An industrial off gas steam must be treated for both particulates and SOx. The gas is at 1500 degrees F and 1.5 atm of pressure containing 80 mg/cubis meter of particulates and 25 mg/cubic meter of SOx. A two unit system is bring considered consisting of a cyclone followed by a venturi scrubber. The cyclone would remove 5% of the SOx (see below for particulates)with a pressure drop of 0.2 atm and no change in temperature.The scrubber would remove SOx with 95% removal efficiency (see below for degrees F) accompanied by a pressure drop of 0.3 atm and a temperature drop of 1000 degree F.The standard gas flow rate is 2000 scfm.Determine the emmisiion rate (kg/minute) for both particulates and SOx as well as the actual gas flow rate (acfm) emittted.Also determine the actual concentration (mg/cubic meter) for both pollutants for their emissions.
PARTICLE SIZE=0-5,5-10 AND >10PARTICULATE % BY WEIGHT=5,20 AND 75REMOVAL EFFICIENCY OF CYCLONE(%)=40,80 AND 92REMOVAL EFFICIENCY OF SCRUBBER (%)=95,98 AND 99.
A glass jar is heated in an oven and sealed when the air pressure is 103 kPa and the temperature is 105 C. Find the absolute, gage, and vacuum pressures in the jar when it cools to 20 C.
A completely reversible air conditioner provides 21,000Btu/h of cooling for a space maintained at 81degF while rejecting heat to the environmental air at 91degF.
Determine the critical depth in a trapezoidal channel with a 20 foot bottom width and 3:1 (H:V) side slopes if the Q = 1000cfs.
Draw the Bending Moment and Shear Force diagrams for the girder and calculate the maximum tension in the cable.
Imagine a slide with a radius of 1.5 m and a vertical drop of 2 m per turn. Further suppose that one of my daughters is sliding down at a constant speed of 2 m/s
Suppose that a person who boards the elevator on the ground floor gets off on the fifth floor. Assuming that the elevator has achieved operating speed by the time it reaches the second floor and that it is still moving at its operating speed as it..
Maintenance expenses for a bridge in Georgia are estimated to be $200,000 for the first eight years followed by two separate million dollar expenditures in years 12 and 18. The expected life of the bridge is thirty years.
A hole is drilled in an aluminum plate with a steel drill bit whose diameter is 6.245 cm at 20 degrees Celsius. In the process of drilling, the temperatures of the drill bit and plate rise to 168 degrees Celsius.
an average vehicle puts out nearly 20 lbm of carbon dioxide into the atmosphere for every gallon of gasoline it burns, thus one thing we can do to reduce global warming is to buy a vehicle with higher fuel economy.
Link ABrotates through a limited range of angle β, and its end Acauses the slotted link ACto rotate also. For the instant represented where β= 60 and = 0.6 rad/sconstant, determine the corresponding value of r r'.
How many mL of water will it take to get 10 pounds of dry aggregate to a moisture content of 5%. 1 kg=2.2 pounds
A concrete pipeline is installed to deliver 6m^3/sec of water (10degressC) between two reservoirs 17 km apart. If the elevation difference between the two reservoirs is 12m, what is the required pipe size
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd