saturation of the compacted embankment ?

  What is the angle of inclination of the plane

A body slides down a frictionless plane and during the third second after starting from rest if it travels 20.4m. What is the angle of inclination of the plane?

  Construction loan and mortgage loan

Differentiate between construction loan and mortgage loan based on your understanding (using your own words). Define the following terms in your own words: (a) cap rate, (b) economic value of a project, and (c) gap financing.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd