Large inventories and manufacturing inefficiencies in plant

Assignment Help Operation Management
Reference no: EM132241534

ABC Inc. manufactures metal tables and chairs at its plant in Paxton, Illinois. Recently hired general manager, Bob Behar, is concerned about the large inventories and manufacturing inefficiencies in the plant. The Paxton plant has two separate assembly lines – one for chairs and one for tables. Demand for chairs is significantly larger than tables, so Bob decides to tackle the table assembly process for first. Bob has recently hired a summer intern, Eileen Mayer, who he asks to study the table assembly line and suggest ways to improve the process. Having recently completed a course on operations management, Eileen decides to create a value stream map for the process. Over a period of several days, she collects the following information about the process.

The Assembly Line

The assembly line operates one 8-hour shift per day, 5-days a week.

The Product

ABC makes one type of folding table. The table has two bent metal tubes that form the legs and a formed sheetmetal top.

Raw material storage

Raw material for the table assembly line consists of the formed sheet-metal tops which are manufactured in the sheetmetal forming department elsewhere in the plant, and steel tubes for the legs. The tabletops are made in batches of 2000 and brought to the assembly area and on average the amount of tabletop inventory is 1000.

Cut tubes for the legs are delivered by steel supplier, Steely Hollow, every week in batches of 4000 tubes, so there are on average 2000 tubes in inventory. In addition, there are hinge pins, fasteners, rubber feet and cardboard boxes that are required. These are ordered in large bulk quantities and stored at the respective assembly stations.

Hole punching

Holes for the hinge pins are punched in the tubes. There is no set-up time for this operation but tubes are punched in batches of 100. Eileen observes that the punching station can produce 120 hole-punched tubes every hour. She notes that there are approximately 2500 hole-punched tubes in a work-in-process storage area waiting for the bending operation

Leg Bending

In this operation, the hole-punched metal tubes are bent in the shape of a U. There is no set-up required for this operation. The bending operation requires 1 minute per tube and there are two bending stations that work in parallel. There are approximately 3000 bent tubes awaiting assembly.

Hinge assembly

Two bent U-tubes are assembled to form the folding base of by inserting hinged pins. There are two hinge assembly stations and assembly requires approximately 2 minutes for each table base. There are no setups required. Eileen observes that there are about 1200 assembled table bases waiting for final assembly.

Table Assemble

The tabletop is mated with the table base at the final assembly station. The operation requires careful adjustments and takes 3 minutes per table. There are three assembly stations. Assembled stations are transported immediately on a rolling conveyor to packing to avoid damage to the table.

Packaging

The assembled table is packed in a card box for shipping. Each table requires approximately 45 seconds to be boxed and there are two packaging stations. Packaged tables are shipped to BigMart twice a week. On average, therefore there are about 500 packaged tables waiting to be shipped.

Planning and Scheduling

To understand how the different stations received instructions about their daily schedules, Eileen spent a day with the production planning department. She learned that BigMart sends a monthly forecast of demand for tables electronically on the 25th of each month. In addition, a firm order for the week’s requirement is faxed to ABC on the previous Wednesday. ABC’s, planning department then looks at inventories and creates a work order for the week and a paper schedule is given to each station, except the Packaging station. Packaging does not need a schedule since it immediately packs whatever is made by Table assembly. The planning department also sends a weekly order for tubes to Steely Hollow, and tabletops to the sheetmetal forming plant.

To assist Eileen please answer the following questions

Draw a Value Stream Map for the table assembly process. Show all material flows, information flows and inventories. Draw a timeline showing processing times and waiting times.

Calculate the Takt time for the table assembly process.

For each step of the process, calculate the cycle time in minutes and the capacity utilization

Calculate the total lead time and total processing time in hours and minutes.

Reference no: EM132241534

Questions Cloud

Agreement among top managers about the organization goals : Companies with transformational leaders often show greater agreement among top managers about the organization's goals.
Disadvantages of collaborating on development project : What are some of the advantages and disadvantages of collaborating on a development project?
Extracting bio diesel out of genetically modified corn : A research associate at Applegate State University, has discovered a novel process of extracting bio diesel out of genetically modified corn.
Opinion about hospitals apologizing for medical errors : What is your opinion about hospitals apologizing for medical errors?
Large inventories and manufacturing inefficiencies in plant : Recently hired general manager, Bob Behar, is concerned about the large inventories and manufacturing inefficiencies in the plant.
Heightened awareness about our natural environment : What factors lead to a heightened awareness about our natural environment? Why was the environment much less of a public issue 20 or 30 years ago?
What is hadoop : What is Hadoop? How does it work?
Used for measuring this particular team performance : Identify a workgroup that you know. Define the metrics that you think should be used for measuring this particular team's performance.
Foster work environment that supports innovation-innovators : Discuss how an organization can foster a work environment that supports innovation/innovators.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd