Find the lateral area of the frustum

Assignment Help Civil Engineering
Reference no: EM13207633

a regular hexagonal pyramid has an upper base edge of 16 ft. and a lower base edge of 28 ft. if the volume of the frustum is 18041 ft^3., find the lateral area of the frustum.

Reference no: EM13207633

Questions Cloud

Explain when a system is in a state of chemical equilibrium : When a system is in a state of chemical equilibrium, a state of apparent rest, is anything going on at the molecular
Compare and synthesize the research : The objective is to integrate, compare and synthesize the research so that you are looking at the same question on different dimensions and with different tools. This is how research is done.
During world war I-civil liberties : During World War I, civil liberties in America were
Are textbooks complements or substitutes for air travel : Alexander studies away from home. While at school, he spends all his income on air travel and economics textbooks. In a diagram with air-travel as the x-axis good, as pair increases while ptext remains unchanged, Alexander's price consumption path..
Find the lateral area of the frustum : a regular hexagonal pyramid has an upper base edge of 16 ft. and a lower base edge of 28 ft. if the volume of the frustum is 18041 ft^3., find the lateral area of the frustum.
What the meaning of steady state : could you please help me to figure out what the meaning of steady state in the pavement management system preservation and rehabilitation.
Dangerous environments : Do you think that people are willing to follow their GPS anywhere, include dangerous environments? Do GPS technologies affect our awareness of geography and why?
Explain when a chemical change has occured : What observations might enable us to deduce that a chemical change has occured when dilute aqueous
What will the freeway density : What will the freeway's density and level of service be before and after the ban? (Assume that the trucks are removed and all other traffic attributes are unchanged)

Reviews

Write a Review

Civil Engineering Questions & Answers

  Esimating the capacity of the roadway

Given s=.30/(60-u), where s is the spacing (space headway) in miles, and u is the speed in miles per hour, derive the relationships u-k, u-q, and q-k. Also, estmate the capacity (qmax) of the roadway.

  Calculate the water or cement ratio of the cement paste

Calculate the water/cement ratio of the cement paste in which all the cement will hydrate to leave no capillary pores. (density of cement: 3.1 g/cm3) ?

  Concentration of moles in the tank solution

HOCL is added to water in a tank as a disinfectant. After equilibrium is reached it is found that the pH of the water in the tank is 8.2 and the gas phase partial pressure is the head space of the tank is 0.2E-7 atm.

  Magnitude of shaft work obtained from the turbine

If the amount of heat transfer in the HE unit is 2460 kJ per kg of steam, what is the magnitude of shaft work obtained from the turbine in kW?

  Rectangular duct carries air

A 30mm pipe X 460 mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.

  Total mass-quality of steam-specific volume

Find the total mass, quality of steam, specific volume, specific enthalpy, and specific internal energy.

  Prtoblem on uniform decelerated motion

Assuming uniformly decelerated motion, determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.

  Determine the moment of the force

A force, 90 N in magnitude, is applied to control rod AB as shown. Knowing that the length of the rod is 225 mm, determine the moment of the force about point B by resolving the force into components along AB and in a direction perpendicular to AB..

  Find the optimal solution

The company would like to distribute the songs between the two CDs such that the used space on each CD is about the same. Formulate the problem as an IP, and find the optimal solution.

  Perception-reaction time on a roadway

An engineering student is driving on a level roadway and sees a construction sign 180 m ahead in the middle of the roadway. The student strikes the sign at 56 kph. If the student was traveling at 90 kph when the sign was first spotted, what was th..

  What is the elevation of lower point

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and slope distance with 16m steel tape.

  Force required to hold the pipe

A 0.3-m diameter pipeline terminates in a nozzle of outlet diameter = 0.15 m. When water flows through this pipe at a rate of 0.25 m3/s, the force required to hold the pipe (N) is most nearly.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd