Gemini fabricators-case study

Assignment Help Business Management
Reference no: EM1318262

Gemini Fabricators

(This case deals with inventory decision making and EOQ concepts.)

Gemini Fabricators produces parts and subassemblies for a number of small-volume manufacturers of specialized construction equipment, including bulldozers, graders, and cement mixers. Gemini also manufactures and distributes spare parts. The company has made a specialty of providing spare parts and replacement parts for equipment no longer in production by the original equipment manufacturers.

The Materials Management Group (MMG) orders parts - both for delivery to a customer's production line and for spares - from the Fabrication Department. Spares are stocked in a Finished Goods Store. Gemini's part number 650810/ss/R9/o is a wear part made only for spares demand. It has had demand averaging 300 units per week for more than a year, and this level of demand is expected to persist in the foreseeable future.

The MMG has been ordering 2600 units every other month for part number 650810/ss/R9/o from the Fabrication Department to meet the forecast annual demand of 15,600 units. The order is placed at the beginning of every other month. In order to provide Fabrication with scheduling flexibility, as well as to help with planning raw material requirements, a 2-week manufacturing lead time is allowed for parts.

In the Fabrication Department, 3 hours is now allowed for each setup for a run of part number 650810/ss/R9/o. This time includes strip-down of the previous setup; delivery of raw materials, drawings, tools and fixtures, etc; and buildup of the new setup. The 3-hour setup time is a recent improvement over the previous 4 hours, as the result of setup reduction activities in the Fabrication Department. The Fabrication Department charges $35 per hour for setups. Part number 650810/ss/R9/o enters the Finished Goods Stores at a full manufacturing cost of $40.44. The Financial Office has indicated a 10% per unit per year holding cost (based on its full manufacturing cost).

Case Questions:

1. What is the total annual cost of the present ordering policy for part number 650810/ss/R9/o?

2. What would be the lot size for part number 650810/ss/R9/o if Gemini were to use an economic order quantity (EOQ)?

3. How frequently would Gemini be ordering part number 650810/ss/R9/o if they were to use the EOQ?

4. What would be the total annual cost of using an economic order quantity for part number 650810/ss/R9/o?

5. What would the annual cost savings be if Gemini were to use an EOQ approach to ordering rather than the current policy of ordering 2600 units in each replenishment?

6. Assuming that the 300 units per week demand for part number 650810/ss/R9/o is fairly uniform, what would the reorder point be for this item?

Reference no: EM1318262

Questions Cloud

Determine the center and radius of the circle equation : Find the equation of the perpendicular bisector of the line drawn between two points and determine the center and radius of the circle equation.
Dimensions in new team environment : Describe your position based on the dimensions in the New Team Environment table for the environment that applies to you.
Recognizing the malicious activity : What do you think is the most effective method to explain if an attack has been made on the computer network include what malicious activities.
Size dependent on marital status : Can we conclude that car size is dependent on marital status? YES or NO (circle one)
Gemini fabricators-case study : Gemini Fabricators produces parts and subassemblies for a number of small-volume manufacturers of specialized construction equipment, including bulldozers, graders, and cement mixers.
Constructing histogram using a normal probability : Constructing histogram, Using a normal probability plot, Plotting residuals versus x values.
Baseline for the linux system : Describe briefly the purpose of the baseline. Explain the areas of system would you involve in the baseline for your Linux system?
What is standard purchasing system : SPS system would standardize purchasing practices for each Snad and Surf subsidiary and manage all purchasing information. System testing will be completed by end of the week. What kinds of documentation are required for this application?
How to describe the standard normal distribution : Describe the standard normal distribution. Explain why it can be used to find probabilities for all normal distributions.

Reviews

Write a Review

 

Business Management Questions & Answers

  Case study on bad news memo

Case Study on Bad News Memo or E-Mail

  Catfish creek canoe company

Report on Catfish Creek Canoe Company

  Describe how risk has impacted a project

Describe how risk has impacted a project that you have been associated with as a team member or project leader. Provide at least two instances where surprise events impacted the project and how the issue was resolved.

  Proctor and gamble business processes

Describe how information systems enhance Proctor and Gamble's business processes. Suggest how the company has used information system(s) or any technology to achieve a competitive advantage.

  Write a report on a new photocopier

Write a report on a new photocopier which the accounting firm can purchase.

  Conflict management and negotiation

Legitimate power belongs to someone who occupies a particular job, office, or position in an organizational hierarchy. There are times when people respond to directions from someone with legitimate power even when they do not want to because they ..

  Self supporting growth rate

How large a sales increase can the company achieve without having to raise funds externally; that is, what is its self-supporting growth rate?

  Identify policy problems that solved by government actions

Identify three policy problems listed and determine an appropriate indicator or index that would help determine whether each of the identified problems are being solved through government action. Justify your position on each. Work alienation, Sch..

  Analysis of wal-mart

Analysis of Wal-Mart as an MNE and its international position using concepts learned in class (for example, CSA/FSA, Hofstede's model etc.) Discuss factors considered in developing international business in China including the political environm..

  What kind of tool is this

On the back of an envelope, Phoebe writes: "I promise to pay $ 600 Characteristic or bearer on demand [Signed] Phoebe .." What kind of tool is this?

  Organisational structure and culture

Understand the relationship between organisational structure and culture

  Delegation of contractual rights as well as duties

Belinda will win for the reason that the contract did not contain an express provision prohibiting assignment or delegation of contractual rights as well as duties

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd