Reference no: EM132591057
Crede Manufacturing Company uses a standard cost accounting system. In 2020, 27,000 units were produced. Each unit took several kilograms of direct materials and 1.6 standard hours of direct labour at a standard hourly rate of $15. Normal capacity was 49,600 direct labour hours. During the year, 113,400 kg of raw materials were purchased at $0.92 per kilogram. All materials purchased were used during the year.
Question 1: If the materials price variance was $9,072 favourable, what was the standard materials price per kilogram? (Round answer to 2 decimal places, e.g. 5.25.)
Question 2: If the materials quantity variance was $5,400 unfavourable, what was the standard materials quantity per unit? (Round answer to 2 decimal places, e.g. 5.17.)
Question 3: What were the standard hours allowed for the units produced?
Question 4: If the labour quantity variance was $10,950 unfavourable, what were the actual direct labour hours worked?
Question 51: If the labour price variance was $21,965 favourable, what was the actual rate per hour? (Round answer to 2 decimal places, e.g. 15.25.)
Question 6: If total budgeted manufacturing overhead was $386,880 at normal capacity, what was the predetermined overhead rate? (Round answer to 2 decimal places, e.g. 15.25.)
Question 7: What was the standard cost per unit of product? (Round answer to 2 decimal places, e.g. 15.25.)
Question 8: How much overhead was applied to production during the year?
Question 9: Using selected answers above, what were the total costs assigned to work in process? (Round answer to the nearest whole dollar, e.g. 5,275.)
|
What is the partial pressure of the third gas
: The individual pressures exerted by neon and argon are 0.68 atm and 0.35 atm, respectively. What is the partial pressure of the third gas, helium?
|
|
What is the volume of the solution in milliliters
: If 2.24 of CuNO3 is dissolved in water to make a 0.740 M solution, what is the volume of the solution in milliliters?
|
|
How solve the net present value of the project
: Calculate the Net Present Value of this project.Equipment costing $300,000 will be required immediately. The equipment will be straight line depreciated
|
|
Discovery health turns big data into better healthcare
: How big is big data for Discovery Health? What big data sources did Discovery Health use for their analytic solutions?
|
|
Find what were standard hours allowed for units produced
: If the labour price variance was $21,965 favourable, what was the actual rate per hour? (Round answer to 2 decimal places, e.g. 15.25.)
|
|
How many performance obligations exist in this contract
: Ortiz delivered and installed the equipment and software on August 1, 2021, How many performance obligations exist in this contract
|
|
Forensics to speed up the process of collecting data
: What can we do in forensics to speed up the process of collecting data? Hypothesize a solution knowing what you know about network data collection.
|
|
What is value of ending inventory under absorption costing
: 25,000 units, and sold 20,000 units, leaving 5,000 units in inventory at year-end. What is the value of ending inventory under absorption costing?
|
|
What is the volume of the solution in milliliters
: If 2.24 of CuNO3 is dissolved in water to make a 0.740 M solution, what is the volume of the solution in milliliters?
|