Just-in-Time Manufacturing

Suppose that you have a machine that completes a specific process for manufacturing a product. This machine can complete the process of a sub-product within 3 minutes on average and the process completion time is exponentially distributed. Sub-products arrive randomly with a rate of 15 per hour at the station in front of the machine. The inter-arrival times of the sub-products is exponentially distributed.

There should always be an operator next to the machine and an operator's cost is $15 per hour. The machine has a cost of $20 per each hour it is active, i.e., processing a sub-product. Furthermore, the sub-products have a penalty for the time they spend from the moment they arrive at the station until their processes have been completed. Specifically, due to just-in-time requirements; the penalties for sub-products are given by the following schedule:

  • If the sub-product takes less than 10 minutes to be processed, the penalty is $1
  • If the sub-product takes between 10 and 15 minutes to be processed, the penalty is $2
  • If the sub-product takes more than 15 minutes to be processed, the penalty is $3

Please answer the following questions about the above system.

You can use the excel templates in your calculations. However, you need to show how you are using the information given by the excel template in your calculations as excel templates gives your only information for L, Lq, W, Wq, Pn, P(W>t), and P(Wq>t).

a) Describe the above system as a queueing system by defining

  • Customers, expected inter-arrival time, and arrival rate
  • Server(s), expected service time, and service rate
  • Express the queueing model using Kendall's notation

b) Explain if the above queueing system satisfies the following criteria by showing your calculations for each criterion.

  • On average, there should not be more than 2 sub-products waiting to start their processes at the station in front of the machine.
  • On average, there should be less than or equal to 3 sub-products waiting to start their processes at the station in front of the machine for at least 75% of the time.
  • On average, less than 50% of the sub-products should wait more than 5 minutes to start their processes at the station in front of the machine.
  • As the machine is a sensitive machine, the time it is active should not be 4 times more than the time it is inactive

c) Calculate the expected hourly cost of the queueing system. Expected hourly cost of the system includes the labor cost per hour plus the expected hourly cost of the machine plus the expected penalties charged per hour. Show your calculations.

Reference no: EM13538365

Questions Cloud

Find the electric field produced by each rod : Two thin, positively charged rods are placed along the x-axis and y-axis. Each rod is 3.00m in length, and is a distance 1.00m from the origin. Find the electric field produced by each rod individually at the origin
How differentiating 1-pentyne from 2-pentyne : Would MS help you with either of these problems? If yes, explain how. a) differentiating 1-pentyne from 2-pentyne
How much work is done on the mass by air resistance : A 1.0-kg mass is projected vertically upward from ground level with an initial speed of 45 m/s. How much work is done on the mass by air resistance
A plane polarized em wave propagates through a polymer : A plane polarized EM wave propagates through a polymer. Such waves obey a similar wave equation to that found for free space. The wave has a magnetic field vector, B=[(-1.2 i) x sin(ky wt)] microT (micro telsa) , with frequency f=7.61×10^(14) Hz and ..
Just-in-time manufacturing : Describe the above system as a queueing system by defining - Explain if the above queueing system satisfies the following criteria by showing your calculations for each criterion.
What is the maximum speed at which he can swing : Tarzan has a mass of 75.0 kg and is swinging on a vine that is 8.00 meters long. What is the maximum speed at which he can swing
How to calculate the value of the equilibrium constant : Calculate the value of the equilibrium constant for the overall solution process for the sparingly soluble salt in the presence of ammonia.
Federal aviation administration : Explain the queueing system at Dino-ville Airport by defining the customers, arrival rate, server, service rate and use Kendall's notation to define the queueing system.
How to calculate the solubility of the salt mx : Calculate the solubility (in moles/liter) of the salt MX in the presence of the common ion X- (concentration 1.90E-1 M) if the value of the solubility product constant Ksp for the salt is 1.00E-16.

Reviews

Write a Review

Other Engineering Questions & Answers

  Define the fundamental responsibilities and key

write a six to eight page paper in which younbsp1.define the fundamental responsibilities and key characteristics of

  Mechanical behavior of materials celebration of learning 02

mechanical behavior of materials celebration of learning 02 20 june 2014this is a take-home celebration of

  It is important to include who worked on what questions on

working with your group detail the steps needed to monitor administrate and secure the network in regard to online

  Generate a report on the type of clutch system

Investigate the clutch systems being displayed and generate a report on the type of clutch system and transmission it is used for

  Write a report on one of the two following topics1 discuss

write a report on one of the two following topics1 discuss the different agencies institutes centers and other national

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  1a company is confronting an energy efficiency problem in

1. a company is confronting an energy efficiency problem in which they are experiencing a quite high loss of

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  1 demonstrate knowledge and understanding of the key

1. demonstrate knowledge and understanding of the key engineering principles that underpin current geotechnical and

  Present a research paper on the topic - reservoir

present a research paper on the topic - reservoir characterisationgive preferences that will provides students with a

  Minimize the total operating cost

formulate a linear programming model for this problem. Define decision variables, and then define your constraints and objective function accordingly. Combine everything to get the final model.

  A small company is designing a new rigid commercial vehicle

a small company is designing a new rigid commercial vehicle. you are tasked with developing a spread sheet that allows

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd