Formulate the lp model to minimize weekly shipping cost

Assignment Help Basic Computer Science
Reference no: EM13233298

1. J. Sells the dietician at Kalous Hospital must prepare a breakfast menu for patients with Lazzari's Disease. The table below summarizes the relevant data per ounce for each of the three food groups. The meal must consist of at least 10 ounces. Lazzari's patients require high Vitamin A low Vitamin B diets. Thus the diet must contain at least 20% Vitamin A and no more than 10% Vitamin B. At least 20 percent of the calories should come from cereals. Formulate the LP model to minimize cost.

Cost

per ounce       Vitamin A        Vitamin B Calories

Eggs                   $0.50        10%            10%        60

Bacon Strips             $0.90        30%             20%        120 

Cereal                  $0.20        15%            5%         90

Objective function: ______________________________________________

ST.

2. Lakeside Boatworks is planning the production of their fiberglass recreational boats for the next four months. The forecasted demand is 450 for April, 420 for May, 450 for June and 500 for July. The production capacity is 470, 450, 380 and 470 for April, May, June and July respectively. The projected production costs are $7,000 for April, $8,000 for May, and $9,000 for June and July. Boats that are not sold in the months in which they are produced can be put into storage for sale during the following months. Each month, the inventory costs are $50 per boat. A maximum of 70 boats can be put into storage at the end of each month. It is possible to use overtime labor in April to produce an additional 50 boats at a cost of $7,500 per boat. Formulate the LP model to minimize production and inventory costs and meet the demand for the next four months.

Objective function: ______________________________________________

ST.

3. At the end of each week, General Appliance ships (by truck) refrigerators that they produce in plants located in Atlanta and Boston to distribution centers located in Chicago, Denver, and Eugene. Relevant shipping costs are presented in the table below. The route from Boston to Eugene is serviced by only one truck and is therefore limited to 50 units shipped per week on this route. In addition, refrigerators can be sent from the distribution center in Chicago to Denver at a cost of $30 per unit. Finally, it is possible to ship refrigerators by freight from Boston to Eugene for a price of $80 per unit, but only if the weekly shipment amount is exactly 200 units per week. Formulate the LP model to minimize weekly shipping cost.

Distribution Centers

Plants            Chicago           Denver           Eugene           Supply

Atlanta           $40              $65        $120       500

Boston            $50              $60        $130       400

Demand          300              300        300

Objective function: ______________________________________________

ST.

Attachment:- 1.rar

Reference no: EM13233298

Questions Cloud

Define the gravitational force : Does an apple tree exert a gravitational force on the earth and if so, how large of a force, Consider and explain this question when the apple is attached to the tree
What are at least four supply-chain management strategies : What are at least four supply-chain management strategies used in Regal Marine? Present and explain them.
Explain solutions are separated by a membrane : Suppose that two equal volumes of 0.2 molar NaCl (aq) solutions are separated by a membrane and that the left -hand compartment of the experimental arrangement contains a polyelectrolyte molecule Na6P at a concentration of 50 g/liter
Point out which following functions exist and which cannot : Point out which of the following functions can exist and which cannot
Formulate the lp model to minimize weekly shipping cost : Formulate the LP model to minimize weekly shipping cost and formulate the LP model to minimize production and inventory costs and meet the demand for the next four months.
Perform a decision tree analysis of this problem : Mountain States Electric Service is an electrical utility company serving several states in the Rocky Mountains region. It is considering replacing some of its equipment at a generating substation and is attempting to decide whether it should repl..
Was stalin the appropriate successor to lenin : Was Stalin the appropriate successor to Lenin? Who would have been a better successor than Stalin?
Calculate the maximum current in the inductor : A 2.30-?F capacitor is fully charged by being connected to a 6.0-V battery, Calculate the maximum current in the inductor, Calculate the frequency of oscillation of the LC circuit
Compute pcu2 : Calculate pCu2+ at each of the following points in the titration of 50.0 mL of 0.001 M Cu 2+ with 0.001 M EDTA at pH 11.00 in a solution whose NH3 concentration is somehow fixed at 0.100 M: a) 45.0 mL b) 50.0 mL c) 55.0 mL

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Four techniques for analyzing

Briefly compare and contrast the four techniques for analyzing the costs and benefits of a proposed system. What do you see as particular strengths and weakness of each method?

  Create user-s requirements specification for easydrive

Create a user's requirements specification for the EasyDrive School of Motoring database system. Use a single major user view for the application (Director View).

  What are the pro''s and con''s of digital rights managment

What are the pro's and con's of Digital Rights Managment

  Write the definition of a class clock

Write the definition of a class Clock . The class has no constructors and three instance variables. One is of type int called hours , initialized to 12 , another is of type boolean called isTicking , initialized to true , and the last one is of ty..

  How entry level manager adjust able to grow into upper level

How do you think an entry level manager has to adjust to be able to grow into an upper level manager

  Design a ram chip

Design a RAM chip that is 128K x 8. For each sub-part below, show the array of RAM cells and its dimensions, the decoder(s) required to access the array, and tabulate the numbers of gates required to implement the decoding.

  Create direct-mapped data cache for the byte offset

Create the 128KB direct-mapped data cache which uses a 32 bit address and 16 bytes per block. Compute the following: How many bits are utilized for the byte offset?

  What hit rate is required for the cache to produce a 50%

One option used to speed up disk drives is to add a cache that hold either recently accessed blocks, blocks waiting to be written to the disk, or that is used to "prefetch" blocks for a file. If the disk speed is approximately 3ms for a block and the..

  Should employees be allowed to text message

Should employees be allowed to text message each other during the meeting? As a manager, are there concerns you might have if employees have digital cameras on their cell phones? Read the responses of a few of your classmates. Do you agree with th..

  What role to assign to four workstations

What role (or roles) would you assign to each of the four workstations and any other equipment you recommend? What type of upgrades, if any, might the workstations require to make your solution work?

  Programmers creating program of high quality

Write down technical paper on "Our goal is to aid programmers create program of high quality - programs that reliable, efficient, and reasonably.

  Draw a flow chart and hierarchy chart

Draw a flow chart, hierarchy chart, and write pseudocode for the following problem. • A weather sensing system calculates & prints a report on the following: ? Average temperature ? Highest temperature ? Lowest temperature ?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd